How long will it take for lime stabilized soil to be paved with water?
The curing period of cement stabilized layer should not be less than 7 days. Maintenance period is less than 7 days, should be paved with asphalt surface, and restrict the passage of heavy vehicles. In layered construction of cement stabilized soil, after the lower layer of cement stabilized soil is rolled, the upper layer of cement stabilized soil can be paved in one day without 7-day curing period.