Current location - Health Preservation Learning Network - Fitness coach - Brief introduction of swimming pool of Kunshan Sports Center
Brief introduction of swimming pool of Kunshan Sports Center
Kunshan Swimming Pool started construction in 2009. The project was designed by Wei Dunshan, an academician of China Academy of Engineering. It covers an area of 72 mu with a total construction area of 28,634 square meters. The total investment of the project is nearly 380 million yuan, which is mainly composed of swimming pool and tennis court. The swimming pool is equipped with a 25× 25m indoor diving pool in the north, a 50× 25m competition pool in the south and a 50× 13.5 training hot pool in the middle. The tennis court is mainly composed of an indoor tennis court, a badminton court and an outdoor tennis court (five professional training venues). The indoor tennis court has an openable roof, which is the first building with an openable roof in Kunshan. The swimming pool has the most advanced water treatment system in the industry. In winter, the water temperature is controlled at 26-28℃, and Suzhou is the best swimming pool water quality. The whole stadium is avantgarde in design, exquisite in conception and complete in function. It is a first-class modern stadium that can not only undertake international and domestic large-scale swimming and diving competitions, but also undertake the training tasks of professional athletes to meet the needs of swimming and tennis enthusiasts.

At 9: 00 a.m. on February 3 12, the opening ceremony of the swimming pool of the Sports Center was held. The museum has 65,438+0,200 seats, 3 swimming pools (including diving pool, competition pool and warm-up pool), 8 tennis courts and 30 table tennis and badminton training grounds. It can not only undertake swimming, diving, flower swimming, water polo, tennis and other international individual competitions, but also meet the multi-functional and all-weather national fitness needs.