g = mg = 20k g× 10N/kg = 200n;
(2) Speed of counterweight movement:
v = ST = 0.4 m2s = 0.2m/s;
(3) Total work done by tension:
W total =Fs=250N×0.4m= 100J,
Pull to do useful work:
W has =Gh=200N×0.4m=80J,
Mechanical efficiency of tensioner;
η=W, where w totals ×100% = 80100×100% = 80%.
Answer: (1) The gravity of the pulled counterweight is 200 N;
(2) The speed of the counterweight in 2S is 0.2m/s;
(3) The mechanical efficiency of the tensioner in this process is 80%.