Current location - Health Preservation Learning Network - Fitness coach - How to write a design entrustment contract
How to write a design entrustment contract
How to write the design entrustment contract format? Let's have a look.

Design entrustment contract format: 1, basic information of both parties' identities; 2. Overview of the design project; 3. Project design time; 4. Design fee settlement and payment method; 5. Rights and obligations to be performed by both parties; 6. Liability for breach of contract; 7. Dispute settlement; 8. Signature of both parties and effective time.

Model design entrustment contract format 1

Party A:

Party B:

According to the Contract Law of People's Republic of China (PRC) and relevant laws and regulations, Party B accepts the entrustment of Party A to design an electronic business card for _ _ _ _ _ _ _.

I. Entrust Project: _ _ _ _ _ _ _

Second, the project design time

This agreement shall come into effect as of the date when Party B receives the design advance payment paid by Party A.. After this agreement comes into effect,

Third, the cost settlement

1. The design fee of this project is RMB Yuan only; The design advance payment is RMB Yuan only, in words.

2. When Party A confirms the final design draft and Party B submits the designed vector electronic document to Party A, Party A shall pay the remaining expenses of RMB _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Fourth, the form of submitting works.

After Party A determines and pays all design fees, Party B shall submit five electronic design documents and five electronic business cards to Party A..

Verb (abbreviation of verb) Rights and obligations of both parties.

1. Party A promises that the information required by Party A in this agreement conforms to national laws and social interests.

2. Party A and Party B shall designate a special person to be responsible for the liaison and coordination of the electronic business card design. After the Contract comes into effect, Party A shall provide Party B with background information related to the design of the electronic business card.

3. Party B shall submit the first draft of logo design to Party A within the specified time.

4. After receiving the first draft of Party B's design, Party A shall promptly feedback the modification opinions to Party B, and Party B shall make timely adjustments and modifications after receiving the opinions.

5. After Party A confirms the design draft, Party B submits a vector electronic document to Party A; Meanwhile, Party A shall pay the remaining design fee to Party B. ..

Agreement on intellectual property rights of intransitive verbs

1. Party B enjoys the copyright of the design works. Party B shall transfer the copyright of the work to Party A after Party A has settled all the expenses of the commissioned design (a copyright transfer agreement shall be signed separately); However, Party B has the right of signature, and reserves the right to participate in the exhibition, selection and display.

2. Before Party A pays all the commissioned design fees, the copyright of the works belongs to Party B, and Party A has no rights to the works. After Party A pays all the design fees, Party B shall not give this design scheme to any third party for use.

3. If Party A uses or modifies the works designed by Party B without authorization before paying the balance, Party B has the right to pursue its legal responsibility according to the Copyright Law of People's Republic of China (PRC).

Seven. responsibility for breach of contract

This Agreement may be dissolved under the following circumstances:

(1) Since the signing of the agreement, Party B has started the design work. If Party A proposes to terminate the agreement, the design deposit paid by Party A to Party B will not be refunded; If Party B proposes to terminate,

After the termination of this contract, the design deposit paid by Party A to Party B shall be refunded by Party B. ..

(2) Within the time after the first draft of design submitted by Party B to Party A is approved by Party A, Party B has started the design and production of printing application in an all-round way. If Party A proposes to terminate the agreement, Party A shall pay Party B the full design fee.

Eight. Dispute mediation

All disputes related to this Agreement arising from the conclusion, interpretation and performance of this Agreement shall be settled by both parties through friendly negotiation. If the parties are unwilling to settle the dispute through consultation or negotiation fails, they may submit it to the court where the parties have their domicile.

This agreement is made in duplicate, one for each party, with the same legal effect, and shall come into force after being signed and sealed by both parties. (For matters not covered in the contract, both parties shall negotiate on the principle of friendship).

Party A: Party B:

Time: time:

Model essay on design entrustment contract format II

Party A: _ _ _ _ _ _ _

Party B: _ _ _ _ _ _

Through friendly negotiation between Party A and Party B, Party A invites Party B to entrust design and Party B provides relevant services, and the following terms and conditions are signed:

I. Rights and responsibilities of Party A

1. Before signing this agreement, Party A shall carefully read and recognize Party B's charging standards and terms of service.

2. Party A shall provide Party B with relevant design information, including material requirements, color requirements, layout requirements and cost requirements.

3. Party A is responsible for providing Party B with the necessary conditions for on-site survey and coordinating Party B's survey work. Party A is responsible for providing the original drawings of circuits and waterways related to the house and relevant management regulations of the property.

4. Party A has the right to participate in the supervision of the design process and actively cooperate with Party B to answer questions in the design process.

5. If Party A modifies or replaces the design contents, materials and dimensions without notifying Party B, Party A shall be responsible for the consequences.

Two. Rights and responsibilities of Party B

1. Party B accepts the invitation of Party A, actively cooperates with Party A, and earnestly provides design services for Party A. ..

2. Party B shall carry out thoughtful design in strict accordance with Party A's requirements and abide by the management regulations related to the property.

3. The drawings drawn by Party B must be bound into volumes, with clear drawings and detailed data, and the drawing specifications shall be strictly implemented.

4. Party B's drawings must be approved by Party A before they can be used, and Party B has the responsibility to supervise the design contents during the construction.

5. Without Party A's permission, Party B shall not modify the design contents.

Three. Matters not covered in this agreement shall be settled by both parties through consultation; If negotiation fails, it shall be submitted to the relevant departments for arbitration.

Four. This agreement is made in duplicate, each party holds one copy, which has the same legal effect.

Party A (seal): _ _ _ _ Party B (seal): _ _ _ _ _ _

Representative (signature): _ _ _ _ _ Representative (signature): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Representative (signature)

Attachment: Design charging standard and service terms

A, ordinary residential:

1.60 yuan/m2 (usable area) (including later parts selection and main material recommendation).

2.45 yuan/square meter (usable area) (including parts selection and later main material recommendation).

3. Duplex structure: 70 yuan/m2. (usable area) (including the selection of accessories in the later period and the recommendation of main materials).

4.60 Yuan/m2 (usable area) (including parts selection and later main material recommendation).

5. Villa residence: 80 yuan /m2 (usable area) (including later accessories selection and main material recommendation).

6.70 Yuan/m2 (usable area) (including parts selection and later main material recommendation).

7. Design of real estate model room: 300 yuan /m2 (giving away poster layout).

8. Sales office design: indoor 200 yuan /m2, architectural design 37,000 yuan.

9. Decoration design of small-scale projects: 6% of the total project cost.

Second, the design workflow:

1. After Party A and Party B sign the entrustment design agreement and pay 40% of the design deposit, Party B appoints designers to inspect the site and communicate the design style with Party A..

2. Party B shall design and draw according to the measurement size and style orientation of Party A. ..

3. After the first draft of the design is completed, Party B communicates with Party A again to modify the design scheme.

4. According to the opinions and requirements of Party A, Party B will modify the drawings and communicate with Party B again. If there is any objection, Party B will continue to modify it.

5. After Party A approves the design scheme, Party B is required to draw all the drawings and pay 40% of the temporary design fee.

6. Party B draws all drawings and submits them to Party A at one time, and Party A pays the remaining 20% of the design fee.

7. Choose the construction team recommended by our company. After the design is completed, Party A and Party B sign a construction agreement, and all the design deposits paid by Party A are transferred to the project funds.

8. During the construction period of Party A, Party B shall provide the service of parts selection and main material recommendation.

Design entrustment contract format 3 model essay

Party A:

Party B:

According to the Economic Contract Law of the People's Republic of China, according to the architectural features and overall project cost of this project, combined with the local consumption level, Party A's design requirements and investment situation, Party A entrusts Party B to design indoor and outdoor decoration projects. Through friendly negotiation, the following terms are reached:

Chapter I Overview of the Project

Article 1 Project name:

Article 2 Project Location:

Article 3 Project scale:

Article 4 The total investment of the project:

Chapter II Design Scope

Article 5 The plane process design of the project: namely, the integrated design of the process function layout of the project.

Article 6 The basic graphic design of the project includes the design of fitness area, men's and women's bathing area and swimming pool area.

Article 7 renderings of indoor decoration works of the project: including some renderings of corridors, men's bath areas, women's bath areas and fitness areas.

Article 8 The construction drawing of the interior decoration project of this project: including plane, top surface, elevation, section and details of decorative nodes.

Chapter III Design Contents

Article 9 Plane Process Design

Party A shall provide the original plan corresponding to the project, and Party B shall provide the plan within the design scope on time as agreed.

Article 10 renderings design stage: Party B shall provide renderings of corridors, men's bath areas, women's bath areas, fitness areas and other parts within the design scope.

Article 11 Construction drawing stage: Party B shall provide the design scheme of the renderings, and after being approved by Party A, Party B shall design all the construction drawings, that is, the relevant plane, elevation, top surface and section drawings within the design scope, including detailed drawings. Construction drawing A2A3.

Chapter IV Design Period

Article 13 The plane flow design of this project shall be completed from the date of signing the contract.

Article 14 Rendering design: The plane flow design shall be completed on the day approved by Party A..

Article 15 Construction drawing design: The plane flow design of the project will be completed in stages according to the construction progress on the second day after confirmation.

Chapter V Design Fees and Payment Methods

Article 16 Design fee: The total design fee is RMB10,000 yuan.

Article 17 Payment method:

Party A shall pay Party B 30% of the total design fee, RMB10,000.00 Yuan, within three days from the signing date of this contract. The plane flow design and renderings shall be delivered to Party A, and Party A shall pay Party B 50% of the total design fee and RMB. After the construction drawing design, elevation and top plan are completed and the detailed drawings are delivered to Party A, Party A shall pay Party B 20% of the total design fee, totaling RMB 10000.

Chapter VI Responsibilities of Both Parties

Article 18 Party A's responsibilities

(1) Party A shall submit relevant original materials and documents to Party B in time, give a written explanation of the design requirements, and be responsible for its completeness, correctness and timeliness.

(2) If Party A changes the entrusted design project, scale and conditions, or the submitted materials are wrong, or the submitted materials are greatly modified, it shall obtain Party B's consent in advance. If Party B's design needs to be reworked due to design changes, both parties shall sign a supplementary contract through consultation, specifying the relevant terms, and Party A shall pay Party B the rework fee according to the workload consumed by Party B. ..

(3) During the performance of the contract, if Party A unilaterally proposes to terminate the contract, Party B will not refund the deposit paid by Party A before starting the design work; If the design work has been started, if it is less than half, Party A shall pay half of the design fee for this stage according to the actual workload completed by Party B; More than half of them will be paid in full according to the design fee at this stage.

(4) Party A shall pay the design fee to Party B according to the amount and time specified in Article 2 of this contract, and shall bear 0.2% of the overdue payment for each day. If the delay exceeds 30 days, Party B has the right to suspend the next stage of work and notify Party A in writing. If the design documents are not approved by Party A's superior or the construction of this contract is suspended, Party A shall pay the design fee payable.

(5) When Party A requires Party B to submit the design documents stipulated in the contract in advance, Party A shall pay the rush fee.

(VI) Party A shall provide convenient conditions such as working life and transportation for the personnel sent by Party B to the site.

(VII) Party A shall protect the design copyright of Party B. Without Party B's consent, the design documents delivered by Party A to Party B shall not be copied, transferred to a third party or used for projects other than this contract. In case of the above situation, Party B has the right to claim compensation.

(VIII) After receiving the scheme design submitted by Party B, Party A shall review it in time and give a written reply within 7 days.

Otherwise, Party B can be regarded as the consent of Party A..

Article 19 Responsibility of Party B

(1) Party B must provide design drawings and documents to Party A on time, with good quality and quantity in accordance with the provisions of this contract. If the delivery time of design documents stipulated in this contract is delayed due to Party B's own reasons, only two thousandths of the design fee receivable for this project will be reduced for each day of delay.

(2) Party B shall be responsible for design disclosure and assist in solving construction technical problems. On the premise of not affecting the total project cost and design cycle, Party B shall do its best to meet the design change requirements of Party A.. If there are any major problems, both parties should solve them through consultation.

(3) In the process of construction, if the original design conflicts with the construction or the original design cannot be realized, Party B shall provide a reasonable design scheme with the consent of Party A. ..

(4) Party B is responsible for modifying or supplementing the omissions or errors in the design documents. If the engineering quality accident loss is caused by Party B's design error, Party B shall, in addition to taking remedial measures, waive the design fee for the lost part, and pay compensation to Party A according to the degree of loss, which is at most equivalent to the exempted design fee.

(V) After the contract comes into effect, if Party B unilaterally proposes to terminate the contract, Party B shall return the down payment design fee in full and compensate Party A for the losses according to relevant regulations.

(VI) After delivering the design documents, Party B shall attend the design review meeting of relevant departments and be responsible for necessary adjustments and supplements within the original plan according to the review conclusions.

(VII) Party B shall not disseminate or transfer technical and economic data such as product drawings submitted by Party A to a third party. In case of the above situation, Party A has the right to claim compensation.

(VIII) Party B shall provide detailed engineering data and drawings to Party A, and explain the design requirements in writing.

Chapter VIII Settlement of Disputes

Article 29 The conclusion, validity, interpretation, execution and dispute settlement of this Contract shall be governed by the laws of People's Republic of China (PRC).

Article 30 All disputes arising from the execution of this contract shall be settled by both parties through friendly negotiation. If negotiation fails, both parties may apply to the Arbitration Commission for arbitration according to this contract. Both parties may bring a lawsuit to the people's court where they are located. Both parties may bring a lawsuit to the local people's court, and the legal costs shall be borne by the losing party.

Article 31 During the arbitration, both parties shall continue to perform other terms of this contract except for disputed matters.

Chapter IX Entry into Force of Contract and Others

Article 32 When Party A requests Party B to send a special person to the site for a long time to help solve related problems, both parties shall sign a technical consulting service contract or a construction entrustment management contract separately.

Article 33 The national or local standard drawings used by Party B for this contract project shall be purchased by Party A from the relevant publishing department at its own expense.

Article 34 In this contract project, if Party A needs Party B's designers to cooperate in processing and ordering decorative materials and equipment, the required expenses shall be borne by Party A. ..

Article 35 This contract and its annexes shall come into effect immediately after being sealed by both parties and signed by their legal representatives or authorized representatives. The design drawings shall come into effect after being sealed by both parties.

Article 36 This contract shall come into effect immediately after being sealed and signed by both parties. After the design work is completed, the project is qualified after completion and acceptance, and the design fee is settled, this contract will become invalid.

Article 37 This contract (including annexes and supplementary contracts) is made in duplicate, with each party holding one copy, which has the same legal effect.

Client (Party A): Trustee (Party B):

Company: Company:

On behalf of:

Telephone:

Date:

The above is what Bian Xiao shared today, and I hope it will help everyone.