When it is used for the first time, the heating should be carried out gradually. When using geothermal floor, everyone must pay attention to slowly heating the floor and floor. During installation, the ground temperature should be kept at about 65438 08℃. Before installation, the cement floor must be heated gradually, only 5℃ per day. During the first three days after installation, the temperature must be maintained, and after three days, the temperature can be adjusted as needed, but everyone should remember that it can only increase by 5℃ every day. For example, when it is used for the first time, the temperature should be raised continuously for the first three days: the water temperature 18℃ on the first day, 25℃ on the second day and 30℃ on the third day, but it can be raised to normal temperature, that is, 45℃ on the fourth day, and the surface temperature is between 28℃ and 30℃. If the temperature rises too fast, the floor is likely to crack and distort due to expansion. If the local heating system needs to be started again after being stopped for a long time, the first use method should be followed.
?
Before 0 1
Jin Shiyuan, Master of Traditional Chinese Medicine: Now some people just work overtime fo