In order to cooperate with the construction project of Bao Tong Street Expressway, our company plans to stop the water supply pipeline at the intersection of Bao Tong Street and Beihai Road on 202 1.
First, the scope of water stoppage
Users on both sides of Bao Tong Street;
Users on both sides of Beihai Road;
Users on both sides of Sakura Street;
Users on both sides of Xinhua Road;
Users on both sides of Beihai Road.
In addition, users near the boundary of the water stop range will be affected by the water stop construction, and the water pressure and water quantity will fluctuate. It is suggested that these users should also prepare for water storage.
Second, the water cut-off time
2021may 2 1 8: 00-22: 00.
Users in relevant areas are requested to store water in advance and inform each other, and check the water facilities at home and turn off the faucet to avoid unnecessary losses. Please forgive the inconvenience caused to you!
Note: If water is supplied in advance without further notice, it will take some time for the pipe network pressure to rise to a normal level after water supply is resumed, and it is normal for the water pressure to fluctuate temporarily and the water quality to be turbid.
Hotline service: 866 1 10.
Weifang tap water co., ltd
202 1 may 19