1. During installation, the foundation must be compacted and the concrete strength grade should be high.
2. During installation, the top surfaces of all anchor bolts must be on the same horizontal plane.
3, after the installation is completed, the foundation concrete pouring should be water conservation, so that the concrete design strength inspection.