The latest route map of Wuhan Metro 12 line is the first loop subway in Wuhan. The total length of Wuhan Rail Transit 12 line is 59.9 kilometers, which is divided into Wuchang section and Jiangbei section, of which the total length of Jiangbei section is 37.9 kilometers, with 23 stations.
Seats. The total length of single track of No.3 Bid Section of Wuhan Metro 12 Line is 2.0 16 km. The construction contents include the reconstruction works of Hangang Station, Shuangdun Station, Luojiacun Station to Lingwu Village Station, Qingling Station to Luojiacun Station and Wuchang Section.
The underground continuous wall of Shuangdun Station in this construction is 54.5m deep,1.2m thick and 5m wide. In order to ensure the smooth completion of the underground continuous wall construction, the project department constantly optimizes the construction organization and designs the special construction scheme, meticulously organizes, carefully plans, rationally arranges, optimizes the resource allocation, refines the safeguard measures, pays close attention to the process control, strictly implements the on-site succession and the standby system of technical management personnel, and organizes all construction personnel to make preliminary preparations from the aspects of personnel deployment and overall planning of materials and machinery. Quickly complete site hardening, temporary facilities construction, pipeline relocation, scheme approval, etc., and before slotting construction, the project engineering department and the safety and quality department are responsible for the safety technical disclosure of the underground diaphragm wall construction team again, laying a solid foundation for the smooth slotting of the first underground diaphragm wall.
The completion of grooving the first diaphragm wall has accumulated experience for the subsequent large-scale construction and standardization of diaphragm wall, laid a solid foundation for deep foundation pit excavation, and greatly inspired the confidence of all employees involved in the project.
It is reported that the Wuhan Metro 12 line will bypass the three towns, cross the Yangtze River and cross the Han River, which is also the first and only independent loop line. It will further alleviate traffic congestion, support the development of urban functions, optimize urban layout, and effectively enhance the comprehensive carrying capacity of the city.
Site details Changgang Road Station (transfer to No.2, 13, Hankou Railway Station North Square predicts that the underground passage will connect with Xiaohan Intercity Railway)
Changfeng Station (No.7, 13 transfer)
Huaihai Road Station (transfer to Line 7)
Shuangdun Station (transfer to No.3 14)
Pacific station (transfer to 1 and 14)
Hanyang Avenue Shilipu Station (transfer to Line 4)
Sixin Station (transfer 10)
International Expo Center Station (transfer to No.6 1 1 16)
Qingling Station (transfer to Line 5)
Nanhu Avenue Station (transfer to Line 7)
Wuchang Railway Station (transfer to No.7 No.4 Road 1 1)
No.15 Middle Station (transfer 13)
Xiaoguishan Station (transfer to Line 2)
Wangjiadun Station (transfer to Line 8)
Yuanlin Road Station (transfer to Line 4)
Governor Garden Station (transfer 10)
Popular Science Park Station (transfer to Line 5)
Danshuichi Station (transfer to 1)
Baibuting Station (transfer 14)
Xingye Road Station (transfer to Line 3)
National Fitness Center Station (transfer to No.8, 2 1)
Shiqiao Road Station (transfer to Line 6)
Article source: Changjiang Cloud