Compacted lime shall be laid and compacted daily. The compacted lime in the trough (pit) shall not be compacted every other day. Compacted lime soil shall not be soaked in water within 30 days, and foundation construction and foundation pit backfilling shall be carried out in time, or the surface of lime soil shall be temporarily covered to avoid sun and rain. During construction in rainy season, appropriate waterproof and drainage measures should be taken to ensure that the lime-soil foundation trench (pit) does not accumulate water. In case of sudden rain, the soft lime soil should be removed and compacted; Slightly wet lime soil can be compacted after drying.
In normal temperature season, the compacted lime base should be watered and maintained for 7 days. Moisture is an important part of compacted lime. During construction, the moisture in the soil causes the physical and chemical interaction between lime and soil to meet the needs of the formation strength of lime soil;