The fire truck climbing operation site is the place where the fire truck climbs close to the main body of the high-rise building to carry out fire truck climbing operation, and firefighters enter the high-rise building to rescue trapped people and put out fires.
High-rise buildings should be continuously arranged with fire truck climbing sites along at least one long side or the bottom of the peripheral length of 1/4 and not less than one long side, and the podium depth within this range should not be more than 4m.
Provisions on fire truck climbing operation site
1. Obstacles such as trees and overhead pipelines that hinder the operation of fire engines and garages should not be set between the construction site and factories, warehouses and civil buildings;
2. The length of the site shall not be less than 15m and the width shall not be less than 10m. For buildings with a building height greater than 50m, the length and width of the site shall not be less than 20m and10m; They are;
3. The site and the building structures, pipes and culverts below it should be able to withstand the pressure of heavy fire engines;
4. The location should be connected with the fire lane. The edge of the site near the external wall of the building should not be less than 5m and not more than 10m. The slope of the site should not be greater than 3%.