Current location - Health Preservation Learning Network - Health preserving recipes - When does cement concrete curing start?
When does cement concrete curing start?
Generally, the sooner the better, as long as the erosion of concrete surface by curing water can be avoided. Generally, it can be carried out after initial setting.

But now even after the final setting, it is not convenient to maintain because there is no mold removal. Only the exposed surface is covered with moisture, and the whole maintenance shall be carried out after formwork removal.