Personal Work Summary of Engineering Employees (1) 20xx years will soon pass and a new year will begin. Reviewing the work process and summing up the experience and lessons of the past year will help to foster strengths and avoid weaknesses in future work and better do technical work. Here, I report to the leaders on my work in the past year:
In the past year, due to the support of the company and the project department, I worked as a technician in the powertrain project department. In the past year's construction, with the care and help of many enthusiastic people in the project department, my work has made great progress, both in technology and quality inspection and management. Of course, my achievements only represent the past, and I will redouble my efforts to do better in the future.
"Scientific things must not have hypocrisy and pride". In engineering, the technical content is high, which requires our technicians to treat their work with a down-to-earth and rigorous attitude, rather than overstaffing. We should be good at learning what we don't know and constantly improve what we know, because technology is constantly improved and updated. Only through continuous learning, supplemented by pragmatic and down-to-earth style, can we be competent for our job.
All engineering construction, technology and quality inspection work runs through. In the accumulation of work experience, you can gradually cultivate your foresight, so as to play the role of technology first. Different from other industries, the construction industry needs constant on-site inspection and supervision to find and solve problems at any time, which requires us to constantly cultivate the spirit of being hard-working and not afraid of hardship and fatigue, let go of the lofty attitude of managers and enrich ourselves from the actual work of the project.
As a member of our company, I feel extremely proud to have the opportunity to study and exercise under such conditions. This environment and external conditions give us a sense of self-confidence and glory, but it is more of a spur to our future work, requiring us to always restrain ourselves with the image of the company in our work. All our words and deeds must conform to the company's consistent standards, and gradually cultivate our own personal qualities and self-cultivation, so as to be worthy of the trust and training of leaders. By summing up the work in the past year, we can find out the shortcomings in our work so as to overcome them in our future work. At the same time, we need to read more books, study norms and related documents, master professional knowledge, improve our working ability, strengthen our sense of responsibility, and do our personal work in time.
In short, in the future work, I will constantly sum up and reflect, constantly spur myself, enrich my energy, improve my quality and professional level, so as to adapt to the development of the times and enterprises and make progress and growth together with the company.
Summary of personal work of employees in engineering department (2) Time flies, and the sun and the moon fly. One year is really short, and before you know it, 20xx years will pass. The new year has come again. At the turn of the old and the new, we should sum up the past, think about the future, learn from the past, make up for the future, and summarize our work in order to better complete our work in the new year.
Joined the company's engineering department in 20xx, mainly responsible for the technology, construction and cost management of HVAC and water supply and drainage. In the course of my work, I will abide by the company's rules and regulations, be strict with myself at ordinary times, and be honest and self-disciplined. I am conscientious and responsible in my work, able to integrate theory with practice, cooperate with colleagues in the engineering department and related departments, and better complete all the work assigned by the company leaders.
First of all, in terms of technical management
1, can patiently and meticulously do a good job of drawing review, cooperate with the competent leaders and relevant design units to implement the location and direction of water supply and drainage, heating, gas and other pipe networks in the community, find unreasonable schemes and designs as much as possible, put forward their own schemes and ideas, actively communicate with designers, and improve the design of schemes and construction drawings. For example, Zhongrong International Project has many underground structures, and the underground garage and underground civil air defense are connected with various buildings, which will lead to drainage pipes in the future.
Therefore, it is proposed to the competent leader that a passage should be set aside between the 2nd, 3rd, 4th and 5th floors and the underground garage and underground civil air defense, otherwise the drainage pipe network in the community will not be laid. For another example, the design institute designed the heating and water supply and drainage pipes of the connector on the street of Hankou, but there was no place to lay so many pipes on the street of Hankou. After consulting the competent leader, raise an objection to the design unit in time, and change the design after being audited by the design unit.
2. External coordination:
For an engineering project, external coordination is of great help to the smooth development of the project. My main job is to cooperate with various professional companies (tap water, heating, gas) to complete the supporting design of the pipe network of the project under the guidance of the competent leader. With the correct leadership and help of the leaders, we have maintained a good cooperative relationship with various professional companies, and the supporting design of various professional pipe networks is proceeding as scheduled. At present, the design of water supply and drainage pipe network has been completed, and the design of gas and heating pipe network is under way. In the process of work, I can actively cooperate with various professional designers to complete various tasks from the company's interests and perspectives.
Second, in terms of construction site management
When I entered the construction site in early April, I began to study the site water use scheme with the leaders, and assisted the leaders to complete the relevant procedures and design work after the scheme was implemented. In cooperation with the water supply company, the construction of temporary water and on-site construction water for Zhongbaiyi Reservoir was completed, ensuring that the project started as scheduled. Before foundation excavation, with the help of leaders and colleagues, the laying of drainage pipes in the construction site was completed according to the actual situation, which solved the drainage problem of foundation excavation in various construction units.
In the process of making the scheme, the plastic drainage pipe is adopted in combination with the actual project. After drainage, the pipeline can also be used for the hole of the range hood, saving some funds for the company. After the project entered the main construction stage, in view of the hidden parts that are prone to problems, the supervisor and the plumbing squad leaders of various construction units were organized to hold a meeting in time, which put forward clear requirements for waterproof casing's materials and production, and made technical disclosure on the problems that are prone to occur in the project. All construction units are required to do a good job in the sample room before the construction of each working procedure, and can continue the construction only after passing the inspection by Party A and the supervisor to ensure the engineering quality.
In the process of engineering construction, because the professionals of the supervision company sometimes can't be in place in time, it is necessary to regularly check whether the positions and specifications of various pipelines meet the design and specification requirements, and find and deal with the problems existing in the project as soon as possible, so as not to affect the construction of subsequent projects. For example, improve the elevation of the drainage pipe outside the house and solve the problem that the drainage pipe on one side of Hankou Street is too low. In the process of construction management, we can adhere to the design documents as the basis, in strict accordance with the requirements of construction specifications for inspection.
Third, in terms of project cost management.
Be able to strictly review the site construction visa, follow the principle of construction visa, effectively control various factors affecting the project cost, carefully review the list of materials proposed by the construction unit, and correct problems and mistakes in time when found.
The above is what we have done in the past year. In the past year, we have made some achievements, but also some shortcomings, summed up the past experience and tried to correct the shortcomings in our past work. We will be more strict in our future work. While doing our job well, we should constantly learn and accumulate, constantly ask questions, constantly solve problems, and constantly improve ourselves to ensure high efficiency and high quality. Dedicated to the development of the company.
Summary of personal work of engineers (3) Looking back on the past year, I was filled with emotion. Because 20xx is a year full of hardships and challenges for our project, I will summarize the work of 20xx and report to the leaders and colleagues present here:
A, the responsibility of the engineering department
If the hotel is compared to a person, our engineering department is like a person's heart, and the water, electricity, oil and heating in our engineering department are like blood, oxygen and nutrition delivered to various departments. No matter what happens in any link, it will bring irreparable economic losses to the hotel and directly affect its reputation and image. To this end, we have established a patrol inspection system, found problems and solved them in time to nip the accident in the bud. For example, since September this year, we have received complaints from the catering department. Guests who come to our hotel for dinner generally complain that the indoor temperature is not enough and the air conditioner blows air.
After learning this situation, all of us have carefully analyzed and studied it, and found that it is because the temperature of the heat source provided by the railway boiler room is too low, and it is also because the heat exchange efficiency of our heat exchange system is reduced due to aging. How to solve this problem? After repeated thinking, I resolutely decided to transform the heat exchange tank in the low zone into the heat exchange of the air conditioning system, and convert all the only 50-degree heat energy supplied by the railway boiler room to reach the temperature required by the air conditioning and ensure the business of all departments.
Second, energy saving and consumption reduction benefit from the inherent equipment.
Water saving: For a period of time, we often found that the water supply system in low-lying areas was abnormal and often lacked water. Through the field investigation of drainage pipe network, we found some problems in the system. In order to solve this problem, we changed the original direct water supply to variable frequency and constant pressure water supply, and added solenoid valve control in the water tank, in which the water level controller was transformed from the circuit board of some sewage gates, which ensured the stable supply of water pressure and saved water 1.500 tons per month.
Power saving: During the renovation of the hotel, in order to improve the visual effect and create a comfortable dining environment for the guests, we added exhaust equipment and used a lot of high-power light sources, but the monthly electricity consumption increased by 0.42% compared with before. In this case, I often wonder how to work without affecting the illumination and reduce the electricity consumption.
After brainstorming, we finally decided to replace the floor lamp and desk lamp in Room 9 1 with the 1 1 watt energy-saving lamp, and replace the 40-watt bedside lamp with the 25-watt candle bulb, which can save 8.8 kilowatts. Accordingly, we reduced the grid lights on the first floor to the third floor from 50 watts to 35 watts, which can save 2.2 kilowatts and reduce the 65,438 watts in the parking lot. When it is reduced to 3 lamps, it can save electricity, 3.88 kilowatts. By taking these measures, compared with the initial opening, the power consumption decreased by 0. 13%.
Consumption reduction: As the small refrigerators in guest rooms have exceeded the warranty period, the refrigeration equipment is replaced by the manufacturer every time. The cost of a complete set of refrigeration equipment is 1.6 yuan, so if more than 90 refrigerators go on like this, it will definitely cause great expenses. Master Zhu Yingchun, our assistant engineer, finally found the crux of the problem by consulting a lot of technical data and repeatedly testing the refrigerator on the Internet. Only by replacing the refrigeration components can the problem be solved.
But the refrigerator in the kitchen has brought us new problems, because the evaporator leaks and cannot be repaired. Because it's a pity that this is scrapped, it will cost thousands of dollars to buy it again. In order to reduce the cost and save money, after careful study, we decided to make the evaporator with purple steel pipe. Fixing it on the shelf will not damage the box and increase the refrigeration capacity. In this case, we repaired three refrigerators, saving the hotel more than 12000 yuan.
Third, cultivate team spirit and show a variety of skills.
1. When the second room was renovated, the original plan was just to scrape white and change wallpaper. However, in the process of implementation, it was found that the shed items on many floors were cracked and delaminated, especially on the eighth and ninth floors. If you want to rebuild the cement mortar layer, you need a period of maintenance, which requires both talents and material resources.
In this case, we immediately asked the leader for instructions and explained that if we had our own gypsum board shed, it would not only save time, but also save a lot of manpower. After careful study, the leader finally adopted my suggestion. Before the renovation of each floor, our engineering department is responsible for protecting all the furniture in the room and dismantling all the electrical facilities, and then restoring them after the renovation. At that time, under the circumstances that our electricians were few and the construction period was tight, Wang Tieyan, the little tiger foreman named after us because he was not afraid of hardship and fatigue at work, dared to rush and work, and led two shift electricians to work overtime on time, regardless of day and night.
2. In order to maintain the labor discipline of our hotel and strengthen the security measures in the hospital, the leader decided that our engineering department would be responsible for building a house in the backyard as a security office. After receiving this task, everyone Qi Xin worked together to give full play to their strengths. It took only six or seven days to successfully build the security office, which was appreciated by the leaders.
3./KLOC-During the fire inspection in October/October, the fire department suggested that the materials of our oil and steam pipelines were not up to standard and needed to be rectified. This will not affect the normal business, so we must use the time after the night market to start business. All the original aluminum pipes were replaced with galvanized pipes. Our three comrades, Wang Tieyan, Guan and Ding, worked continuously for three nights without affecting their daytime work, and all the oil and gas pipelines were rebuilt. Successfully passed the inspection and verification of the fire department.
Four. Shortage of 20xx years' work
The work of 20xx has come to an end, with both achievements and shortcomings. Because I am honest and frank, sometimes I will be impatient. If I say it, it will easily hurt people and will inevitably bring unnecessary trouble to my work. In the future work, I will adjust my mentality, strive to master electrical knowledge, constantly improve myself in my work and study, further improve the service level of the engineering department and the skills of employees, and lay a good foundation for 20xx to better serve all departments.
Verb (abbreviation for verb) 20xx work plan
We have drawn up several special projects to be implemented in 20xx:
1. In order to ensure the normal use of air conditioning in the whole hotel in summer, we need to conduct a comprehensive overhaul of air conditioning units.
The water resources of our hotel are controlled by the outside world. In order to prevent the economic loss caused by external water cut, we are going to make a spare water tank.
3. According to the requirements of the municipal bureau, and in order to ensure that the economic property of the guests is not lost, we have to install a monitoring system for each floor of the customer.
4. The electricity consumption of all departments is not criticized, and we are going to add electricity meters to all departments to facilitate monitoring.
5. The exterior walls of all rooms were damaged during the room decoration, so we decided to re-tile all the exterior walls of Room 0a, which not only ensured the image and beauty, but also prevented the rain from invading from the window.
None of the above work plans is very comprehensive and needs to be gradually improved in implementation. Finally, I want to say to all my colleagues in the engineering department: "You have worked hard! Thank you very much Because your support gave me confidence and courage! It is you who have contributed to our hopes and dreams. I want to praise your fighting spirit. " In the new year, we will certainly achieve great success again.