In the first half of 20xx, under the persistent leadership of the county party committee and the county government, and under the care and guidance of the Ministry of Agriculture and Industry of the municipal party committee, the construction of characteristic towns in our county was coordinated with the pilot construction of characteristic towns in our city. In the past six months, in accordance with the basic path of urban-rural integration, town-village linkage and unified planning, combined with urban-rural construction, park construction, industrial development and our own conditions, we have tried first, innovated and developed institutional mechanisms, optimized resource allocation and stimulated endogenous motivation. The construction of characteristic towns in our county in the first half of this year is summarized as follows:
First, the direction of development
Relying on their respective resource advantages, our county's characteristic towns are positioned as construction functions: Xishan Town is positioned as Xishan Taoist culture characteristic town, Nanji Township is positioned as Nanji Poyang Lake wetland ecological characteristic town based on Poyang Lake wetland ecological resources, Xixia Town is positioned as Xixia holiday and leisure characteristic town based on Xixia holiday and leisure resources, and Lehua Town is positioned as Lehua Airport Economic Zone characteristic town. Qiaoshe Town relies on the construction of micro-industrial park and logistics port to build a characteristic town of Qiaoshe Logistics Port, Datangping Township relies on government affairs culture to build a characteristic town of Datang Ping government affairs culture, Liuhu Township relies on the development of hot spring health tourism to build a hot spring health tourism town in Liu Hu, and William Town relies on farming culture to build an ecological characteristic town in Poyang.
Two. progress
(1) Xishan characteristic town is centered on Xishan Wanshou Palace. Three vertical and three horizontal? Based on the six main roads in the town, the construction of market towns will be carried out (vertical lines: Xizhen Line, Guandi Road and Expressway Exit, horizontal lines: 320 National Road, Wanshou Road and Huanshan Highway). Has National Highway 320 10 km been completed? Five transformations? Renovation, Huizhou-style building renovation on both sides of Guandi Road, antique archway construction at Guandi Road intersection, pavement upgrading and renovation of Guandi Road (including water supply pipeline, rain and sewage drainage pipeline, strong and weak current pipeline laying, road greening along the street, sidewalk slab installation, street lamp installation, greening, lighting and beautification, etc.). ).
(2) The construction of Nanji's characteristic hometown gives full play to the enthusiasm and initiative of township organizations, actively carries out the linkage between towns and villages, and conscientiously pays special attention to the implementation of various projects. First, we will further promote the project of improving water and toilets and greening and beautifying. 2 145 villagers in the township have tap water, 63 villagers in Baijia natural village have changed toilets, and the underground drainage pipe network in Baijia natural village has been completely transformed; 3,600 square meters of fishermen's leisure square will be built, and the greening of health centers and primary and secondary schools will be completed in an all-round way, with a greening area of 4,000 square meters. 145 Houses on both sides of the main streets of Baijia Demonstration Village, Wanjiatou Village and Chenjia Village? Beautify? The first phase of the project was basically completed. The second is to further promote the construction of water conservancy transportation facilities. Invested nearly 7.5 million yuan to upgrade the main street of Xiangyang Street and build the first landscape street in Nanji Township; 14km lakeside highway was completely repaired,1280m Jishan outer ring highway was hardened, Nanji Bridge and Wanjia Bridge were repaired. ; The bus line from Li Jiazhuang to Nanji Township in Nanchang 159 was opened. Now, we are trying to extend the bus line 159 to the newly-built county bus hub station and bypass Jishan on weekends. This passenger ship with 48 passengers has been put into use. This year, a small passenger ferry with a draft of 500 meters, a length of 15 meters and a depth of 90 meters will be built. Four fishermen's wharves, such as Wanjia, Shanxi, Xixie and Chenjia, were widened. The third is to further promote culture, education and health. The upgrading of the CATV network has been completely completed, with 35,000m of newly laid optical cables and more than 2 10 new users. The audio-visual teaching equipment in primary schools has been put into use, the renovation of dangerous buildings in teaching buildings has been completed, the construction of infrastructure such as playground, classroom and ground pouring has been fully completed, the central classroom and canteen have been repaired and reinforced, and the sports track and basketball court have been fully hardened and paved; A comprehensive medical technology building of township hospitals with an area of more than 3,000 square meters has been built.
(3) The total investment in the construction of characteristic towns in Xixia is 220.75 million yuan. At present, the investment has been about 5 1.68 million yuan, and the total project amount is 23.4%. Mainly around? One street, three games, two gates? Strive to build modern towns with characteristics. ? First street? Refers to Xixia Town's characteristic tourist street (the construction scope includes the upgrading of Xixia Avenue from Shi Gan Village to Mao Heng, and the upgrading of Qiaoxi Highway to Guaishiling; ? Three games? Refers to the north-south ecological parking lot and cultural square; ? Two doors? It refers to the south gate and north gate in the north-south direction on Xixia Avenue.
1. comprehensive upgrading and reconstruction project of qiaoxi highway (the total investment of the project is 46.68 million yuan, the completed investment is about 46.68 million yuan, and the total engineering quantity is 100%). Up to now, the comprehensive upgrading and renovation of houses, pavement slab laying and municipal pipe network construction have all been completed, and the completion acceptance is being organized.
2. Xixia Avenue upgrading and reconstruction project (with a total investment of 91150,000 yuan, including 38.87 million yuan for housing upgrading and reconstruction, 52.28 million yuan for municipal pipe network construction and 5 million yuan for municipal pipe network completion, accounting for 9% of the total municipal pipe network project), including two construction contents: one is Xixia Avenue and 276 houses in front of the town government. Second, Xixia Avenue 3. 15km municipal pipe network project, starting from Mao Heng in the north and reaching Shi Gan Village in the south; Up to now, more than 200 meters of sewage pipes and rainwater pipes 1.200 meters have been completed on the east and west sides of the commercial city section, and two glass fiber reinforced plastic sewage tanks in the north of Ganshiqiao have been laid, and the strong and weak electricity and water supply pipes are moving.
3. North and South Gate, North and South Ecological Parking Lot and Cultural Square (the total investment of the project is 82.92 million yuan, including 5 million yuan for North and South Gate, 506 1 10,000 yuan for North Ecological Parking Lot, 23 1 10,000 yuan for South Ecological Parking Lot and 0/10,000 yuan for Cultural Square); At present, land requisition, red line scope determination and design work are under way.
(4) Set up characteristic towns skillfully, expand urban framework and large-scale projects, and promote the construction of characteristic towns. Focus on building a passage, that is, beautifying and lighting the main streets of Qiligangji Town, planning and building two roads, that is, Kanqiao Avenue and Chuangye Avenue, building three resettlement sites, building Longgang Garden, consolidating and upgrading the central village of Zhufang Village, and building Airport Garden. Up to now, engineering designs such as house beautification, kerb installation, drainage ditch construction and market town lighting are under way. The construction planning of Kanqiao Avenue and Chuangye Avenue has been basically completed, the red line of land use has been put away, and the land acquisition work is about to begin; There are 97 houses in Zhu Fang Central Village Phase II. The house has been completely completed, painted inside and outside, the village road is hardened, the rain and sewage drainage ditch has been built, and water and electricity are under planning and construction. There are 78 households in 39 buildings in the third phase. Currently, there are 78 households in 39 buildings on the second floor and 52 households in 26 buildings on the third floor. There are 204 buildings planned for the first phase of Longgang Garden, of which 182 buildings have been built, with four floors capped and 22 buildings under construction. The power grid has been planned, water supply is being implemented, and rain and sewage drainage, roads and greening are about to be planned and constructed. Kong Lin Garden has a planned land area of more than 500 mu and more than 5,000 houses. At present, housing planning, land examination and approval, and forest land examination and approval have basically ended, and trees are being cut down.
(V) Lehua Characteristic Town According to the requirements of the construction planning of the airport economic zone and the improvement of the surrounding environment of Changbei Airport, and according to the functional orientation of the town's logistics and business town, the construction of characteristic town is progressing rapidly according to the requirements of superiors. At present, we will focus on promoting the construction of business service areas in airport towns and market towns. The total land area of jichang town Project is 599.67 mu, including 304.29 mu of agricultural land, 30.23 mu of unused land and 265.438+05 mu of construction land. It involves 302 households 1.542 people in Deng, Xiadeng and three natural villages in Dengxu village, and the demolition area of the main house is 1 10967+0 square meters. 20 14 has started demolition, with 33 households demolished in the first phase, with an area of15000m2; The county government has solved the land use index of 50 mu, and now it has gone through the formalities of converting agriculture into soil and is going through the formalities of land supply; Shanghai Greenland Construction Group has visited the project many times and is currently discussing specific cooperation matters with the county government. Market Town Commercial Service Area is located in the east of National Highway 105, west of Beijing-Kowloon Railway and north of Lehua New Street, covering an area of 264. 15 mu, including 200.87 mu of agricultural land, 0/3.07 mu of unused land and 50.22 mu of construction land. It involves the demolition and resettlement of 5/0/06 households/0/4 people in Lehua Village Street, with the main house demolition area of 48,000 square meters. Demolition began on 20/0/4 in Kloc, and 40 households were demolished in the first phase, with an area of/0/3000m2 in Kloc; The municipal government has solved the land use index of 137 mu, and has handled the land conversion from agriculture and is going through the land supply procedures; The county investment company has visited the project many times and is currently designing the project planning and construction plan.
(VI) Based on the humanistic history and farming culture, William Featured Town has planned and constructed the William Fertility Theme Park, which is located in the central area of the market town, the new old street section of the Fengchan River and its two sides, with a total area of 53,000 square meters and a total investment of 9.8 million yuan. Has it been built? One stream, two paths and three small bridges? (Park Water Stream, Waterfront Trail, Waterfront Trail, Doctor Bridge, Fengyun Bridge, Fengchan Bridge)? A stadium, three squares and four scenic spots? (Cultural Stage, Basketball Court, Gateball Court, Xianzhi Square, Leisure Square, Farming Square, Yuan Wen Yayuan, Folk Range Rover, Lotus Pond Moonlight, Lu 'an Tingquan) and so on. Are you online? Fengchan theme park? On the basis of successful renovation, in order to further enhance the cultural taste of William Street, beautify the environment and create an ecological town with local characteristics, 25.7 million yuan will be invested to further beautify the hatchback street view and street green space, and enhance the ornamental, entertaining and characteristic of the street. The main construction contents of the project include door and window renovation, pipeline burying, rain and sewage diversion, unified stores and signboards, and asphalt pavement renovation. Total street length 1. 1 km, involving houses 143 rooms. At present, the project has been approved by the county government executive meeting, and the county development and reform commission has initiated the project and reported it to the Ministry of Agriculture and Industry of the Municipal Party Committee. The project design was started on May 27th, and now the project design has entered the final stage.
(7) The construction of Datang Ping government cultural characteristic town and Liu Hu hot spring health tourism town is under planning and design.
Iii. Existing difficulties and the next step
The construction of these characteristic towns will set an example for our county to accelerate the process of urbanization and enhance its external image, and will become a pilot and demonstration area for the integrated development of urban and rural areas in our county, and also provide strong support for our city to build a core growth pole. Through the implementation of the construction of characteristic towns in the past two years, some achievements have been made, but there are also some problems and difficulties, which are as follows:
(A) the existing difficulties
First, the project construction investment is large and the capital turnover is difficult; Second, some projects have implemented a number of major key projects in towns and villages, and the work cannot be promoted; Third, it is difficult to implement the construction land index, which leads to the failure to carry out the project construction plan on time; Fourth, the preliminary work is heavy and difficult; Fifth, the construction of infrastructure and resettlement houses directly affects the promotion of the next work and social stability; The sixth is the relocation of family workshops and enterprises involving the coordinated relocation of towns and villages.
(2) The next step plan
First, urge the project implementation unit to complete the acceptance as soon as possible, further promote the allocation of provincial and municipal award funds as soon as possible, and arrange the allocation of county-level matching funds as soon as possible; Second, the township where the project is located is required to arrange a leader in charge of the project implementation, and the county will further increase the coordination of work; Third, actively communicate and coordinate with urban construction, land management and other departments to strive for more construction land indicators in provinces and cities; Fourth, speed up communication and consultation with the contractor, complete cooperation negotiation and sign an agreement as soon as possible, complete the design of resettlement site construction scheme and start the first phase of resettlement housing construction for relocated households within the year.