Simple maintenance contract sample 1
Party A:
Party B:
The rural highway pavement maintenance project in Maojiagang Town follows the principles of equality, voluntariness, fairness, honesty and trustworthiness. Through public bidding, Party A will evaluate Party B's construction capacity, performance and facilities.
Credit audit, in line with the conditions of rural highway maintenance and construction. Party A contracted the pavement maintenance project to Party B for construction, and both parties reached an agreement through consultation to conclude this contract.
First, the number of projects
Location:.
Second, the project content
1, project contracting scope: pavement maintenance (pavement structure is cement concrete pavement), residual
Missing parts, seam cleaning and seam filling.
2, all the manpower, material resources, machinery and everything needed in the construction directly or indirectly.
Party B shall be responsible for all facilities.
Third, the way of contracting.
1, the project is contracted at the unit price, the project measurement is subject to supervision and inspection, and the scope is signed.
Calculated by the actual completed engineering quantity.
2. The project contracting unit price includes tax, and the tax shall be paid by Party B to the relevant tax authorities.
3. The project price is the unit price determined by the tender multiplied by the actually completed cement concrete pavement.
Calculation of engineering quantity. Pavement joint cleaning and filling shall be calculated according to the length.
Four. Obligations and responsibilities of Party A
1. Party A is responsible for setting out before construction and supervising Party B's construction throughout.
2. Coordinate the work related to the maintenance and construction of rural roads.
3. For the construction unit that fails to perform the contract, Party A has the right to terminate the contract.
4. Pay the project payment to Party B as agreed.
Verb (abbreviation of verb) Obligations and responsibilities of Party B.
1. Obey Party A's construction management and construct in strict accordance with Party A's lofting standards.
2. Fixed professional and technical personnel are responsible for site construction, management and safety construction. In case of safety accident, all responsibilities shall be borne by Party B. ..
3. Carefully organize and manage the construction machinery to ensure the quality and progress of the project.
4. Implement and complete all construction operations and defect repair in this contract project.
Six, quality requirements
Strictly follow the construction procedures to ensure that the pavement maintained within two years shall not be damaged.
Seven. Start and completion of the project
The project was completed on _ _ _ _ _ _.
Eight, the project payment settlement method
This project is contracted at the unit price. The contract unit price is cement concrete, pavement surface layer yuan/square meter, joint clearing and joint filling yuan/meter. Later, after the project starts, Party A will pay 30% of the project advance payment in advance. After the project is completely completed, Party A shall pay all the project funds after the relevant technical personnel of Party A jointly check and accept with the supervisors and meet the quality requirements of this project.
Nine. This contract is made in triplicate, one for each party and one for file.
Party A (seal): Party B (seal):
Representative (signature): Representative (signature):
Date, year and month
Simple maintenance contract sample 2
Party A (Employer):
Party B (contractor):
In accordance with the Contract Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, and following the principles of equality, voluntariness, fairness and good faith, both parties enter into this Contract through consultation.
I. Name and location of the project
Project name:
Project location: province, county (city) and township (town)
Coverage: Line name (starting point, ending point, mileage)
Second, the project content and cost
1, repair damaged asphalt pavement
The area of damaged asphalt pavement is square meters, and the unit price is RMB, and the total cost of repairing damaged asphalt pavement is RMB.
2, shoulder reconstruction
The unit price of the shoulder reconstruction meter is RMB, and the total cost of the shoulder reconstruction is RMB.
3. Slope treatment
Slope renovation meter, unit price, total slope renovation cost.
Step 4 draw milestones
Painting milestone square meters (blocks), the unit price is RMB, and the total cost of painting milestone is RMB.
5, production and installation milestones
Production and installation milestone block, unit price RMB, total production and installation milestone cost RMB.
6, paint the bridge guardrail
The unit price for painting one meter (or square meter) of bridge guardrail is RMB, and the total cost for painting bridge guardrail is RMB.
7, paint marks
Painting signboard block (square meter), the unit price is RMB, and the total cost of painting signboard is RMB.
8, sign production and installation
Make installation mark blocks (sets), the unit price is RMB, and the total cost of making installation marks is RMB.
The total cost of the above projects is RMB (in words).
Third, the quality requirements
1, the damaged pavement must be cut off with a cutting machine, and joint oil must be poured on the edge of the pit before oil filling.
2. When repairing the oil surface, transport the excavated asphalt surface waste to Li Highway for remote treatment.
3. This section is an important tourist (economic, cultural) route, so Pei Shoulder should be carefully constructed and beautiful. According to the natural conditions of the local route, the shoulder should be stepped. Specific requirements: shoulder width 0.5m, slope 1.5, horizontal distance between upper and lower steps 0.2m. ..
4. The installation milestone should be stable, and the handwriting on the surface of the tablet should be clear and legible.
5, everywhere signs should be unified, accurate handwriting, reach the standard of grade four highway.
6, bridge guardrail paint to do not easy to erosion, not easy to peel off.
7, asphalt mixture must use coarse sand and 0.5 ㎝-2 ㎝ granular stone.
8. If only the oil level is damaged, deal with the oil level. If the road is boiled, it needs to be replaced. The new pavement is smooth with the original road, and the joints are tight. The compaction thickness of oil pavement is not less than 3.5 cm.
9, frozen subgrade treatment, compaction degree should reach more than 95%.
10, raw materials entering the site must have inspection certificates, and asphalt adopts road asphalt 100#, with inspection certificates of three technical indicators of asphalt.
1 1, 8- 10 ton smooth roller is used to repair oil pavement.
12. Matters not covered in this contract shall be implemented according to highway specifications.
Four. mode of payment
After the World Heritage Declaration Office of the state, autonomous region (province), prefecture (state) and county (city) has passed the acceptance, the project funds will be allocated after the declared funds are in place.
Verb (abbreviation of verb) construction period
The project started on August 8, 2000 and was completed on August 22, 2000.
Settlement method of intransitive verbs
After the completion of the project, the settlement shall be made according to the actual quantities and the contract unit price.
Seven. Obligations of both parties
1. Party B:
(1) in strict accordance with
Close the construction technical specifications to ensure the engineering quality.
(2) Attention should be paid to civilized construction and construction safety during construction. All casualties in the construction shall be borne by Party B. ..
(3) After the completion of the project, if the shoulder (slope) is damaged due to rain, flood and other reasons, Party B must repair it free of charge before the Grand Canyon declares World Heritage.
2. Party A:
(1), responsible for coordinating local affairs, such as water, electricity and transportation expenses, which shall be borne by Party B, and coordinating to ensure the smooth progress of the project.
(2) Party A shall supervise the whole construction process of Party B.. If Party B's construction quality is found to be unqualified, Party A may order Party B to stop work for rectification, and the rework expenses shall be borne by Party B..
(3) Party A shall pay the project payment in full and on time as agreed in the contract.
Eight. responsibility for breach of contract
Party B:
(1) If Party B has quality problems in the construction process or stops work or rework due to poor management, all losses shall be borne by Party B. ..
(2) If the construction quality cannot be guaranteed due to irresistible natural factors (such as rain and strong wind), the construction period will be postponed.
Party A:
After the application for inheritance payment is in place, Party A shall not default or refuse to pay the project payment without reason.
Nine, quality supervision and completion acceptance
(1) The (Transportation Bureau) will send technicians (road administrators and rural highway maintenance managers) to supervise and manage the project quality during the construction period.
(2) After the completion of the project, Party A shall pay the quality deposit after it is accepted by the relevant departments of the World Heritage Application.
Ten, this contract shall come into force from the date of signing, and shall be terminated after the project is completed and accepted.
XI。 This contract is made in quadruplicate, with Party A and Party B holding two copies respectively.
Party A (seal):
Representative of Party A (signature):
Date of signature: August 8, 2000 Party B (seal): Representative of Party B (signature):
Simple Maintenance Contract Sample 3
Party A: _ _ Town People's Government
Party B: _ _ Town _ _ Village
In order to maintain the main road into the village, the following measures should be taken.
1. Maintenance section: Binglang village, village committee, to cement road, state-owned farm, about10km.
Second, the maintenance standard:
1, the damaged section shall be paved with rubble first, and then compacted with sand and gravel.
2, uneven pavement and sand filling and compaction.
Three. Maintenance period: the construction period is 20__, from August 12, 2002 to August 30, 20 12.
Four. Project cost: This project is contracted by Party B, and the total project cost is 50,000 yuan.
Verb (abbreviation of verb) Acceptance: After the maintenance project is completed, Party A and Party B shall organize relevant personnel to accept the maintenance project.
6. Payment method: The maintenance project shall be funded by Party B, and Party A shall pay the project payment to Party B in one lump sum within 3 days after the project experience is received.
Seven. Rights and responsibilities
1. Party B shall send at least one excavator and one bulldozer to the site for construction every day, and the working hours shall be at least 10 hour every day, so as to ensure that the maintenance tasks are completed on time with good quality and quantity.
3. Party B must pave subgrade and pavement with flaky and river stone soil according to the contract requirements, and compact them. If the construction is not carried out as required, Party A has the right to refuse to accept and pay the project funds.
4. Party A has the responsibility to cooperate with Party B to coordinate the contradictions in the construction process.
5. After the acceptance of the maintenance project, Party A must pay the project payment in one lump sum within 30 days, and recover 500 yuan one day after the deadline.
6. In case of irresistible natural disasters that cause extensive damage to the maintenance highway again, both parties may renegotiate the terms of the maintenance contract.
Eight. This contract is made in duplicate, one for each party.
Party A:
Party B:
Date, year and month
Simple Maintenance Contract Sample 4
Employer: People's Government (hereinafter referred to as Party A)
Contractor: Luo Zhigang (hereinafter referred to as Party B)
In accordance with the Contract Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, and following the principles of equality, voluntariness, fairness, honesty and credibility, both parties reached an agreement on matters related to the road maintenance project of new rural construction in our village, and entered into this contract as follows.
I. Overview of the Project
1, project name: Jinping Road Excavation Project in Mayang Village.
2. Project Location: Jinping Road, Mayang Village
3. Project content: earthwork excavation, road leveling and walnut tree transplantation.
Second, the contract period
1. Commencement date: August 20, 20__
2. Completion date: September 20, 2006, 5438+09.
3. Contract term: 30 calendar days.
Three. General rights and obligations of Party A and Party B:
1. Party A is solely responsible for the coordination and quality supervision in the project construction.
2. Party B is solely responsible for the construction organization, quality supervision and maintenance of this project.
3. Party A's obligations:
(1) Provide Party B with the construction site and related materials, be responsible for the coordination during the construction, and review the construction technical scheme and construction progress plan;
(2) Responsible for the control and inspection of engineering quality.
4. Rights and obligations of Party B:
(1) Party B shall be responsible for the construction in strict accordance with the contract requirements and relevant technical specifications, and ensure the quality and progress.
(2) Party B shall be inspected by Party A's management at any time, and those that do not meet the quality standards shall be returned in time.
Work, expenses and construction period shall be borne by Party B. ..
(3) Party B shall abide by the management regulations on production safety in engineering construction and organize the construction in strict accordance with safety standards.
Work, and at any time to accept the supervision and inspection of the industry safety inspectors in accordance with the law, take necessary safety protection measures to eliminate hidden dangers of accidents. The responsibility for accidents caused by Party B's ineffective safety measures and the expenses arising therefrom shall be borne by Party B. ..
IV. Contract amount, payment principle, payment method and liability for breach of contract
1, project contract amount: 1 (including tax)
Rmb: 7,800 yuan
Say: seven thousand eight hundred yuan only.
2. Payment of project funds: after the final accounts of the project are accepted, the settlement will be made according to the actual engineering quantity, and all the project funds will be paid.
3. Liability for breach of contract: If one party breaches the contract, it shall pay a penalty of 50% of the total contract amount.
Verb (abbreviation of verb) This agreement shall come into effect as of the date of signing. This agreement is made in duplicate, one for each party.
Party A (signature): Party B (signature):
Date of conclusion of the contract: 20 _ _ _ _ _ _ _
Simple maintenance contract sample 5
Party A:
Party B:
Through friendly negotiation between Party A and Party B, Party B will undertake the renovation of Party A's Yuping Zixiaoshan Farmers' Market on the principle of fairness and justice. Specific matters are as follows:
1. Construction content: Use the equipment project designated by Party A for construction.
Second, the farmer's market construction equipment:
1, stainless steel electric rolling shutter equipment (manual 1, electric 3);
2. Glass partition equipment (the material is 12mm tempered glass, and the woodworking board includes imitation porcelain and stainless steel battens, etc. );
3. Porcelain imitation equipment for ceiling, wall and column;
4, lamps and lanterns use energy-saving lighting;
5, stainless steel electric door special line (4mm2 jade disc brand steel core);
6. The power cord is calculated by the square of the ground (4mm2 white lead core);
7, brick glass footstool; 8. The cylinder of joinery board water pipe includes porcelain-like material;
9. Replace the damaged sewer equipment;
10, cleaning sewer equipment.
Three. Mode of undertaking: Party B shall adopt the form of contracting for labor and materials. If Party B encounters any change in Party A's contents during the construction, both parties shall settle it through negotiation.
4. Equipment cost: three hundred and sixty-one thousand eight hundred yuan only (RMB only).
Verb (verb's abbreviation) quality assurance: Party B shall carry out the construction in strict accordance with the project agreed by Party A, ensuring the quality and quantity.
Intransitive verbs: commencement date: year month day, completion date: year month day.
Seven. Safety: Party B shall be responsible for the safety accidents during the construction.
Eight. Deposit: Party B shall pay a deposit of RMB 20,000 Yuan to Party A from the date of signing the contract and deliver it to Party A, and Party A shall return the deposit of RMB 20,000 Yuan to Party B within six months after the completion of equipment startup.
9. Payment method: Pay Party B the equipment payment according to the equipment progress, once every 10 day, with the first payment of100000 yuan on February 28th, 65438. After the equipment is completed, Party A shall pay Party B RMB 35 1, 800.00 Yuan only, and the rest shall be paid to Party B in one lump sum within 6 months without quality problems.
X. Liability for breach of contract: (the construction period is 40 days) If Party B fails to complete the project on time, it will be fined 1000 yuan for each day overdue and rewarded 1000 yuan for each day in advance. If Party A fails to pay for the equipment on time, Party A will take full responsibility for failing to complete the equipment on time.
XI。 Matters not covered herein shall be discussed separately by both parties. This contract is made in quadruplicate, with Party A and Party B holding two copies respectively. The above contents shall take effect as of the date of signature by both parties.
Party A: Signature:
Party B: signature: agent: ID number: bank of deposit: account number:
Agent:
ID number: Bank: Account number:
Year, month, year, month, year
Simple maintenance contract sample 5 related articles:
★ 5 simple personal maintenance contract templates
★ 7 simple model equipment maintenance contracts.
★ 5 simple maintenance contract format templates
★ Five General Templates for Maintenance Contract 2022
★ Five maintenance service contracts for model equipment.
★ 5 maintenance contracts for general-purpose vehicles
★ 5 copies of daily maintenance contract for individual house.
★ Five regular house maintenance contracts in 2022
★ Formal maintenance contract template
★ 5 templates for periodic maintenance contract.
The booting stage of rice refers to the period from ear differentiation to heading, which can be roughly divided into differentiation stage, formation stage an