1. If the land use examination and approval procedures should be handled according to law, the land use examination and approval procedures for this construction project have been handled.
2, in the city, town planning area of the construction project, has obtained the construction project planning permit.
3. If the construction site has basically met the construction conditions and houses need to be requisitioned, the progress will meet the construction requirements.
4. The construction enterprise has been determined. If there is no tender for the project that should be invited in accordance with the regulations, or if there is no public tender for the project that should be invited in public, or if the contracted project is dismembered and contracted to an enterprise that does not have the corresponding qualifications, the determined construction enterprise is invalid.
5, there are technical data to meet the needs of construction, construction drawing design documents have been qualified in accordance with the provisions.
6, there are specific measures to ensure the quality and safety of the project. In the construction organization design compiled by construction enterprises, there are corresponding quality and safety technical measures formulated according to the characteristics of construction projects. Establish the responsibility system for project quality and safety, and implement it to people. Special quality and safety construction organization design has been compiled for professional engineering projects, and engineering quality and safety supervision procedures have been handled according to regulations.