/kloc-Matters needing attention and decoration steps for 0/40m2 small apartment duplex decoration
The duplex room is characterized by connecting the first floor and the second floor through stairs, and the spacious space needs unique decoration. So what are the precautions of140m2 duplex decoration and the steps of140m2 duplex decoration?

1. 140㎡ Matters needing attention in small apartment duplex decoration 1. Do not use mirror stainless steel or silver metallic paint for the internal escalator design of double-sided buildings. Use stainless steel as an escalator and frosted stainless steel as a rabbit. The most ideal materials for escalators are forged steel, cast iron, wood and ceramics.

2. The balustrade of a double-story building is best made of wood or stone.

3. The composite concrete floor is used as cement concrete or iron structure and wood. The purpose is to reduce the sound of walking when walking.

4. The decorative height, slope, durability, railing width and pedal shape of double-storey buildings all bring inconvenience to avoid walking.

Two? 140 square meter small apartment duplex decoration steps 1, design: according to the total area of the apartment and its preferences, especially small apartments, it is recommended to adopt simple storage performance.

2. Including wall demolition and two-stage construction, this step can reflect the general pattern, and then it will take a long time to complete. You should pay attention to the garbage generated in this process and clean it up in time so as not to affect the step-by-step construction.

3. Hydraulic conversion: Pay attention to site supervision during construction, and don't cut corners or use fake water pipes. Otherwise, it will have a great influence in later life.

4. Woodworking: Because the construction technology is very demanding, you can build your own experience, but it is best to ask the owner for the price, because the prices vary from place to place. You'd better check your work.

5. Tiles: In addition to the tiles on the ground, the marble window frame should be completed at the same time before the cement master makes it, giving the owner a general suggestion.

6, wall painting finishing: there are many kinds of wall decoration materials on the market, and there are many styles, each with its own advantages. Shopkeepers must choose matching styles.

7. Ceiling of kitchen and bathroom: Even for the latter problem, because it is easy to install, choose the best waterproof material when choosing the ceiling material, because the particularity of the environment needs maintenance.

8. Cabinet installation: If you buy a cabinet, the installation only takes one day, and choosing custom will increase the required time.

9. Wooden doors and cabinets can be installed, but don't delay the construction period. Be sure to buy them in advance.

10, packaging wallpaper: After the wooden door is installed, you can paste wallpaper or putty powder according to your own preferences.

1 1, radiator installation: after the wall decoration is completed, the radiator can be installed, which can be omitted if necessary.

12, installation of switch sockets: First of all, you can know the type and quantity of total sockets from the hydropower host, but you must know.

13, install selective lighting, so as not to affect the appearance. If it is very high, it is very important to choose a suitable and overall style.