2.X- 1+X-2 = x+ 1+X。
Solution: X=7
3. The circumference of a rectangle is (7+6+6+5) * 2 = 48m.
So the speed of A is 4.8 and the speed of B is 3.2.
Two days after construction, Party A completed 9.6m, Party B completed 6.4m, * * * completed 16m.
There are still 32 meters left, and B needs to do 32/3.2= 10 days.
Or use the following equation:
It will take x days to complete this solution.
2( 1/ 10+2/ 15)+ 1/ 15X = 1
X= 10
A: It will take 10 days to complete.
Hope to adopt. This is the math class training of Jiangsu Education Edition. We did it. What a coincidence.