Total construction area:160000m2
Development cycle: 3 years
Total number of households: 1 17 1
Parking spaces: 650
Parking space rental price: 80 yuan/person/month.
Developer: Guangxi Jinda Real Estate Development Co., Ltd.
Investor: Guangzhou Xingyun Real Estate Group.
Property management company: Shenzhen Peng Ji Property Management Co., Ltd.
Agent: Guangzhou Midland Bank.
Architectural design unit: Shanghai Hualan Architectural Environment Planning and Design Co., Ltd.
Lotus pond moonlight is located at the junction of Keyuan Avenue and Xiang Xiu Avenue in High-tech Zone, south of Kuaihuan, Xiangsihu New District in Nanning, with a total area of nearly 80 mu, a total construction area of nearly 1.6 million ㎡, a plot ratio of 2.8 and a greening rate of 30%. * * * Planned 1, 7 1 household, with multiple floors and small height.
The community center has set up a large water garden landscape. A 60-meter-long green belt separates it from the Expressway (Xiang Xiu Avenue). The first phase is basically sold out; The second term [Jas Pouch Lee] officially accepted the appointment on April 15, 2006.
The specific delivery time of Moonlight over the Lotus Pond is as follows: the first issue is June 30, 2006, and the second issue is September 30, 2006.
Standard for Moonlight Decoration of Lotus Pond (Multilayer)
(1). Exterior wall elevation: exterior wall: advanced paint.
(2) Residential part: structure: suspended ceiling of frame structure: cement mortar screeding internal wall: cement mortar screeding ground: cement mortar leveling doors and windows: entrance doors are fire doors, others.
For more information about moonlight in the lotus pond, please visit.
r2