Jinhua-Yiwu-Dongyang urban rail transit project consists of Jinhua-Yiwu section and Yiwu-Dongyang section. Two lines change at Tangqin Station in Yiwu, and two islands and four lines are on the same platform. At the same time, Jinhua-Yiwu-Dongyang runs through. The total length of the line is 107. 17km, and there are 3/kloc-0 stations, including 65448 underground stations.
The section from Jinhua to Yiwu starts from Jinhua Railway Station, passes through Erqi area in the north of the Yangtze River, the core area in the south of the Yangtze River, Jindong District, Jinhua South Station and Jinyi New District to Tang Qin, the main city of Yiwu. The terminal of the line is reserved for the condition of extending to Suxi in the near future. The section from Yiwu to Dongyang starts from high-speed railway station, Yiwu, and passes through the main city of Yiwu, Tang Qin, International Trade City, Dongyang, Tang Huai and Heather Street to Hengdian Passenger Transport Center. The starting point of the line is reserved to extend northward to Pujiang in the near future.