First, control the form removal time after concrete pouring. Generally, it is not a beam structure with large volume and large span. In the current weather, the formwork will be removed after 24 hours, and the formwork will be removed after 72 hours for mass concrete.
Second, it is forbidden to use old templates and replace them with new ones. It is recommended to use 8mm- 15mm bamboo veneer. If you use an old template, you can repair the damaged part of the template.
3. Before the next use of the template, the concrete residue on the template has been removed and cleaned, and a layer of release agent (generally with new engine oil) is applied before each use of the template.
Four, to have the initial setting and no form removal of concrete curing in time.