Current location - Health Preservation Learning Network - Health preserving class - How to maintain the floor heating after installation?
How to maintain the floor heating after installation?
After the general floor heating system stops running, the floor heating pipeline is generally maintained with water. But instead of keeping the original hot water for heating, let the original water go, then flush the water pipe and the heating coil, re-inject the chemically treated water into the water pipe, run the boiler until the water in the heating system rises to 60-70 degrees, keep it for about an hour, and then exhaust the air in the pipeline through the open system exhaust valve. When the excess air is completely removed, close the valve of the whole floor heating system, stop the operation of the boiler, and gradually let the water cool, so as to reserve the water in the water pipe for the next heating season. In addition, major cities are preparing for the decoration season exhibition recently. I believe many consumers will prepare to buy decoration products, but everyone in the exhibition hall is eager to sell products, and few people will patiently explain how to use them. Then, before the major decoration exhibitions, Uncle Ople HVAC is here to explain how to use floor heating reasonably for users who are ready to install floor heating.

When it is used for the first time, the heating should be carried out gradually. When using geothermal floor, everyone must pay attention to slowly heating the floor and floor. During installation, the ground temperature should be kept at about 65438 08℃. Before installation, the cement floor must be heated gradually, only 5℃ per day. During the first three days after installation, the temperature must be maintained, and after three days, the temperature can be adjusted as needed, but everyone should remember that it can only increase by 5℃ every day. For example, when it is used for the first time, the temperature should be raised continuously for the first three days: the water temperature 18℃ on the first day, 25℃ on the second day and 30℃ on the third day, but it can be raised to normal temperature, that is, 45℃ on the fourth day, and the surface temperature is between 28℃ and 30℃. If the temperature rises too fast, the floor is likely to crack and distort due to expansion. If the local heating system needs to be started again after being stopped for a long time, the first use method should be followed.

?