Current location - Health Preservation Learning Network - Fitness coach - Safe operation procedures for gantry crane operators?
Safe operation procedures for gantry crane operators?
What is the safe operation procedure for gantry crane operators? Please read the article edited by Zhong Da Consulting Company.

(1) After assembly, it shall be accepted, and no-load and overload tests shall be conducted.

(two) operated and managed by a special person. Before starting, check whether the steel wire rope, ground anchor and cable wind rope are in good condition, and can only be used after no-load operation is qualified.

(3) it is forbidden to carry people. When the safety device is reliable, the unloader can work in the hanging basket.

(4) It is forbidden to climb the frame and cross under it.

(5) Set up a sensitive and reliable contact signal device, so that each operation layer can contact the driver.

(6) Cable wind rope shall not be removed at will.

(7) Maintenance equipment must stop running.

(8) The deformation of frame body and track must be corrected in time.

(9) It is forbidden to overload.

(10) When the driver leaves, he should put down the hanging basket and cut off the power supply. :

(1) After assembly, it shall be accepted, and no-load and overload tests shall be conducted.

(two) operated and managed by a special person. Before starting, check whether the steel wire rope, ground anchor and cable wind rope are in good condition, and can only be used after no-load operation is qualified.

(3) it is forbidden to carry people. When the safety device is reliable, the unloader can work in the hanging basket.

(4) It is forbidden to climb the frame and cross under it.

(5) Set up a sensitive and reliable contact signal device, so that each operation layer can contact the driver.

(6) Cable wind rope shall not be removed at will.

(7) Maintenance equipment must stop running.

(8) The deformation of frame body and track must be corrected in time.

(9) It is forbidden to overload.

(10) When the driver leaves, he should put down the hanging basket and cut off the power supply.

The above are collected and sorted by Zhong Da Consulting Company.

For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd