1, hand crank installation
The installation height of hand crank is generally 1.2m. Measure the height of1.2m on the wall with a tape measure and mark it. Then put the crank in the pre-installed position and mark the punching position on the wall with a marker. Next, drill a hole at the marked position with an electric drill. Then aim the crank at the mounting hole, and then insert the fixing screw to tighten it.
2. Install the corner device
The corner device is generally installed on the ceiling near the corner 5 cm above the hand crank. Place the corner device in the pre-installed position and mark the drilling position. Next, drill holes with an electric drill, put away the corner devices and tighten them with screws.
3. Install the top seat
Clothes racks generally have four top seats. First, the installation position of the top seats should be determined. Generally, the distance between the top seat and the wall is not less than 27 cm, and the two top seats should keep a vertical distance of 45-50 cm and a horizontal distance of 1.8-2m .. You can measure and mark the installation position of the top seat with a tape measure.
Put the top seat in the pre-assembly position, mark the drilling position with a pen, and then drill the hole with an electric drill. Finally, screw the top seat to the ceiling.
Step 4 install the clothesline
First, fold the clothesline in half, pass the clothesline through the handle, then pull it up through the corner device, and then pass the clothesline through the top seat. One end of the clothesline is placed vertically downward, while the other end extends backward, passes through the horizontal top seat, and then is placed vertically downward. The other clothesline should be installed in the same way.
5, install the boom
Use scissors to cut the ends of four vertical wire ropes flat, then pass the wire ropes through the ring and tie a knot to fix them. After installing the four rings, fix the two suspenders on the rings and cover the pipe sleeves.