Pingyuan (Jianye) Sports Center is a newly-built large-scale comprehensive gymnasium with the most functions in Xinxiang, and it is known as "a new landmark in Xinxiang". The project was completed on April 6th, 2002 1, with a total area of 25 1 000 square meters and a total construction area of about1004 square meters. It is an important supporting project for people's livelihood in Dadong District of Xinxiang.
The competition venue is located at the intersection of Jinsui Avenue and Dongming Avenue in Hongqi District, Xinxiang City, with convenient surrounding transportation, close to Xinxiang East exit of Beijing-Hong Kong-Macao Expressway, 5.3 kilometers away from East high-speed railway station, and about 8 minutes' drive. The living and cultural atmosphere around the venue is strong, forming a "amorous feelings triangle" with nearby Henan Institute of Technology and xinxiang university.
It is also close to high-end residential areas such as Jianye Shihefu and Country Garden, and has a wide range of quality service groups. The venue area of Pingyuan (Jianye) Sports Center includes four major venues: fitness center, swimming pool, gymnasium and exhibition hall, in which the fitness center and swimming pool are designed as a whole, and the gymnasium exhibition hall is designed as a whole.
Each venue is introduced as follows:
The swimming pool and fitness center are designed as a whole, located in the east half of the sports center. Swimming pool is the basic requirement of Class B swimming pool, which meets the needs of holding regional competitions, local and mass sports meetings and leisure and fitness at ordinary times, with a total land area of 230 1 14m2. The gymnasium and exhibition hall are designed as a whole.
The gymnasium and exhibition hall are located in the west half of the sports center, with a total construction area of 25575m2. The first floor of the exhibition hall is 13m and the second floor is 8.5m, with a total construction area of 145 15m2. The first floor of the exhibition hall is 13m and the second floor is 8.5m, with a total construction area of 145 15m2.