Current location - Health Preservation Learning Network - Health preserving class - What does the passbook project mean?
What does the passbook project mean?
Question 1: What is a passbook item? The passbook project is an important project in which the deputy mayor in charge is responsible for the division of labor and the relevant committees, offices, bureaus and contractors coordinate and cooperate. It requires that tasks, time limits and responsibilities be clear and specific, and be put in place. It is a pro-run project approved and mastered by * *.

Question 2: Introduction to the passbook project The passbook project in Beijing is an important project coordinated by relevant committees, offices, bureaus and contractors. It needs words and guarantees to be carried out. It is a pro-run project approved and mastered by * *.

Question 3: * * * What's the difference between the practical project and the passbook project? 10: The former relates to work ability and performance, while the latter relates to their jobs.

Question 4: passbook project 20 13 Beijing * * * passbook project 20 13 April 17, Beijing * * * general office announced "municipal * * * passbook project 2013", 188 passbook project will Compared with last year's passbook project, the number of tasks this year has increased by three. Most of the tasks are led by the deputy mayor, and the completion time is about 65438+the end of February. This year's passbook project is basically determined according to the task requirements put forward in the work report of the People's Congress in June+10/October this year. * * * is divided into 9 categories, including the main goals of economic and social development; Accelerate the transformation of economic development mode and promote the sustained and healthy development of the capital economy; Strengthen urban construction and management, and constantly improve the level of urban comprehensive services; Strengthen the construction of ecological civilization; Strive to create a service-oriented service that the people are satisfied with. Traffic congestion is a hot topic of social concern. There are 12 tasks directly related to traffic congestion control in the passbook project, including the implementation of 28 measures for comprehensive traffic congestion control and the study and formulation of annual work plans for traffic congestion control. Further control the excessive growth of automobiles. At this year's two sessions in Beijing, Chen Gang, member of the Standing Committee of the Municipal Party Committee and deputy mayor, once said that although the lottery policy was adopted, the lottery index of more than 200,000 vehicles per year was still relatively large. Beijing will control the growth and use of automobiles, and will take measures, including economic and legal measures, to make use of the existing 5.2 million motor vehicles, especially in extreme weather. In the task of "further controlling the excessive growth of automobiles", the main responsible unit is the Municipal Transportation Commission, and the co-organizers are the Municipal Development and Reform Commission, the Municipal Science and Technology Commission, the Municipal Public Security Bureau, the Municipal Environmental Protection Bureau and the Municipal State Taxation Bureau. At the end of last month, the city's environmental improvement started. The passbook project proposes to strengthen the control of PM2.5, do a good job of pressing coal, changing cars and reducing dust to ensure that the concentration of major pollutants in the air drops by 2% on average; Eliminate 6.5438+0.8 million old motor vehicles; Strengthen air quality monitoring analysis and information release, and promote regional joint prevention and control. At the same time, crack down on illegal production, operation and construction; Complete the upgrading of Dongba, Fatou, Wulituo sewage treatment plants and Jiuxianqiao sewage treatment plants; Before the end of the year, the proportion of domestic waste incineration treatment will reach more than 25%. Recently, the Standing Committee of the Municipal Party Committee decided to implement the residence permit system this year. The passbook project also proposes to speed up the research and implementation of measures and methods for the residence permit system, promote the construction of the actual population management system, innovate service management, promote the orderly integration of floating population, and promote the coordinated and sustainable development of population, resources and environment in the capital.

Question 5: What does the 2065438+02 Pinggu passbook project mean?

The English translation of the question passbook project is the dregs project, that is, the bean curd dregs project.

Jerry decided to build a bean curd residue project.

Question 7: Zhao Zhixin's wife, Zhao Zhixin, graduated from the track and field major of the Department of Physical Education of Sport University in, and was once a teacher of Sport University. She was approved by the State General Administration of Sport as a national social sports instructor in. At present, he is a lecturer group of scientific fitness experts, a member of the passbook engineering expert group (responsible for mass fitness), the chief lecturer of Nordic Walking in the Physical Education Institute of the State Sports General Administration, the technical director of the Xuan Yin Fitness Center for the Elderly in Yuetan Community, the national social sports instructor, the technical director of the Industry Training-Healthy Walking Promotion Center of China Athletics Association, the director of the china health care association Osteoporosis and Osteoarthropathy Research Association, the executive director of the Brain Defense Office, and the director of the China Marriage and Family Research Association. Director of Youth Federation, physical fitness coach of China national fencing team, vice chairman of long-distance running club, chief expert of health expert group of state-owned enterprise trade union health engineering sports, director of sub-health society. 34 years old

Question 8: How old is Zhao Zhixin, the teacher of Yangshengtang? Zhao Zhixin was born in July 1944. He has done special scientific fitness programs on CCTV, Beijing TV and Beijing People's Broadcasting Station.

1976 graduated from the Department of Physical Education of Beijing Sport University, majoring in track and field. He used to be a teacher of Beijing Sport University, and was approved as a national social sports instructor by the State Sports General Administration in 2000. He is currently the Secretary-General of Beijing Scientific Fitness Expert Lecturer Group, a member of Beijing 143 passbook Engineering Expert Group, the chief lecturer of Nordic Walking in the Sports Institute of the State Sports General Administration, the technical director of the Healthy Walking Promotion Center of the Industry Training Department of China Athletics Association, the director of china health care association Osteoporosis and Osteoarthropathy Research Association, the executive director of Beijing Brain Defense Office, the director of China Marriage and Family Research Association, the director of Beijing Youth Federation, the physical fitness coach signed by China National Fencing Team and the vice chairman of Beijing Long-distance Running Club.

Question 9: Has anyone heard of Shougang Biomass Energy Project? What is this? Somebody tell me. Shougang Biomass Energy Project is a key construction project in Beijing, a green approval channel project in Beijing, a 201kloc-0/passbook project for the construction of garbage disposal facilities in Beijing, a key construction project in western Beijing, and a "Science and Technology Beijing Action Plan" project. The construction site of this project is located in the south factory area of Lujiashan Shougang Road Mine, Tanzhesi Town, Mentougou District, Beijing, with a total land area of 23.7 hectares, including construction land area 12.7 hectares, road land area 1 1 hectare, with a total construction area of 66,000 square meters.

Question 10: How long does it take to sit at X Beijing West Railway Station, Mafang Town, Pinggu District, Beijing? How? How much x? Please thank you for taking the bus: Pinggu 2 (Mafang Development Zone-Pinggu Chinese Medicine Hospital); Mafang Development Zone (1 after stopping); Tatiezhuang (about 250 meters on foot); Changed to: 9 18 Express 1 (Pinggu Bus Station-Dongzhimen (Hub Station)); Take the Tatie Zhuang (after 2 stops).