The renovation of old residential areas is an important guarantee for effectively improving residents' living conditions and quality of life. Since 2020, Jiguan District of Jixi City has solidly promoted the renovation of old residential areas as an important task. In 2020, five old residential quarters and 78 residential buildings, including Sijie, Huayuan, Guang Yuan, Jixi Primary School and No.3 and No.4 Brewery, will be renovated, with an area of * * * 490,900 square meters, involving 6,445 households. On September 14 and 10/4, the renovation works of the main building and infrastructure were carried out respectively. The renovation contents include: building external wall insulation and painting, roof color steel tile maintenance, platform waterproofing, unit entrance awning maintenance, corridor painting and maintenance, unit door and window replacement, corridor lamp installation; In terms of infrastructure, asphalt concrete pavement, sidewalks, parking lots, drainage pipes, greening, courtyard street lamps, etc. According to statistics, after the renovation, 407 parking spaces were added, with a green area of 9,429 square meters, fitness equipment 108 sets, 30 pavilions, 349 sets of leisure seats, and hardened roads and sidewalks of 6,6801square meter, which greatly improved the beauty, comfort and happiness index of the living environment. At present, local modification and finishing work are being carried out according to the rationalization suggestions put forward by residents on the transformation content. 202 1, 10 residential quarters and 76 residential buildings were rebuilt, covering an area of 538,700 square meters, involving 69 18 households. The total investment of the project is 654.38+0.5 billion yuan. On the basis of last year's experience, we carefully studied the old reform of Jiamusi, and redesigned and upgraded the modeling color of the building facade, the landscaping of the community, the leisure facilities and the color matching of the road pavement. In mid-June, the main body began to enter the site, and 38% of the engineering quantity has been completed. It is estimated that the building renovation task will be completed by the end of September, and the foundation renovation task will be completed by the end of 10.