Implementation Engineer's Year-end Summary Part II

Time flies, time flies, 20xx years have passed inadvertently. Looking back on 2006, there are both the sureness and joy of harvest and the regret and guilt brought by lack. 20xx is a year of great development for the company, and the market for dynamic testing machines is good, so the work of developing four parts is arduous and arduous. Under the guidance of lathe workers and woolen workers, I have better integrated into this tense and rigorous atmosphere, successfully completed various tasks, greatly improved my professional quality and working ability, and have more confidence in my work. In the past year, I participated in more product design and benefited a lot from it. Not only have I learned a lot of professional knowledge, but also have a more comprehensive understanding and grasp of dynamic products, and cultivated my basic qualities as a mechanical engineer. At the same time, I insisted on self-study, learned new tools, software and professional books in the current mechanical industry, and improved my theoretical level. The specific work is summarized as follows:

I. Work Achievements in 20xx Years (in chronological order)

1. Design and debug motorcycle testing machines exported to India.

The trip to India was successful, difficult and unforgettable. The three of us, without an interpreter, overcame the difficulties of local hot weather and unsuitable diet, and completed the debugging of four equipments in less than three weeks, and got the acceptance summary from users, which is worthy of recognition. However, I feel a little sorry. Because it is the first time to export vehicle products, the lack of experience, poor anti-rust packaging and broken equipment have reduced the satisfaction of Indians with us. If we pay attention to these details and use our products to open the door to India, a country whose industry has just started, then I believe we will benefit from it.

2. Supervision design PWS-J20B 1

This testing machine has been delivered for inspection, and all indicators have reached the requirements of the technical agreement. It will be delivered when the user's money arrives.

3. Participate in the design of PWS-200B

Together with the wool worker, I have a deeper understanding of the working principle of hydraulic chuck and gas-liquid booster pump, and I have learned a lot from the wool worker. For example, the rigor and seriousness of the design, this product has been shipped.

4. Participate in the design of PWS-250C.

Co-designed with woolen workers, has passed the user's pre-acceptance.

5. As the technical project leader, design NW-DYB200.

This project is a new product, completely new design, short design time and great difficulty, which is a severe test for me. Zuo Gong is very strict with me. Looking for information about MTS and other products for my reference gave me great autonomy. After hard work, I finally finished the design task. At present, the mechanical part of the product has been installed, waiting for the controller to debug. 6. Participate in the design of QPNS-200H7 and QPSB-200.

These two products are also new products with complicated structures. At first, I was appointed as the project leader. But in the process of design, I obviously felt my lack of ability. In addition, during the critical period of the project, there was an emergency at home. I asked for leave for nearly three weeks, which delayed the design time. I am deeply sorry and grateful to Zuo Gong for taking on a lot of work that should have been done by me. These two million products are a good exercise for me, which makes me realize my own shortcomings. At the same time, I also want to thank Zuo Gong for teaching me a lot, because these two products have matured a lot.

7. Participated in the design of PNW-B5000.

I participated in the design of this product under the guidance of the lathe operator. At present, the drawings have been designed, waiting for the user to review the drawings before drawing. I feel very lucky. I have worked with lathe workers, wool workers and shell workers to design products. They are all dynamic authoritative figures with high professional quality and good personality. They let me have a more comprehensive understanding of dynamic products in a short time.

8. Participated in the design of PNW-6000

At present, it is in the tense drawing design stage.

9. I visited the driving axle test-bed with the wool worker. The drive axle test-bed is still blank in our company. I followed Mao Gong to Beijing and Jinan Heavy Duty Truck for investigation and got a lot of information. At present, Mao Gongzheng is talking about technical problems with customers.

10. Develop technical solutions and provide technical support for the sales department.

Second, the academic performance of 20xx years

In 20xx years, I focused on studying ANSYS, COSMOS, PRE and other software, bought books and studied SOLIDWORKS deeply, mastered new tools of mechanical design, broadened design ideas and improved design ability. In 2005, I only had a preliminary understanding of finite element analysis. In 2006, I taught myself COSMOS finite element analysis software. After many exercises and comparing with the finite element analysis of professionals, I finally mastered this finite element analysis tool. Now, I am full of confidence in finite element analysis. In addition, I have made a leap in finite element analysis software. I thought about learning ANSYS, a more professional and widely used finite element analysis software, but I haven't studied it well because of its difficulty. After all, this is an elective course for masters or even doctors. Later, Teacher Deng asked me to study ANSYS and train technicians. With this as the driving force, after more than a month of hard training, I have basically mastered ANSYS, and now I can use it for simple finite element analysis, which is a leap for myself. At the same time, I also taught myself three-dimensional software such as PROE. Although SOLIDWORKS is enough in the current work, PROE is the authoritative software on machinery after all, so I studied it. The purpose of learning is to apply. In the future work, I will seriously consider making full use of the new technology I have learned to make the design better. For example, use three-dimensional software to make renderings, do motion simulation, do finite element analysis and so on.

Third, the improvement of work style in 20xx.

? Sharpen a sword for three years, and now I'll show you? After more than three years of work, I have completed the complete transformation from school to society, abandoned those unrealistic ideas and devoted myself to my work. With the increasing reaction to work, I began to think about how to make new achievements in my work in order to realize my own value. I have always been very active and don't want to fall behind. I keep telling myself: I must do everything well and go all out. Through these years of fear, I deeply realize that carefulness and preciseness are the qualities that designers should possess, and proficiency, similarity and innovation are the key factors to determine whether designers are mediocre or excellent. I want to broaden my design ideas more and more, I want to enjoy design, and I want to make a difference in the mechanical field. Going all out to do things, rigorous and meticulous work attitude, should be the biggest gain in my work style in 2006.

Fourth, what is not done enough?

Looking back on the past year, I also left some regrets, which I need to take as a warning. For example, lack of courage to take responsibility independently. I like to find someone else to solve problems, but I can't make decisive decisions. When Zuo Gong was ill, the whole project fell on my shoulders. At first, I felt that the task was too heavy and I had no confidence in myself. Later, I took over and solved one problem after another, only to find that things were not as complicated as I thought, and I lacked the courage to take responsibility independently. Also, my language skills need to be strengthened. Maybe it's because of my personality. I don't like talking about it I just like working hard. Now it seems that this is not enough. I need to face customers and communicate with others.

20xx has left in a hurry, and a hopeful new year is coming to us. The road is long in Xiu Yuan, and the way to find it is long in Xiu Yuan. The grand goal of the company in 2007 has been placed in front of us. I will be energetic, pioneering and enterprising, make a good work plan, and make unremitting efforts for the development of the company and the realization of personal values.

Implementation Engineer's Year-end Summary Part III

I stayed in the company for nearly half a year. With the strong leadership and care support of the company leaders, I made great progress on 20 15. In the course of my work, I successfully completed the annual work target of 20xx. 20 15 personal work is summarized as follows:

I. Annual Work:

1, familiar with the rules and regulations of the company.

Joined in September, 20 15. In order to better integrate into the company team and lay a good foundation for future work, I stepped up my understanding of the company's rules and regulations and became familiar with the company's corporate culture. Through understanding and familiarity, I am proud to join the company's team, but I also feel my own pressure. In the future work, I will take the company's rules and regulations as the criterion, be strict with myself, be honest and self-disciplined, dare to innovate while adhering to the principle, and complete the task faster and better.

2. Be familiar with the structure and site conditions of the project.

As a civil engineer, being familiar with and understanding the site is quite beneficial to the future work. In order to better carry out the work in the future, I went to the scene many times to get a deeper understanding of the layout of the scene. After mastering the first-hand field data, I consulted the relevant technical data, studied the structure of the project, analyzed the difficulties and difficulties in the future construction, and analyzed the basic forms of the project. Through research and analysis, the actual situation of project construction management is objectively predicted, which provides a reliable basis for the next step of planning.

3. Participate in the modification of the management system of the engineering department.

In order to facilitate the management of the engineering department in the future, I combined the requirements of the company and the actual situation of the engineering department, and referred to the relevant systems of well-known real estate enterprises such as ABO, and compiled and revised various rules and regulations of the engineering management of the engineering department. The establishment of this system is conducive to clarifying the responsibilities of each post and providing guarantee for project management. Through this compilation, I have a further understanding of other majors in project development, and it also makes my next work clearer.

4. Analyze the weather at 20 15.

In order to complete the company's 20xx project development task and make scientific and practical work content and project construction progress plan of the engineering department in 20xx, I analyzed the weather situation in 20 15, and combined with the perennial weather situation in Wuzhi County, predicted the weather in 20xx. At the same time, I combine the weather conditions and the progress of the project, make reasonable adjustments to the progress of the project, grasp the construction season, and avoid a large rainy season.

Second, the existing shortcomings and improvement measures

20 15 is coming to blowing in the wind. Looking back on my work in the company in the past six months, although the workload is relatively large, there are not many highlights, and many jobs are still unsatisfactory. To sum up, the shortcomings mainly include the following points:

1, lack of communication, unable to make full use of resources.

In the process of work, because I am not familiar with other majors, and because of my face, I don't take the initiative to ask other colleagues, which leads to reduced work efficiency or even mistakes, and I can't make full use of superior resources. As the saying goes? A threesome must have my teacher? In the future work, I will actively strengthen communication with colleagues in other departments, realize resource sharing through the company's platform, and improve my business level.

2. Lack of planning

In the process of work, especially in the construction stage of project development, due to the lack of planning, the purpose of work is not clear enough, and the contradiction between primary and secondary is unclear, which often achieves twice the result with half the effort. The leader is dissatisfied or full of grievances. In the future work process, I will make a work plan carefully, strengthen my understanding of the purpose, distinguish between primary and secondary contradictions, and strive to get twice the result with half the effort.

3. The major is narrow.

As a modern talent, he should be versatile, so that talents can meet the needs of the times and the company. My professional field is narrow, and I don't know enough about other real estate majors, especially marketing planning and laws and regulations, which limit my own development. In the future work process, I will strengthen the study of other majors, make full use of the company's resources, improve subjective initiative, and strive to become a multi-functional and compound talent.

Three. Measures and suggestions for completing the 20 15 target plan

For the smooth development of the company's projects and the company's sustainable development, I put forward the following suggestions on project management.

1, contract management

Contract plays an important role in project management. Without it, project management is impossible, and contract is the basis of project management.

Familiar with the contract. And conduct in-depth and detailed research on the contract, and be aware of key terms, loopholes, possible changes and disputes.

Establish a strong sense of contract. Before the contract is signed, the status of the owner and the contractor is equal. On the one hand, the project manager does not bully others and forces the contractor to accept the conditions outside the contract; On the other hand, we should also be alert to the traps laid by contractors in the process of project implementation. When the contractor puts forward various suggestions, the first thing he thinks of is to abide by the contract and fully estimate the possible economic problems caused by adopting the suggestions.

2. Quality management

In the project implementation stage, the engineering department should carry out various tasks to control and supervise the project quality. Generally speaking, there are several aspects such as reviewing and confirming the contractor's quality assurance system, controlling the quality of materials and equipment entering the site, reviewing the supervision planning and implementation rules, and supervising and inspecting the daily supervision work of supervision engineers.

Review and confirm the contractor's quality assurance system. Focus on checking whether the contractor has established a quality assurance system, whether the quality assurance system has been certified by a certification unit, whether a clear quality goal and plan have been formulated, and whether the quality assurance system is effective.

Quality control of engineering materials. Check whether the contractor has formulated a material inspection and inspection system according to the provisions of the design drawings and the requirements of the contract, and strictly control the quality of material procurement and ordering, material entry and material use in practical work.

Review the detailed rules for the implementation of supervision planning and supervision work. The owner's wishes should be realized through the supervision engineer. The quality of supervision work is directly related to the quality of supervision planning and implementation details.

Often go to the site to understand the situation, and at the same time supervise and inspect the daily supervision work of the supervision engineer. Special emphasis is placed on the investigation and study of the existing construction site.

3, schedule control

Schedule control is one of the key factors for project success. What the engineering department should do is to prepare the project management plan, study the overall progress, construction layout, main construction technologies and construction problems of the project, and make plans for possible problems in the project implementation process. Formulate a system, standardize management and improve work efficiency.

4. Strengthen the management consciousness of all employees.

Many people mistakenly think that project development is only the business of the engineering department and the sales department, and has little to do with their own departments. In fact, project development is quite complicated. It combines the wisdom and sweat of various departments, and it is not as simple as development and sales. Therefore, as employees of the company, we should firmly establish the consciousness of full-time management and devote ourselves to the work with the spirit of being masters.

20 15 has passed. Although the project has not been officially completed, it has gained a lot. In particular, the solid work style and serious and responsible attitude of several leaders of the company set an example for our employees. Summarizing the past and looking forward to the future, 20 15 is also a challenge for me. In the new environment, new opportunities and new challenges, how to build this project with high quality, high efficiency, low consumption, safety and civilization on schedule is a subject that civil engineers should think about. In the future work, as the vanguard of project development, I will conscientiously implement the relevant regulations of the company, give full play to my subjective initiative, restrain myself with iron discipline, constantly learn new technologies and experiences, and be good at summing up. I also hope that the company leaders can give me more understanding and support, and strive to contribute to the development of the project.

The fourth chapter of the year-end summary of the implementation engineer

I have been working for many years. According to the actual situation of my work, I analyzed and evaluated my work, summed up the experience and lessons, and put forward improvement methods, so as to foster strengths and avoid weaknesses in future work, and provide a basis for continuously improving working methods and improving work efficiency. My work is summarized as follows:

As a technician, my job orientation is to assist the technical director and constantly enrich myself. In participating in the construction project, while completing the survey and setting out of the project construction, I also assisted the technical director in compiling the construction scheme and technical disclosure, and was responsible for the guidance and compilation of the engineering technical data, conducted on-site quality inspection with the builder, and assisted the safety officer in implementing, supervising and inspecting the safety work on the construction site.

In the process of engineering construction, I have always taken my work seriously with a positive attitude, and I can do my duty in all the work in order to complete the task successfully. ? Don't rush to make achievements and bury yourself in your work? It is my work motto, reminding myself not to aim too high, to be down-to-earth, to do more practical things, to test my knowledge in practice and to accumulate experience in the construction site.

The work on the construction site made me deeply understand that what I learned in school, what I learned by rote through norms and procedures, is far from being solid with actual experience. A lot of knowledge can't be learned in books, and it is entirely based on my own experience. I have been reading and studying more since I started to work. If you encounter something different from the practice in the book, please consult the technical director and foreman modestly in time. Although sometimes I can't get a theoretical explanation, it's a good experience. When I first started working, I felt that the technical data work, measurement work and quality inspection work were relatively simple, but I actually learned a lot and always felt that I could. It is only when you actually operate that you find your own shortcomings, often with half the effort and lack of efficiency. Now that we have more practical operations, mastered methods and gained experience, we will be handy. For example, in measurement, it is important to do its key work well. Personally, the key work in measurement is to choose the best measurement scheme and carry out retest to avoid human error.

In addition, taking the technical disclosure work as an example, it is not simply to write the disclosure, but to give it to the labor construction team for signature to complete the work. However, after the written disclosure is completed, the workers need to be tracked and inspected in the actual construction process. If it is found that the workers have not carried out the construction according to the technical disclosure or not completely, they should be patiently explained and guided to make the partial projects in place, avoid rework, and ensure the construction progress and project quality.

In engineering construction, safety is the main link that cannot be ignored. Based on the practical experience in the construction site in the past year, this paper briefly talks about safety issues. The most important thing is to establish a sense of security. First of all, the managers of the project department must have a strong sense of safety and responsibility. Only when the managers of the project department truly realize the importance of safety can they do this job well. If the management of the project department is lucky enough to do this work, it will be a fatal hidden danger for the safe construction of the project. Therefore, the project manager must understand the safety work from the bottom of his heart and put it into practice. For the labor service team, the first thing to do is to arrange a safety education and training after the workers enter the site, and at the same time make safety technical disclosure to the labor service construction team.

These tasks will not be implemented until they are done. The management personnel of the project department should always check the safety work on the construction site, and strive to completely eliminate potential safety hazards in the bud. In terms of safety, special attention should be paid to the support of the frame and the safety facilities carried or worn by the workers themselves. Regularly supervise and check that workers must wear safety facilities before they are allowed to work on the construction site. In the process of erection of scaffolding, strict inspection must be carried out, and the construction team is required to set up facilities in strict accordance with the construction specifications or procedures to ensure that there are no potential safety hazards. Only after the acceptance of relevant departments can the next working procedure be carried out.

Years of engineering construction work have made my professional knowledge grow and deepen, and my work ability, including organization and coordination ability, management ability and contingency ability, has been greatly improved, and more importantly, I have accumulated valuable work experience. The achievements over the years have also been recognized by the leaders and colleagues of the project department.

In short, in my future work, I will meet new challenges with a hundred times enthusiasm, make progress and maturity in my study, constantly spur myself, enrich my energy, improve my quality and professional level, so as to adapt to the development of the times and enterprises and make progress and growth together with the company. Contribute to the development of the company.