Monthly project work summary 1

Since April, the on-site production work of our project department has been on the right track. After two performanc

Monthly project work summary 8 articles.

Monthly project work summary 1

Since April, the on-site production work of our project department has been on the right track. After two performanc

Monthly project work summary 8 articles.

Monthly project work summary 1

Since April, the on-site production work of our project department has been on the right track. After two performance inspections and the preparation and improvement of indoor and outdoor work, the project is progressing smoothly. The specific situation is now reported as follows:

I. Overview and progress of the project

The construction of the station, laboratory and mixing station of our project department has been basically completed, the service road has been fully opened, and the station, laboratory and mixing station have been fully put into work. On April 25th, the project officially started, and the pile foundation of k3+225 Bridge and the sample culvert of k3+050 started. By the end of April, the earthwork excavation and basement treatment of pile foundation excavation and sample culvert engineering have been carried out.

By the end of April, the project was progressing smoothly. In the interior industry, on the basis of the work completed in March, the comprehensive office of the project department was mainly responsible for the re-inspection of 4. 12, various reception work, logistics work and assisting all departments to carry out their work smoothly in April. The laboratory completed the geotechnical test and aggregate test; The planning contract department signed six subcontracts for the construction team, including two culvert contracts, two protection contracts and two bridge contracts. The Safety, Quality and Environmental Protection Department shall prepare the commencement application scheme, construction organization design scheme, safety management system and scheme of each construction team; The finance department mainly deals with guarantees and prepayments. At the site, in late April, the prototype works of k3+225 Bridge pile foundation and k3+050 culvert were started one after another, and the excavation of pile foundation and culvert began.

Second, the construction progress and next month's plan

In April, six construction teams have entered the site, k3+225 Bridge Pile Foundation Construction Team and k3+050 Slab Culvert Construction Team have started construction, and the other four construction teams have been stationed to stand by and stand by.

In May, it is planned that two subgrade teams will carry out subgrade filling, subgrade excavation, dredging and basement replacement; Two protective teams carry out protective construction; Three pile foundation teams are responsible for bridges, bridges and bridge piles; Two culvert teams are responsible for culvert construction; Under the two bridges, a team will enter the site to prepare for construction.

Three. Surveying and engineering settlement

1. Draft and assist the project manager to sign six labor import agreements;

2, list the accounts submitted to the leadership for review, and prepare the final accounts submitted to the supervision room;

3. Prepare and report the application for commencement advance payment;

4. Prepare and report the first-stage measurement and payment report;

5. Prepare the internal construction plan and tasks of the project department in May, and issue them to professional workers after approval by the leaders;

6, prepare the project department internal output statistics, submitted to the finance department.

7. The Project Department has compiled the Measures for Measurement and Payment of Construction Team, and submitted it to the leader for review where it needs to be modified and refined;

8. Prepare and report the k32+050 channel base processing change application report. Actively cooperate with the work of various departments and successfully complete the departmental work plan in April.

Four. Financing and use of funds

Handle daily accounting vouchers and settle accounts with some suppliers. Due to the project funds, some suppliers are still unsettled. They have gone through the formalities of opening temporary accounts for the project, prepared the advance payment in place, went to the owner's unit to apply for funds, and made a fund application plan according to the requirements of the owner's unit. The amount of advance payment received at the end of the month is RMB. Among them, the owner should keep the advance payment tax (3.4 1%), the wage guarantee for migrant workers (2%) and the insurance fee (40/00) in the account, and the actual available funds are only about xx thousand, of which the cooperative unit requires the transfer of 1.65 million (management fee, guarantee fee, etc.). ), and the company's actual activity funds are only about xx thousand. Due to the strict monitoring of the owner's unit funds, it is now available. The project department has withdrawn 400,000 yuan from the account as the project reserve fund, but due to the lack of convergence, the project cost has not been accounted for separately. In the next month's work, we will do a good job of cost accounting with the help and assistance of various departments.

Verb (abbreviation for verb) material setting

1. After repeated negotiations with Datang Company, the delivery agreement of Shuangfeng Conch was initially reached and the contract was formally signed;

2. After inquiring by many manufacturers and reporting to the project department and the company's material design department, determine the sound tube manufacturer and negotiate with the manufacturer to reach a purchase and sale intention agreement;

3. The mixing station will start feeding at the end of the month, with concrete production capacity;

4, cooperate with the work of special personnel;

5, complete other matters assigned by the leadership.

Coordination of intransitive verbs

1, the temporary land use work is carried out normally and orderly;

2. The blasting scheme has been determined and an oral agreement has been reached;

3. Successfully demolish a house;

4, timely mediation of minor contradictions and disputes;

5. Three-pole dismantling is in progress;

6. Complete the tasks assigned by the leaders in time.

Seven. Safety and environmental protection

1, internal division of labor

In late April, the internal division of quality inspection and security inspection tasks was carried out. Subdivide the work into individuals and cooperate with each other.

2. Quality inspection

(1) The quality inspection process and data archiving system have been established, and the normal inspection application approval has started. (2)k3+050 channel foundation pit acceptance, basement treatment acceptance and quality inspection data have been completed. The inclined retaining wall of k35+282 .5-K35+475 section has passed the acceptance inspection, and the quality inspection data has been sorted out. (3) Defects:

(1) further strengthen their own quality, strengthen business learning, and adapt to the needs of work. ② The communication between departments needs to be further strengthened.

(3) To further improve the collection, arrangement and construction quality inspection procedures of quality certification materials. Timely sort out and report the quality inspection data for signature and recognition.

3. Safety and environmental protection

(1) The safety facilities of the started projects are basically in place, and the safety technical disclosure is completed.

(2) The bridge pile foundation construction team has carried out three-level safety education.

(3) Nine safety files are being established and improved.

(4) Seven special construction safety technical schemes have been completed.

(5) Defects:

(1) Workers pay little attention to safety education and training for new workers, and take an indifferent attitude.

(2) Some construction workers did not pay enough attention to and understand the on-site safety construction, and many times found barefoot workers who did not wear safety helmets. Solution: Take photos and collect evidence for those who violate the safety system and regulations, implement safety reward and punishment measures, and standardize safety operation.

③ We should further strengthen the safety education for workers, so that workers can further realize the importance of safety.

(4) Level-3 safety education and training, the safety officer should communicate with the construction team in time, and the safety work should be done well.

(5) The safety inspection records shall be sorted out in time and an account shall be established.

4. At present, the safety, quality and environmental protection department has been operating normally, and the quality inspection and security inspection procedures are being further improved.

Eight. Comprehensive management

In April, the comprehensive office mainly completed the following work:

1. Transform the living quarters of the project department to improve the quality of life of employees;

2. Assist the safety, quality and environmental protection departments to make various signs and signs;

3. Assist in handling 4. 12 compliance government inspection and do a good job in publicity;

4. Collect and keep office documents and do a good job in file management;

5, flexible mobilization of vehicles, to ensure that the site car.

Nine. Problems to be solved

The second bridge construction team is scheduled to enter the site in the middle and late of this month, and the company is also requested to make clear the construction team in time; In addition, the earthwork team has been working on the site for nearly four months, and the construction contract has been delayed, which has seriously affected the production and daily work of the project, and the project work is at a loss. Please make a decision as soon as possible.

Because the project department has three vehicles for lease, it is urgent to solve the related problems of vehicle lease in the project department. The relevant situation report has been submitted, but there has been no reply so far. I hope the company leaders will pay attention to it.

Monthly project work summary 2

With everyone's efforts and hard work, the project proposal has been submitted smoothly. Although there are still many shortcomings, it is still relatively successful on the whole. In this project, I am the project manager. Responsible for coordinating the relationship between all parties, responsible for the overall planning of the project, and fully mobilizing the enthusiasm and creativity of personnel in various departments. Managers assign, review and evaluate tasks and approve projects.

Review and summary: our group takes the overall intention of the case arranged by the teacher as the axis, takes the interests of the tourism bureau as the premise, and combines the local human and geographical conditions to develop the tourism project around Chaohu Lake. After a period of joint efforts, our group has accumulated some management experience in the management of this project.

As the person in charge of this project, I divide the work according to the personality characteristics and hobbies of each team member. A usually has a flexible mind and many ideas, and often comes up with good ideas. Moreover, the thinking is clear, and a good tourism project that conforms to the local people's feelings and customs will be produced according to the requirements of the project. So she is the director of the development and construction department. B usually likes painting and literature, and often makes publicity columns. He can have good ideas and ideas on promoting this piece, and he is quick-thinking and likes to innovate. Therefore, I am the Minister of Propaganda Department in this project, responsible for coordinating, guiding and organizing the external publicity, business training and production of this project. Guide and coordinate local media to carry out publicity and reporting, and be responsible for approving and managing journalists' reporting activities in the Development Zone. C is a serious student at ordinary times, with strong adaptability, and can handle accounting timely, appropriately and appropriately according to specific conditions. Therefore, I am the director of the finance department in this project, responsible for ensuring the project capital demand and ensuring that the construction funds are earmarked. Effectively control and manage all economic activities in the process of project construction. D is usually very enthusiastic and likes to care about everyone's life trivia. And a strong sense of responsibility, not afraid of trouble, patience and meticulous, good service attitude. Therefore, I am the director of the comprehensive management department in this project, responsible for the administration and logistics management of the project office (including vehicle management and environmental sanitation, staff dormitory and canteen).

Management and maintenance of hydropower system, etc. ), responsible for the comprehensive management of social security of the project.

As the person in charge of this project, I pay attention to the overall project plan, and at the same time I don't relax the implementation of the progress of each team member. Fully mobilize the enthusiasm and creativity of personnel in various departments. We often hold meetings to discuss the implementation of project details and the production of overall ppt. Divide tasks and strengthen responsibility to people. Arrange the project schedule reasonably. Take the initiative to contact the teacher in time, meet at any time to modify the plan, and achieve the most satisfactory state. The members of this group also worked very hard, communicating with other members in time while constantly improving their own parts, and finally completed the plan of this project together.

Monthly project work summary 3

After receiving the Notice of China Railway on Launching the National "Quality Month" for 20 Years (China Railway Safety Supervision {20 _} No.91), Luoyang Xihan Interchange Project attached great importance to it, and immediately held a special meeting. Taking this event as an opportunity, it organized the team members of the project department and the main management personnel of the department to carry out special quality inspection activities in depth in combination with the current main construction sites, and achieved

1, unify thoughts and publicize widely.

Make use of the time of early naming to convey and learn from all the staff of the project department, refine the responsibility area, and require all responsible personnel to report the problems found to WeChat group every day, rectify them in time, and close them within a time limit. Quality banners were posted in several important positions on the construction site, which played a wide publicity role, made the quality consciousness deeply rooted in the hearts of the majority of construction workers and created a good quality management atmosphere.

2, in-depth implementation, timely implementation.

Led by the Engineering Department of the Project Department, every Sunday morning, in conjunction with the deputy site manager, the safety department, the mechanical department, the laboratory and other major management personnel, the site inspection and investigation work will be carried out, and the quality problems and hidden dangers existing in the site construction will be sent to WeChat group in the form of problem notification, and the case will be closed in time according to the principle of "five decisions".

3. Highlight key points and take the initiative to attack

For scaffolding, deep foundation pit frame bridge operation, continuous beam construction, steel processing site and other important construction sites, the project manager will lead the team, team members and department heads will participate in the in-depth investigation and management of hidden dangers. At the weekly meeting, the progress of quality problem rectification was reported, which played a positive role.

4, strict disclosure, control the finished product

Before the construction of the important parts of the bridge on site, organize personnel to conduct re-inspection and re-inspection in time to control the quality hidden danger within the minimum impact range. Before pouring, explain the control points to the field workers in time, and ask the field workers to strictly follow the construction plan and technical disclosure, and actively grasp the quality control of finished products.

5. Answer questions, entertain and educate.

Organize project personnel to answer 25 questions on the website of quality monthly report in time.

6, exchange experience, * * * has improved.

During the Quality Month, we spontaneously organized and participated in the mutual inspection activities of four sections along the Xihan Interchange in Luoyang, and invited the Municipal Housing and Construction Bureau and supervision units to participate, which achieved good results. Realize the promotion by observation, the steps by communication, and improve the level of project quality control.

7. Seriously sum up and raise awareness.

Quality work has a long way to go. The project department adheres to the problem orientation, accumulates management experience, strengthens management key points, improves personnel's quality awareness, and stresses quality control from the source, thus contributing to building the first-class image of China Railway.

Monthly project work summary 4

According to the spirit of the relevant documents of the Ministry of Construction (Jian Jian [20-]2 17) and the Provincial Department of Construction (Min Jian [20-]37 and Nan Jian [20-]5 1), our bureau has done a good job.

First, leaders attach importance to it and have clear responsibilities.

In order to highlight the key points and effectively carry out this activity, our bureau set up a leading group for the "Quality Month" activity, formulated a concise and clear implementation plan for the activity, and at the same time publicized and mobilized at the regular meeting on quality and safety, unified thinking and raised awareness to ensure that the "Quality Month" activity achieved the expected results.

Second, create an atmosphere and publicize it widely.

10 year10.8, at the regular meeting of quality and safety, organize all responsible parties to study the relevant documents of "Quality Month" activities seriously, and carefully understand its spirit and content, requiring all construction enterprises to formulate specific activity plans, and supervising enterprises to supervise their concrete implementation. * * * More than 200 basic publicity materials on engineering quality were distributed, more than 65,438 banners were hung and more than 0/00 posters were posted, mainly involving the slogan of "Quality Month" and knowledge of engineering quality and safety. , which has created a "quality month" atmosphere and received good publicity results.

Third, crack down on the storm.

This "Quality Month" activity is carried out in combination with the specific situation of our city and the supervision of the special rectification of the quality and safety of construction projects. First, actively carry out on-site special inspection of self-mixed concrete and prohibit the use of clay bricks; The second is to publicize and implement the spirit of the notice forwarded by Nanping South Supervision [20-]4 1. From April 1 20-, the use of manual digging piles is strictly restricted. At this point, the project is basically under control, and the pile length is also limited to15m, 20-. Third, according to the contents of special rectification and supervision of quality and safety, we organized special inspections of construction quality and temporary electricity consumption, and issued 20 rectification notices of hidden dangers, including 4 rectification notices of shutdown, and put forward 84 rectification opinions. Now the basic rectification is in place, and the rectification rate is 96%.

Although the "Quality Month" activity has ended, we should take the "Quality Month" as an opportunity to carry out the activities of creating excellence in depth and work hard to promote the engineering quality of our city to a new level.

Monthly project work summary 5

A, the project progress:

Civil engineering:

First, the heating boiler foundation is ready.

B, the office building decoration model room has been completed.

C The light steel and heavy steel in the main workshop and boiler room have all entered the site and been assembled.

Installation:

A, boiler room flue damper all installed.

B, boiler drainage pipe, sampling pipe and exhaust pipe completed 95%.

C, the production and installation of reinforcing ribs outside the flue is 2 tons.

D flue assembly completed 10 ton.

E, to Wuwei safety quality supervision department for boiler equipment inspection (preliminary completion).

Second, the site safety civilization management:

Civil engineering: due to the weather, the concrete, mortar and wall ash of civil engineering have stopped. In order to resume work smoothly next year, all the construction wastes in the working areas will be cleaned up.

Installation: arrange the articles in the site work area to prepare for the steel structure construction and site dumping of the West Third Line next year.

Third, the project quality:

Check the steel structure materials in strict accordance with the specifications and design requirements, so that the installation quality and welding meet the design and specification requirements.

Four, in materials and equipment:

A, the owner's workshop comes into play and is installed, and has gone to the safety and quality supervision department for inspection.

B. entry materials:

Flue material: steel plate 15. 134 tons; Flue support material: 16.3 tons.

Verb (abbreviation of verb) land expropriation:

Complete temporary land requisition for external drainage project and sign land requisition compensation agreement; Complete the permanent land acquisition of the clear water pool of the water diversion project.

Monthly project work summary 6

After the busy and intense work tasks in May, the work in June will soon come to an end. I will summarize some work of the engineering department as follows:

I. Overview of Project Implementation in June

This month's production task list * * * has 9 projects, including BYD Guangxi Cultural Festival, BYD Haikou Exhibition, BYD Xiamen Exhibition, Kia Project Rectification, Evergrande Real Estate, CITIC, Desai Electronics and Universiade, and 18 sets of exhibits. Among them, Evergrande Real Estate in charge of Rao Jieping, CITIC Project in charge of Luo Xiaohong, Guangxi Cultural Festival in charge of Ceng Liping and BYD Xiamen Exhibition in charge of Shu Pingbo have been completed, and the rest projects will be completed around the end of the month as planned. While completing the "quantity", we also strive to ensure the "quality".

Second, the factory operation overview

1. Production task completion

Of the nine projects completed this month, the rectification of Guangxi Cultural Festival, Evergrande Real Estate, CITIC and Kia projects has been completed on time, and the rest have been done by special personnel. Now the overall progress is well grasped, and the production of exhibits can be effectively completed within the mission period as planned.

2. Plan first, then execute, emphasize methods and seek efficiency.

Starting from this month, we will vigorously implement the planning system, improve the workflow and ensure the effect. In the process of issuing order documents, the progress plan is also delivered to the project leader, and the progress plan is written before the task begins, so as to control the whole project and implement the content of the project production progress plan without formalism. Before loading, the person in charge of the project should also fill in the bill of materials for the exhibition, load all the exhibition numbers and check them in detail. It is also necessary to conduct pre-exhibition training, discuss and study the details of the exhibition with everyone, and clarify the exhibition tasks of the exhibition staff. After the exhibition, the person in charge of the project is required to summarize the existing problems and lessons, and summarize and evaluate the project.

In terms of employee motivation, the excellent employee selection mechanism was initially implemented this month, and its detailed standards have also been posted. The number of employees is tentatively set as a management mode with three employees. In the welfare system, it is scheduled to add meals once a week and five fruits on Wednesday; In terms of corporate culture, the initial focus is to establish the factory's own culture by shaping the habits of employees. In terms of the arrangement of employees' after-work activities, it is planned to build an employee lounge, play company promotional films, movies, TV dramas and other programs, and set up newspapers and periodicals to read. In view of the age of the factory employees, the employee sports activities are planned in the form of tug-of-war competition. If circumstances permit, the above activities will be implemented next month, and the specific details need to be improved.

3. KIA project rectification, pay close attention to quality and details.

In this month's task list, leaders at all levels attach great importance to the improvement of KIA's exhibition furniture, and our factory has also invested a lot of manpower and material resources in the improvement of this project. The painting, wrapping, production, construction, material selection and other issues of exhibition furniture in the last auto show have also been solved in this rectification. At the same time, through the problems exposed by this Kia project, the future work will focus on improving the details and quality of the exhibition and strengthening the concept of time and discipline.

Third, factory management defects and solutions

Insufficient:

1. The specifications emphasized by the factory are not binding and need to be strengthened. (Exhibitors wear shorts, which causes serious scratches on their legs. )

2. The handover between the executive department and the factory is unclear, the two sides lack communication in advance, and the person in charge and the person in charge are unclear. The timeliness of task time, content and preparation documents is seriously lagging behind, which leads to contradictions and seriously interferes with production.

3. The team leaders have poor communication awareness, poor task priorities, unorganized work and weak management and control ability of team members.

4. The behavior requirements of factory personnel should be carried out in strict accordance with the process of the factory. If there is a problem, report it to the superior, and avoid overstepping. Find the relevant person in charge to solve the problem according to the nature of the problem.

5. Employees have poor sense of community and collective.

6. The lack of consciousness and methods of managers has no obvious effect.

7. Managers' inaction. The concrete manifestations are: the work is arranged by the superior, the existing problems are not exposed, the work lacks initiative, the sense of responsibility is not strong, and it is better to do more than less. Many problems are often easy to solve when they first appear, but managers ignore them and make them worse. This kind of middle management is actually in a passive and irresponsible state, which is a cancer of the factory and must be removed and eliminated. Every manager must conscientiously perform his duties, and the implementation is guaranteed by the system, otherwise the supervisor will be punished. Suggestion:

(1) needs to be adjusted.

Idea: The current management is not dedicated to giving orders, but to forge ahead with employees and achieve goals.

Mentality: personal gain and loss, don't pay too much attention to the responsibility at first, don't feel that you are very capable, improve yourself first. This is a matter of public opinion. Over time, personal emotions will naturally improve, and it is only a matter of time before the approval of superiors.

Skills: Employees must be proficient in their own work. When they encounter problems, they should explore first. If they can't overcome it, they should consult experienced people, take more records and think about why, because employees will inevitably encounter such problems in the future and will ask you to deal with them first.

Experience: if you don't know the problem, you won't prevent it. At ordinary times, you should remember all aspects of the problem and use it for me. Don't let them happen again. In production, you should preach, explain and remind employees in a targeted manner, so as to take precautions in advance.

② Need to be strengthened.

The requirements are clear: the matters promoted by superiors and the operating norms should be understood and familiar, and managers should take pains to explain and assess them, especially the employees with weak ability.

Training: the most effective and direct, the actual cases in the homework are often told to employees, shown to employees, and then he will show them to you.

Employee problem: think more from the employee's standpoint, explain the truth and facts clearly, blame less and care more.

Management: Plan, arrange and coordinate reasonably to make the production line smooth and create a tense and harmonious atmosphere.

(3) Need to be clear

Factory logo: the number of exhibition tools is clear to prevent mistakes in use; The production area and stacking area should be clearly marked. Factory system: perfect system, clear rewards and punishments, laws to follow, normal production, not for employees to explore. Management should seek the most reasonable and effective methods, or learn from others' methods and absorb their essence. Factory environment: It is absolutely impossible to produce good products in a dirty working environment. Strictly implement the 5s regulations of factory production to ensure the effect.

Summary: The system is strong, the plan is clear and definite, the control is in place, the implementation is carried out on time and in quantity, and the pursuit of quality, efficiency and discipline is established! All efforts are only for the smooth progress of production!

Monthly project work summary 7

During the work in February, 65438, Huangdao Project Department carried out various theories and skills training and assessment by combining theory with practice. With the careful organization of the leaders of the project department and the careful cooperation and implementation of professionals, the training work has achieved certain results.

I. Safety training

(a) to participate in the organization of the project department, responsible for the assessment of qualified rate100%; I participated in the monthly safety examinations organized by the project department's Ansheng Department, such as "Management Specification for the Use of Work Tickets and Operation Tickets of China Datang Corporation", "Management Measures for the Handover System, Patrol Inspection System, Regular Equipment Rotation and Trial Production Industry", and the qualified rate was 100%.

(2) Actively participate in the "Youth Cup" safety knowledge competition organized by the Education and Training Center. The project department sent four teams and won the first place 1, the second place 2 and the third place 1 respectively.

Second, skills training.

(1) According to the actual work needs of Huangdao Project Department and the current human resource allocation, the project department is prepared to train the crane drivers and crane commanders who are in short supply. At present, the registration work has been completed, and the training and evidence collection work is expected to be completed in June+10, 5438. Timely meet the needs of the project department for operators of special types of work. In addition, with the cooperation of the teaching and training center, the project department actively organizes various professionals to conduct welding training. At present, the training has been conducted twice, and the welding skills of the trainees have been improved to a certain extent. In the future, it is necessary to strengthen the professional training of various majors to further improve the operation skills of new welding employees.

(2) Participate in Siemens plc system training organized by Huangdao Power Generation Company. The project department will send four related professionals to participate in the one-week training, and publicize the training summary of the participants on oa, so that all the staff of the project department can learn and improve together.

(3) In order to meet the needs of work and improve work efficiency, the project department organized various professionals to carry out training on management and control integration, so as to make them more familiar with the operation method of the new system, and transformed it into a Concise Operation Manual on Management and Control Integration of Power Plants for practical reference.

(d) According to the professional training requirements of June+February, 5438, which was formulated in 20__ _ _, professional personnel were trained in production, and new college students were trained daily, so as to improve their production skills through technical lectures, technical questions and answers, and on-site torture.

Generally speaking, the project department has made some achievements in the training work from June 5 to February. All personnel in the project department have basically achieved the expected effect of monthly training.

Monthly project work summary 8

(a) vigorously grasp the work of science and technology projects. Seize the great opportunity of the provincial science and technology department to help the poor and actively strive for financial support from higher authorities. This year, * * * was supported by 14 national and provincial projects, with 6.75 million funds in place; Approved 4 municipal science and technology projects with a funding of 2 million; Declare the first batch of provincial science and technology projects in 20-2002, and 1 1 was selected as an alternative project library; At the same time, strictly implement the "eight prohibitions" of science and technology project management, strengthen the supervision of science and technology project implementation, and ensure the standardized and safe use of funds.

(2) Accelerate the transformation of scientific and technological achievements. First, increase the transformation of scientific and technological achievements. In the year of 20-20 10, 2 1 items of scientific and technological achievements such as "industrialization demonstration of new vegetable varieties with special characteristics and supporting organic cultivation techniques" will be transformed, and the output value of scientific and technological achievements will be 250 million yuan. The second is to identify scientific and technological achievements. Establish a scientific and technological achievements appraisal team, and complete the appraisal and evaluation of scientific and technological achievements in our county 1 1 in 20-20/0; Declare the Municipal Science and Technology Progress Award and be awarded the first prize; Organize and recommend 3 scientific and technological achievements to declare provincial-level scientific and technological progress awards; The technology transfer transaction volume reached 7 million yuan. Third, vigorously develop provincial-level scientific and technological innovative enterprises. This year, the newly recognized motorcycles were declared as national high-tech enterprises (2 high-tech enterprises in the county were realized); Newly identified three provincial-level innovation and cultivation enterprises (big agriculture, motorcycles, machinery). This year, the output value of high-tech products such as environmental protection building materials, new motorcycle technology, biological medicine and fertilizer exceeded 500 million yuan. The fourth is to strengthen the docking of scientific and technological needs. Carry out enterprise technology demand collection activities, do a good job in industrial technology innovation alliance and enterprise Industry-University-Research cooperation, and promote the Industry-University-Research alliance of 15 enterprises and 10 universities and research institutes. Organize enterprises to participate in the 4th Western High-tech Industry and Financial Capital Docking Promotion Conference and the 2nd China International Science and Technology Expo.

(3) Strengthen the protection of intellectual property rights. The first is to carry out publicity and training. Organize two large-scale intellectual property trainings throughout the year, and invite the Provincial Institute of Science and Technology Information and the Patent Office to hold trainings on innovative methods and intellectual property protection, and key enterprises such as motorcycles 17 to participate in the trainings; Organize the company to participate in the second China (Shanghai) International Technology Import and Export Fair, and display and promote new environmental protection building materials products. The second is to increase patent applications. We carried out the enterprise patent "clearing" activity, completed 65 patent applications (including invention patent applications 10) and authorized 37 patents. The third is to do a good job in patent application funding. I applied for 25 provincial and municipal patent applications and got a patent grant of 5 1 1,000 yuan.

(four) the establishment of urban and rural science and technology information platform. First, vigorously implement the "Science and Technology Double Network Action". Establish scientific and technological information service websites (web pages) in "New Home" residential areas, leading enterprises, park bases and township communities. Completed the construction of 66 websites (webpages) in 43 townships, 12 communities, 9 villages, 1 industrial parks and 1 sub-district offices. The second is to strengthen the construction of service system. Focus on building R&D platforms for companies, companies, companies, chicken research institutes and tea research institutes, and have built five technical service centers for advantageous industries such as pigs, broilers, vegetables and tea; Carry out "comprehensive quality training for backbone farmers in new countryside" for 3 times, with 2 16 trainees. The third is to increase the propaganda of popular science. On March 20th, the departments of culture, health and justice in Lianhe County successfully held the 19th "Spring of Science and Technology" popular science activity month in Shuanglu County. * * * More than 20,000 popular science materials were distributed, 23 wall charts were posted, and more than 300 people consulted/kloc-0; 165438+ 10 participated in the activities of the county commission for discipline inspection 13 to send clean government culture to the countryside in the middle and late October, benefiting 26,000 people; Organize 47 scientific and technological personnel in our county to participate in the "scholar" science and technology training class, the science and technology innovation policy presentation training class, and the science and technology enterprise innovation ability improvement training class in batches.