Quality safety and civilized construction management measures?
In order to strengthen the construction management of this project, improve the quality of the project, enhance the quality and safety awareness of all construction teams, and standardize the construction, the following detailed rules are formulated, which are expected to be seriously implemented by all construction teams.

A, concrete engineering

1. Before concrete pouring, the foot of the wall column should be blocked in advance (the carpenter of the project department should be responsible for it in advance if it exceeds 20mm) to avoid root rot. When pouring concrete, commercial concrete shall not be added with water at will. According to different concrete grades, the wall column is poured first, and then the beam slab is poured. When pouring beam slab concrete, it should be vibrated carefully, and there should be no honeycomb, pits and vibration leakage. Strictly control the leveling elevation of concrete, and control the surface smoothness according to the 500-line and technical disclosure. The surface layer should be even and flat, and the plastic film should be covered completely. During the construction in spring and summer, after concrete pouring 12 hours, water shall be sprayed in time for maintenance for not less than 7 days, and it shall be guaranteed for not less than 3 times every day. The fine is 100 yuan each time, and 500 yuan will be fined for not sprinkling water for one day.

2. When pouring concrete, the ground ash should be cleaned and used in time, so as to clear the material after work. If the material is wasted, the material loss will be doubly punished.

3. Before concrete pouring, the warehouse should be cleaned, the wooden pattern should be wetted with water, and the beam-column summer-planting (including wall and stigma) should be cleaned. When pouring, the same grade of bonding slurry (column, wall thickness 50- 100MM) should be used, and the construction joints should be left in the position allowed by the design, designated by technicians, sealed with formwork and kept straight, and the surface of column and plate should be controlled according to the elevation. The concrete shall be vibrated and compacted, and there shall be no honeycomb pits exceeding 200 square centimeters, so as to prevent vibration leakage and slag inclusion (including rotten feet of column feet).

4. When pouring concrete, it is forbidden to trample the steel bar at will to ensure that the steel bar configuration meets the design requirements.

Second, the steel engineering

1. The construction must be carried out in strict accordance with the design drawings.

2. The specification, shape, size, quantity, anchorage length and joint position of reinforcement shall meet the design requirements and construction specifications.

3. The welding of steel bars shall be kept as required and shall be qualified.

4. Steel binding should be firm, and the number of gaps and openings should be controlled within 10% and should not be concentrated.

5. The hook is oriented correctly, the binding joint conforms to the specifications, and the lap length is not less than the design value.

6. The thickness of reinforced protective layer should meet the design requirements, and the spacing between blocks should be appropriate. When the reinforcement is small, the spacing between blocks should be dense.

7. After the steel binding is completed, do a good job of self-inspection for the acceptance of the project department, supervision and construction unit.

8. During the construction period, special personnel must be assigned to guard the warehouse, and the warehouse keeper must be serious and responsible, and repair the deformed steel bars at any time, and pay attention to the fact that the formed steel bars are not allowed to be trampled, paying special attention to the protection of negative reinforcement.

9. Clean up and use the inexhaustible steel bars on each floor in time, so that the materials can be cleared after work, and no large amount of steel bars can remain, otherwise the steel bar team will compensate for the losses.

Third, the template project

1. In the process of formwork fabrication and installation, strict ingredients are adopted to control the flat-fell seam of formwork within 2mm, especially at the bottom of beam, the intersection of beam root and wall column, and the external angle of wall column. Gaps exceeding 5mm shall be glued with double-sided adhesive tape, and XB roof shall be glued with adhesive tape. Every time double-sided tape and transparent tape are found, there will be flower corners, lace and pits after concrete pouring. According to the pop-up 300 control lines on each floor, the position of each beam bottom is strictly checked, and the allowable deviation is controlled within 5 mm. 2. According to the pop-up 500mm line structure and the construction drawings of each floor, the template elevation is strictly controlled, and the surface flatness of each room template is controlled within 5 mm, and it is forbidden to exceed10 mm; 3. Strictly check the verticality, flatness and axial displacement of each wall column according to the 300mm pop-up control line on each floor, so as to enhance the stability of the frame body and avoid the displacement and deformation of the wall forming concrete.

2. When the formwork is installed, the construction must be standardized according to the requirements of drawings, the axis and formwork sideline should be put away, and the level should be set to control the elevation. The templates used should be coated with isolation agent and stacked in different categories. After the acceptance of reinforcement, formwork installation shall be carried out. It is required that the joints should be tight and not leak slurry, the axis and elevation should conform to the regulations, the deviation of beam-column joints should not be too large, the thickness of concrete walls should be consistent, the formwork should be vertical, and the top pulling should be firm and reliable. For beams and slabs with a span of more than 4M, bulging should be carried out according to regulations to prevent uneven stress, distortion and scratches on the middle part of the beam. The embedded parts and holes fixed on the template shall not be missed and shall be installed firmly. When the concrete label of beam slab and wall column is inconsistent, the junction of beam and wall column shall be bound with steel wire mesh according to regulations to prevent concrete from leaking and affecting the quality of concrete pouring. If it is leaked, it will be punished. Installed templates must be self-checked, and submitted to the project department and supervision for inspection and acceptance after passing the inspection. When pouring concrete, there should be someone to look after the warehouse in case of emergency.

3. Form removal: When the bottom form and its support are removed, the concrete strength should meet the design requirements, and it can only be removed with the permission of the builder. When the formwork is dismantled at an altitude of more than 4M, the formwork materials shall not fall freely, and the formwork materials shall not be pried off in a large area. After the template materials are removed, they must be cleaned up, coated with release agent, and stacked in categories. The scattered parts should be stored in boxes and bags.

Fourth, masonry engineering

1. The mixing and preparation of mortar should be carried out in strict accordance with the mixture ratio, and the sand must be sieved before use. Mortar should be used when mixing. Cement mortar and cement mixed mortar should be used within 3 hours and 4 hours respectively. When the temperature exceeds 30 degrees, it should be used within 2 hours and 3 hours respectively.

2. Bricks (blocks) should be watered and wetted 0-2 days before use. Masonry quality requirements are horizontal, vertical, full mortar, correct assembly and reliable summer-planting. The corner and junction of masonry should be built at the same time, and the temporary discontinuity that cannot be built at the same time and must be preserved should be built into an oblique if, and the horizontal projection length of the oblique if should not be less than two-thirds of the height; Vertical mortar joint can not have open joint, blind joint and false joint; The mortar plumpness of horizontal mortar joint is not less than 80%, and the mortar joint thickness is controlled within 10mm; Axis displacement and verticality shall not exceed the specifications.

Verb (abbreviation for verb) installation project

1. The switch and socket box embedded by the electrician must strictly control the elevation position according to the structural line 500, and shall not be offset. Boxes with the same height as the wall must be consistent, and gouging is not allowed, otherwise 50 yuan will be fined every time.

2. The box embedded in the concrete slab must be fixed firmly, and the conduit should be bound firmly. When PVC pipes cross beams, sleeves should be added to avoid flattening. When pouring concrete, the attendant should try to avoid pipeline blockage. If it is found that the wallboard and roof are chiseled, it will be fined 200 yuan every time and repaired by itself.

3. All kinds of boxes must be reserved accurately, and shall not be omitted, resulting in late gouging, and each box shall be fined 200 yuan.

Six, safety and civilized construction

1. You must wear a safety helmet when entering the construction site (and it is a uniform standard safety helmet stipulated by the company), and you must wear a safety belt when working on the edge of the sky. It is forbidden to urinate anywhere in the construction area, steal materials from the construction site and fight. Do not work after drinking. During the construction period, you should follow the operation procedures and standardize the construction, so that the materials are clean after work, and the remaining materials are packed neatly and are not allowed to be thrown around. Each construction team is required to do a good job in pre-shift safety activities, not to carry out construction without disclosure, and to pay more attention to safe and civilized operation procedures. According to the laws, regulations and relevant provisions of construction safety production, combined with the actual situation, the construction personnel have a more comprehensive understanding, improve the safety protection level of the construction personnel on site, and do a good job in civilized construction.

Seven, reward and punishment system

1. Anyone found not wearing a safety helmet on the construction site will be fined 100 yuan each.

2. 200 yuan will be fined every time he does not wear a seat belt when working high above the border.

3. On the construction site, the team will be fined 100 yuan for littering and leftovers (especially in the reinforced area). Anyone who urinates or urinates anywhere in the construction area will be fined 100 yuan and cleaned up.

Anyone who fights on the construction site, for whatever reason, will be fined 2000 yuan. If the circumstances are serious, they shall be sent to judicial organs for handling, and those who steal property at the construction site shall be fined above 500 yuan.

5. Those who wear slippers in the construction area will be fined 20 yuan every time.

6. If the construction team fails to receive the notice from the contractor, it will be fined 1000 yuan.

7. Whoever ignores the instructions of the builder will be fined 200-500 yuan. During the construction period, if you do not pay attention to saving and cause waste, you will be fined 5 times the price of wasted materials.

8. The axial displacement of formwork works exceeds the standard, and the fine is 100 yuan, and heavy punishment will be given according to the severity of permanent defects.

9. Column rebar displacement (including GZ) exceeds the standard, and it will be fined 100 yuan.

10. Reinforcement insertion in beam and column: Misinsertion and missing insertion will be punished 100 yuan.

1 1. The protective layer of the warehouse is not responsible for leakage, and the rebar leakage will be fined 100 yuan after formwork removal. If the remaining steel bars are not cleaned in time, each bar will be fined 100 yuan.

12. If the concrete pouring sand is not sieved, it will be fined 100 yuan each time; Every time the mixture ratio does not exceed the standard seriously, it will be fined 100 yuan; 50 yuan will be fined for not cleaning and maintaining the machinery and equipment after use. 50 yuan was punished for failing to clean up the ground ash in time after concrete pouring.

13. If the beam-column joint is not cleaned and slag inclusion is not formed during casting, it will be fined 100 yuan.

14. The cast-in-place components with honeycomb and pits of more than 200 square centimeters each will be fined 100 yuan for vibration leakage (rotten feet of columns).

15. If the concrete pouring does not conform to the elevation, 50 yuan will be punished for every time it exceeds the standard.

16. The formwork support is not firm, and the slurry leakage is serious, and the fine is more than 1000 yuan. 200 yuan will be fined for template expansion, 50 yuan will be fined for vertical exceeding the standard, and 20 yuan will be fined for each remaining piece (piece) if the template materials in the library are not cleaned. When dismantling the formwork, 50 yuan will be fined every time the formwork material falls. After tearing up, if you don't clean up and tidy up the articles in time, you will be fined 100 yuan each time, and you will be fined 100 yuan for throwing things at high altitude.

17. During concrete pouring, the warehouse keeper will be fined 100 yuan for each inspection that fails to reach the designated position.

18. If someone is not assigned to maintain the concrete after construction, it will be fined 100 yuan.

19. Whoever goes up and down the feeding tray without authorization will be fined 100 yuan each time.

20. If the completed work is not carefully self-checked, and the next working procedure cannot be constructed on schedule after acceptance, a fine of 500- 1000 yuan will be imposed.

2 1. The monitor of each class should actively participate in the inspection, acceptance and regular meeting organized by the project department, and shall not ask for leave. 200 yuan will be fined for not attending, and the penalty for being late will be 100 yuan.