Current location - Health Preservation Learning Network - Fitness coach - What is the standard of sports wooden floor? What is the specific process of construction?
What is the standard of sports wooden floor? What is the specific process of construction?
1, the pavement scheme should remain unchanged.

What materials are used and how to lay the stage of each stadium or theater are determined according to the actual parameters and investment budget of the stadium. Therefore, once the pavement scheme of sports wood floor is decided, it should not be changed easily.

Frequent changes in the design and construction scheme of sports wood flooring will increase additional investment and even affect the construction period. Therefore, when designing the paving scheme of sports wooden floor, we must communicate and coordinate with the manufacturers of sports wooden floor, clarify the standards and avoid unnecessary problems. ?

2. Customized products should be made in advance.

The overall structure of sports wood floor is basically solid wood structure. During production, the moisture content of the floor will be determined according to the climatic conditions and moisture content changes of the installation project, which is generally about 6%- 14% on average. Before ordering the sports wooden floor, you must set aside enough production time to ensure the quality of the floor.

3, avoid cross construction

Cross construction is the paving project of sports wooden floor, which is carried out simultaneously with other construction projects of sports venues and conflicts with each other. Cross-construction should be avoided in the paving project of sports wooden floor, which will affect the smooth paving of sports wooden floor, otherwise the construction of other sports venues will damage the paved sports wooden floor.

4. Participate in supervision and acceptance.

Although the installation project of sports wooden floor is operated by the paving engineer of the sports wooden floor manufacturer. However, the stadium builder and Party A should also arrange special personnel to follow up and supervise, and solve the problems in the installation of sports wooden floor in time.