Self-inspection report of construction review
1 The construction drawing review agency shall affix the official seal on the cover of the construction drawing design document review report;

2. The technical review report shall be signed by relevant professional drawing reviewers; The specialty that implements the registration system should be stamped with the special seal for the practice of the first-class registrar; Projects with building energy-saving requirements should be stamped with special seals for energy-saving review on relevant professional pages;

In addition to the signature of the enterprise legal person and the technical person in charge of the enterprise, the page of comprehensive conclusions and opinions shall be stamped? Special seal for construction drawing review? , official seal of the enterprise; If there are energy-saving requirements, stamp them? Special seal for special review of energy conservation of construction projects? ; In addition to the signature of the enterprise legal person and the technical person in charge of the enterprise, the certificate should also be stamped with the official seal.

3. For the approved construction drawings, each drawing should be stamped? Special seal for construction drawing review? For projects with building energy efficiency requirements, the relevant professional pages should also be stamped? Special seal for special review of energy conservation of construction projects? .

4. The design change data is an integral part of the construction drawing design documents, and the signature and seal requirements of the design change data and the number of copies are the same as those of the construction drawing.

1. Project Description: Project Name: Kunming Spring City Golf Construction Project (Phase I and Phase II)-ktv, recreation room and coffee bar renovation project scale: construction area of 492㎡ Location: Yiliang County, Kunming Building function: number of entertainment floors (total height): overground 1 floor (4.20m). Structure type: steel frame building engineering grade: Class III fire resistance grade: Class II building site category: Class II seismic fortification intensity: 8 degrees (0.3g) Class II. Examination basis: 1. National regulations on quality management of construction projects.

Two, the Ministry of construction "construction drawing design documents Interim Measures"

Three. Guiding opinions of the Ministry of Construction on issues related to the review of construction drawing design documents? In addition to the contents related to safety, public interests and mandatory standards and specifications, other issues related to the rationality of design economy and technology and design optimization can be solved by the construction unit through scheme comparison or design consultation. ?

Four, "Yunnan province construction drawing design documents review implementation details".

? Article 10 The main contents of construction drawing review

(a), whether to meet the requirements of the scheme design or preliminary design approval documents (focusing on the implementation of project function optimization measures, etc.). )

(two) the stability and safety of the building, the safety of the foundation and the main structure, and the rationality and legality of using computer software; (3) Whether the construction drawing documents meet the specified depth requirements; (four), whether it meets the current national mandatory standards for buildings (including fire protection, energy saving, environmental protection, health), structures (including foundation, envelope engineering and civil air defense engineering, earthquake resistance), barrier-free design, etc.; (five), whether it harms the public interest; (6) Chapter III of Regulations on Quality Management of Construction Projects provides relevant provisions on quality responsibilities and obligations of survey and design units. ?

Five, "Yunnan province construction drawing design documents review notice".

Six, engineering construction drawings and related information and relevant national laws, regulations and rules.

Review comments: The design depth of the construction drawing of this project basically meets the requirements of the Provisions on the Depth of Compilation of Design Documents for Architectural Engineering. There are still mistakes and omissions in the construction drawing of this project, some of which do not conform to the specifications, and some structural calculations and structures need to be reviewed and adjusted. There are many mistakes and omissions in the construction drawing of this project, which need to be supplemented and revised for review. There are still some deficiencies in the survey report after review, and it can be used for design after supplementary modification. Reconnaissance units need to reply to our center if they modify the existing problems.

"1", the main problems of this project:

(1) The building part is 1, and a new floor is added. Use the original building corridor as an evacuation exit. Whether the two safety exits can go directly to the outdoor and whether the evacuation distance meets the provisions of Article 5.3. 13 of Code for Fire Protection Design of Buildings (gb500 16-XX) needs to be reviewed.

(2) Structure part 1. The design should indicate the relationship with the original structure, check the original structure and take reinforcement measures when necessary. Please design and supplement relevant calculation data, and then resubmit for approval.

(3) Other parts: 1. The reconstruction project and the original building form a complex, and its fire protection standards and nature need to be considered in a unified way. 2、? Central air conditioning system? The equipment configuration does not conform to Article 7. 1.5 (strong article) of Code for Design of Heating, Ventilation and Air Conditioning (gb500 19-XX). Need to be revised. 3. The overall depth of professional design does not meet the requirements of Article 4.7.5 of the Provisions on the Compilation Depth of Architectural Engineering Design Documents; This drawing does not conform to the relevant provisions of Unified Drawing Standard for Building Construction gb/t5000 1-XX and Drawing Standard for HVAC gb/t50 1 14-XX. It needs to be revised and improved before it is submitted for trial. 4. The power box load/calculated current is wrong, and the single-phase load should be converted by 3 times of the maximum phase; The incoming switch dz 10 should be selected by the elimination product department; 200a incoming switch does not match yjv-4*50+ 1*25 cable; Spd shall be equipped with protection switch; Please check the adjustment. 5. Please review and improve the requirements for the setting and wiring of fire emergency lighting and evacuation signs according to Articles 1 1.3 and11.6 of the Building Code.

(4) Article 24 of other Regulations on the Administration of Survey and Design of Construction Projects in Yunnan Province stipulates that the seal of registered architect has expired and must be supplemented with design documents before it can take effect.

"II", fire protection design review opinions

(1) Whether it is necessary to set two Class B fire doors on the 4th and 5th axes of the building part 1 and the ktv walkway on the first floor, please check. 2. Add a new floor and use the existing building corridor as an evacuation exit. Whether the two exits can go directly to the outdoor and whether the evacuation distance meets the provisions of Article 5.3. 13 of Code for Fire Protection Design of Buildings (gb500 16-XX) requires overall drawing review.

(2) Water supply and drainage: 1. Fire quality of this project: ktv, recreation room and coffee bar of the club are multi-storey buildings with high height; 0.9, energy saving control, etc. ) .2. For the second installation site (lamps are determined by the decoration unit), the lpd value requirements of each site are put forward according to Tables 5.2.5 and 6. 1.4 of the Lighting Design Standard, and the power of lamps is controlled.

Review opinions of various professions

Review opinions on construction drawings of geotechnical specialty

1. This project is the reconstruction of the original building, and there is no design scheme for the reconstruction part. According to the description in the survey report, the original building (1 floor) is added, and the drilling holes with the depth of 10.2 ~ 17.8 m are arranged around the original building for survey. Through drilling, it is basically found that the surface layer of foundation is 0.4 ~ 1.0m thick fill, followed by Quaternary residual red clay and Devonian limestone. Drilling revealed that the buried depth of bedrock in the site was between1.6 ~12.7m, that is, the thickness of the upper soil layer changed greatly. According to the borehole elevation of 95.8 ~ 103.2 m, the site elevation difference is large.

2. Only six standard penetration tests were conducted in the red clay layer in this survey, and no samples were taken in the indoor test. Most relevant geotechnical parameters are duplicated. Geotechnical investigation report on single apartment of Kunming Cheng Chun Lakeside Tourism Real Estate Co., Ltd.? The information in this newspaper, especially the one attached at the end of this newspaper? The index table of main physical and mechanical properties of each soil layer is copied from the test results of some boreholes in a single survey and compiled as the test results of some boreholes in this survey. This is inappropriate, which violates the requirements of geotechnical engineering specifications for detailed survey, does not conform to the relevant provisions of survey document compilation, and the index data can not reflect the actual situation of the site.

3. Add stories to existing buildings, find out the form, size, buried depth, bearing layer and bearing capacity of existing foundations, check the deformation, take measures to control the additional settlement caused by additional load after adding stories, and coordinate the settlement and deformation of new and old foundations if there are new foundations. It is suggested in the report that the 1 layer should be covered by manual digging piles, with limestone as the bearing layer. It is necessary to further consider, or according to the upper load, properly remove the shallow buried part of bedrock, and then adopt mattress treatment, with red clay as the bearing layer. In the process of adding stories, it is necessary to observe the settlement of buildings. The elevations used in this report are hypothetical elevations, and the connection with the urban construction height system should be established. IV. The report copied the drilling sampling data of other projects and compiled the physical and mechanical properties index table of this project. The sampling test work of red clay layer should be supplemented, and the physical and mechanical properties index statistics table should be made separately before it is provided for design use.

Review opinions on construction drawings of architectural specialty

1. Construction drawing design document 1, general plan of the project, ktv, recreation room, etc. It has been stamped with the special seal for drawing examination of the construction project planning permit of Yiliang County Planning Bureau, which meets the planning requirements. 2. The reconstruction project should be based on the original civil engineering drawings and the opinions of the project owner. Please check the structural form and load of the storey-adding part with the structural specialty, which should meet the building safety. 3. The period of validity of the seal of registered architect has expired. Please stamp it. 4. This project adds a floor to the original basement for ktv rooms and fitness mahjong rooms. The seismic fortification intensity of this project is 8 degrees, the design service life is 50 years, and the fire resistance rating is Grade II (the fire resistance limit of steel columns and steel roof trusses shall comply with the provisions of Article 5. 1. 1 in Code for Fire Protection Design of Buildings (gb500 16-XX)). According to Article 3.0. 1 of Technical Specification for Roofing Engineering (gb50345-XX), the waterproof grade of multi-storey buildings should be Grade III, please review and modify it. Second, the design of civil reconstruction is 1, and the indoor elevation of newly added ktv and recreation room is +0.00= 1 16.8, which is 5.9m higher than the basement. There should be a height difference between the inside and outside of the new floor to meet the requirements of outdoor drainage. Please supplement and improve. 2. The joint between the new building and the original building corridor should be constructed. Please add it. 3. ktv rooms and mahjong rooms without windows should be added with external windows. Rooms without external windows should be ventilated. Please add. 4. The width of a single door in a KTV room is 900 (size of the hole), so it is suggested to change it to 1000 for convenience. Three. Fire protection design 1, please check whether it is necessary to set two Class B fire doors on axis 4 and axis 5 of ktv walkway on the first floor. 2. Add a new floor and use the existing building corridor as an evacuation exit. Whether the two exits can go directly to the outdoor and whether the evacuation distance meets the provisions of Article 5.3. 13 of Code for Fire Protection Design of Buildings (gb500 16-XX) requires overall drawing review. Four. Energy saving design 1. The wall materials include 240 red brick wall blocks, 240 red brick concrete blocks and 190 concrete hollow blocks. Please check. The use of wall materials should meet the requirements of energy saving. 2. Please supplement the heat transfer coefficient of the roof to meet the specified requirements.

Review opinions on construction drawings of structural specialty

I. Project Overview 1. The renovation project of this project mainly includes 1#, 2#, 3#, 4# and 5# steel roofs. 2. The seismic fortification intensity of this project is 8 degrees (0.3g), and the site category of Group I is Class II. 3. Structural material: q235b 4. No relevant calculation data was sent in this review. Second, this design is based on the original reinforced concrete structure plus a layer of steel frame structure. Should check whether the original design foundation can meet the bearing capacity requirements of new buildings. Please check the design. Three. Structural calculation analysis and measures 1. This project is a reconstruction project. The design should indicate the relationship with the original structure and check the original structure. When necessary, reinforcement measures should be taken. Please design and supplement relevant calculation data, and then resubmit for approval. 2. The new structural system is not clear, and the original building situation is not clear. The dynamic characteristics of the two structures are quite different after connection, which is not satisfactory. Please check and modify. 3, the new structure should adopt a clear structural system, and should be considered separately from the original building. Please modify the design. 4. The column foot shall meet the requirements of Article 8.9.3 of GB 500 17-XX to avoid corrosion damage of the column foot. 5. The design of each node of roof truss is unreasonable, and there are many missing nodes, which need to be supplemented and improved.