1. How much does the whole renovation cost?
1. Looking for a different decoration company for a house may have a price difference of 40,000-50,000 yuan, but this huge price difference is mostly caused by the choice of decoration materials. 100 square meter house can be reduced to 50,000-60,000 yuan if it is decorated with very low-end materials, but if it is decorated with slightly better decoration materials, the decoration price may be 100 square meter. Mainly depends on the owner's choice and judgment ability, whether it is low-end or long-term use or short-term use.
2, floor tiles, simple house decoration price square meters around 95 yuan, comprehensive cost: {including skirting, 600*600 ordinary precision glazed tiles, if you want to choose some well-known brands, I am afraid it will be more expensive. The auxiliary materials are 325.5 ordinary cement, white cement, medium sand, 108 glue and jointing agent. Because of the broken tiles, the floor tile area should be increased by 3%-8%.
3, simple house decoration price wall foundation treatment. Calculated by 3 yuan per square meter, the reasons for this part of the cost are: compensation for the wall after wiring, treatment of the cracks in the wall, elastic putty between the insulation layers, repair of the door opening of the building, and integral hanging cloth with special needs, with dacron as good as silk mesh cloth. If your basic level is quite good, this part of the money can be saved.
Second, the decoration package matters needing attention
1. If the owner doesn't know much about the decoration, it's best to find a local decoration company for design planning and customization. If you think the price is expensive, you can also find a designer to help you design and find a construction team to decorate yourself, so the cost will be much lower.
2. The decoration grade depends not only on whether the materials are high-grade or whether the construction is exquisite, but also on whether the decoration effect is appropriate. If it is high-end decoration, flat design and blind use of high-grade building materials, it will not achieve the expected results. You can use some unique design ideas and decorate with some high-grade materials, so the cost will not be too high and the decoration effect will be relatively high.
3. After the hydropower transformation, it is very important to waterproof the bricklayer before the construction. During construction, special attention should be paid to the uniform application of waterproof coating, and the thickness of waterproof layer should be consistent. Generally, the construction should be repeated 2-3 times. There are also clear requirements for waterproof height. For example, the height of shower area is generally 180 cm, and the height of wall is about 30 cm.
4. In principle, if the high-voltage electric pipe provided by the developer is PVC pipe, PVC pipe should be used in the secondary hydropower transformation, and JDG pipe (tightly sheathed galvanized steel pipe) cannot be used, otherwise it will be difficult to realize the overall grounding connection, leaving future troubles. If the high-voltage electron tube provided by the original developer is JDG tube, both can be used.
Now all-inclusive decoration is very popular, but the decoration budget is relatively large, so how much is the all-inclusive decoration and what are the precautions for decoration? Everyone knows after reading the introduction of the above small series.