On June 28th, in Daxing Biomedical Base, citizens exercised on the ski simulator in the "Comprehensive Sports Center" which was transformed from a waste steel structure factory building. Beijing News reporter Pu Fengshe
Daxing vacated land 1 13 hectares, and the biomedical base alone vacated about 4 10000 square meters of usable workshops.
No.32 Yongda Road, Daxing Biomedical Base, which used to be a steel factory building, has now been transformed into a "sports park" of 10,000 square meters, offering basketball, trampoline, archery, rock climbing and other sports.
Up to now, Daxing District has demolished illegal buildings 1 1834000 square meters, verified and written off 700,000 square meters, and vacated land 1 13 hectares. Only Daxing Biomedical Base has withdrawn from the available workshop by about 4 1 000 square meters, which is equivalent to increasing the construction land by 400 mu.
The abandoned steel structure factory was transformed into a sports center.
Beijing (real estate) closed the steel structure factory at the beginning of the year to relieve the function of non-capital. Although the perennial welding and grinding operations have mottled the factory building, this old factory building with a height of more than 10 meter and a square meter has become a treasure and has been transformed into a multi-sports "comprehensive sports center".
Walking into the sports center, you can see the face of the steel structure factory in the past. Inside the sports center, the biomedical base enterprise league on the basketball court is in full swing, with five-a-side standard football field, domino room, archery field, bubble football, rock climbing and ski resort, and all kinds of sports have their own space.
The transformation of the old factory has to start with the planning of Daxing biomedical base. On the one hand, through the way of "changing cages for birds", the old enterprises that do not meet the industrial direction of the park will be retired in time to realize land reuse; On the other hand, through the way of "building a nest to attract phoenix", high-growth small and medium-sized enterprises will be introduced into standard factories and incubators for production or incubation.
It is understood that the biomedical base has introduced the sports industry of "mass sports and national fitness". The target group of this "sports center" is also the surrounding residents, as well as employees of schools, enterprises and institutions, and the consumption pricing is also very close to the people.
The stinking ditch "transformed" into a wetland green corridor
The reporter learned from the Daxing District Government that as of June 25th, five tasks in Daxing District, such as occupation of roads, unlicensed operation, demolition of logistics center, renovation of ordinary basement in underground space, and land reclamation of "leaving blank and increasing green", have all been completed. Among them, the "blank space and greening" project completed landscaping 3. 12 hectares. As a highlight of this year's work, all polluting enterprises along the Yongxing River have been shut down, and the original messy "spillway" has become the Yongxing River Wetland Park with a total area of 550,000 square meters, adding a wetland green corridor to the south of Beijing. "At the beginning of the renovation, there was a pool of smelly water in the river, and whoever walked over should cover his nose. Needless to say, the river is overgrown with weeds, and the smell is worse in summer, not to mention mosquitoes. Who will come here? " The staff of the biomedical base management Committee told the reporter, where did the smelly water come from? It is the pollution discharge of enterprises along the Yongxing River that leads to a sharp decline in water quality, and finally forms a smelly river that everyone can't avoid. After planning, design and construction, Yongxing River Park (new town section) has created a green corridor along the river by using the topography of wetlands. Yongxing River Wetland Park (Xincheng Section) is 4 kilometers long, connecting Niantan Reservoir in the north, Wei Yong Road in the south, Tianhua Street in the west and Tianshui Street in the east. The construction area of the project is about 550,000 square meters, of which the river area is 6.5438+0.5 million square meters, and the green area is 400,000 square meters, including the biological environment such as river beach, urban orchard, undergrowth garden, bubble wetland and fruit forest.