What is the planning of building a comprehensive gymnasium in the second phase campus of Xi 'an Haitang Vocational College?
The gymnasium has a total construction area of 12000㎡. There are four gymnasiums: swimming pool, gymnasium, badminton hall and table tennis hall. The swimming pool has a standard pool (50mx2 1m) with eight lanes of about 1620m2 and a training pool (30mx 16m) with four lanes of about 756m2. Shower room, equipment room, bar, sporting goods supermarket and other supporting facilities cover an area of about 700㎡. The total area is about 3000m2.

Distribution area of comprehensive fitness center: bicycle room, dance exercise room, equipment area, fighting area (Sanda, Taekwondo), aerobic training area and college students' physical fitness test room. The total area is about 1500m2.

Table tennis hall: there are 10 table tennis courts, each with a length of not less than 14m and a width of not less than 7m, about 1 500m2.

Badminton Hall: The total construction area is about1600m2. Including 10 badminton court, on this basis, an activity basketball court is added to cross the badminton court.