1. design planning
Before installing the central air conditioning system, detailed design planning is needed. This includes analyzing the structure and use of the building, considering the capacity of air conditioning system, cooling/heating requirements, air circulation and other factors. According to the design scheme, determine the location of air conditioning system, pipeline installation location, air handling equipment, etc. And the control system and monitoring equipment of the system.
2. Pipeline installation
After determining the location of the air conditioning system, it is necessary to install the pipes. This includes the laying of pipelines, the installation of supports, the connection and fixation of pipelines, etc. It is required that the pipeline should be installed firmly and connected closely, meeting the safety standards.
3. Installation of air conditioning equipment
Installing air conditioning equipment is an important step in the installation of central air conditioning system. This includes the installation of cooling equipment, heat exchangers, air handling equipment, etc. When setting the location of equipment, it is necessary to consider the size and weight of air conditioning equipment to ensure that the supporting structure of the equipment is firm and safe.
4. Installation of air handling system
Installing air handling system is another important step in the installation of central air conditioning system. This includes filters, humidifiers, dehumidifiers, air volume regulators, exhaust fans, etc. The installation of air treatment system needs to consider the requirements of pipeline connection, control system debugging and air circulation.
5. Installation of contact and control equipment
After the central air conditioning system is installed, the control equipment needs to be installed and debugged. This includes installing temperature sensors, humidity sensors, air pressure sensors, controllers, etc. And system control and monitoring equipment.
abstract
The installation of central air conditioning system is a complex project, which needs to consider the characteristics of the building and the performance requirements of the system. Before installation, detailed design planning is required, considering system capacity, location and connection mode of pipelines and equipment, air handling system and control equipment. During the installation process, the relevant safety standards should be strictly observed to ensure the safe and stable operation of the system.