Current location - Health Preservation Learning Network - Fitness coach - Rectification notice
Rectification notice
In life, more and more people contact and use notices, and various types of notices have different writing methods. I believe many people will find it difficult to write a notice. The following is the rectification notice I collected. Welcome to share.

Rectification notice 1xxxxx property management co., ltd.:

After your company moved into this community in 200x, burglary cases occurred frequently in the community. The owners of residential quarters have a strong demand for strengthening safety precautions and improving the quality level of property service management in residential quarters.

After discussion by the owners' meeting, it is decided to ask your company to rectify the following residential property management problems.

The contents to be rectified are as follows:

I. Safety management issues

1. The fence of the residential area is low, which needs to be properly raised to ensure the basic personal and property safety of the owners of the residential area.

2. The responsibility for community safety is unclear, the process is unclear, and the management of personnel and vehicles is chaotic. Security guards leave their posts without authorization, doze off from time to time and chat with idle people.

Entry and exit personnel are not registered, and outsiders do not ask, which seriously affects the security and image of the community. It is urgent to strengthen post responsibility education and standardize process management.

3. The setting of the sentry box is unreasonable and there are many blind spots. It is suggested to add a sentry box between the three and four buildings in this community and provide a doorman at night.

4. Security intercom equipment and night patrol tools are insufficient. Security communication and night patrol tools need to be strengthened.

5. It is necessary to shorten the night patrol interval of community security and strengthen the night vehicle safety patrol. Foreign vehicles entering the community at night need to be registered and tracked.

6. To ensure that the doorbell at the bottom of each building in the community works normally, it will be closed uniformly after 6 pm.

Second, other issues.

1. The security guards in the community are not dressed neatly and behave in a dignified manner. It is necessary to strengthen the management of dress and etiquette norms for security personnel.

2. The standby generator in the community fails to run in time during the power outage, so it is necessary to ensure that the self-provided generator in the community can work normally during the power outage.

3. There are many dead ends of garbage, and the problem of littering affects the community environment. It is necessary to clean up the garbage in the community in time and remove the garbage and sundries piled up at will.

Small advertisements can be seen everywhere in the community, which seriously affects the beauty of the community. It is necessary to strengthen the inspection work of cleaning staff and remove small advertisements in time.

The above contents that need to be rectified require your company to complete the rectification before xx. At that time, members of the community industry Committee will accept rectification on behalf of all community owners.

I hereby inform you.

Xxx owners Committee

20xx x month xx day

Rectification notice 2 3/kloc-0 3 dormitory members:

Du xx and Zhang XX checked on August 1 day and found that there was a gas barrel in the dormitory. Please dispose of the gas barrel before August 3, and no gas barrel shall be left in the dormitory. If you don't make rectification within the time limit, you will be fined 5000 yuan and your accommodation qualification will be cancelled! Please cooperate, thank you!

Administration Department of xx Electromechanical Technology Co., Ltd.

August 2008 1

3. Notice of household rectification:

According to the State Council Economic Construction [20xx] No.258 Administrative Measures for Affordable Housing and other relevant laws and regulations, affordable housing shall not be sold, leased, left vacant, lent, altered, decorated or illegally built.

After investigation and verification by our property service center, your affordable housing in BuildingNo. exists illegal use. Jindong Ruiyuan Community. Please stop the violation immediately after receiving this notice, complete the rectification within 10 days, and bring your identity certificate, violation description and other materials to the residential property service center for review and registration. Otherwise, we will deal with it in accordance with relevant regulations and investigate its corresponding responsibilities. Hereby inform!

Property Service Center Tel:18113174702.

Year, month, year, 20XX

Rectification notice 4 to:

Upon inspection, it is found that the following potential safety hazards exist in the construction site:

The actual quantity of materials (inflammable and explosive dangerous goods) that your company entered the site on, month and day exceeded the planned quantity of construction organization design materials, which violated the provisions of Article 6.2.2 of Technical Code for Fire Safety on Construction Sites of Building Engineering (GB50720-XXX 1).

Your company is required to immediately recover some materials that exceed the planned entry quantity, and submit an application for reinspection to our company with a notice of rectification of potential safety hazards before X, X, X. During the rectification, your company must take fire safety protection measures for the storage parts in accordance with the Technical Specification for Fire Safety of Building Construction Sites, and it is forbidden to carry out hot work around this batch of storage parts.

If you fail to carry out the rectification work within the time limit and apply for reinspection, our company will punish you accordingly according to the terms of the contract.

Project Supervision Organization (Seal)

Chief Supervision Engineer (signature):

date month year

Signed by:

Date of receipt:

Rectification Notice 5 Dear Sir,

During the renovation of Room 220 1 Block B of Zone B1Building of Z Garden,

1) without the approval of the relevant government departments, sliding doors were installed between the sunken flower pond and the viewing balcony, which changed the use function and facade of the balcony;

2) Not equipped with enough fire extinguishers as required;

3) The indoor decorative board is not fireproof;

4) Decorative materials are thrown away;

5) Overtime construction;

6) The decoration construction permit has expired;

7) During the construction period, the decoration inspector seriously failed to cooperate with the decoration inspection;

8) After our company sent a rectification notice to your business owner, your business owner not only refused to rectify, but also carried out other types of construction. The above projects have seriously violated the relevant provisions in the Administrative Measures for Interior Decoration of Residential Buildings, Guangdong Property Management Regulations, Early Property Management Service Agreement, Temporary Owners Convention and Customer Decoration Manual. Please ask your business owner to do this within 2 days (that is, by 20x 1), otherwise the service center will take further measures according to relevant laws and regulations (such as ordering to stop work, detaining or confiscating tools, etc.). ) to ensure the unified appearance and safe use of the building.

Z garden customer service center

Xx,xx,XX,XX

6 * * * notice of rectification of limited liability company:

Our bureau recently conducted an on-site inspection of the two securities business departments of your company, Jingsi Road and Luoyuan Street in Jinan. The problems found in the inspection and the rectification requirements are hereby notified as follows:

First, the problems existing in the business department

1. The internal control system of the business department is not perfect, and some of the systems currently implemented are still those of the former Huaxia Securities Co., Ltd.;

2. Some customers have incomplete account opening information, and there are cases where one person opens multiple fund accounts, and one fund account corresponds to multiple stock accounts;

3. The agreement signed with the bank on the deposit and management of the customer transaction settlement fund account is incomplete;

4. The records in the liquidation log of the business department are incoherent and incomplete, and there is no signature of the liquidator;

5. By querying the counter system, it is found that Yantai and Zibo business departments still have customer overdraft authority, and Jinan Luoyuan Street business department has customer overdraft;

6. Some institutional customers have no corresponding agent information for withdrawals, and some customers have not been approved for withdrawals above the quota. The approval form for large-sum withdrawal of Stone Business Department is not standardized, and there is only a running account;

7. Jinan Jingsi Road Sales Department handles the compulsory withdrawal business for individual customers, and there is no relevant approval procedure;

8. There are some hidden risks in the distribution and use of authority in business departments: the system administrator in computer department has some business authority; Super user has a password at the same time; High-risk business rights, such as shareholder code transfer, can only be used with the signature of the trading department manager, and some securities have no corresponding approval procedures; The personnel did not adjust the teller's permission setting in time after adjusting their posts; The account opening post and the fund post are essentially single posts; Liquidators also serve as financial personnel, etc.

9. There is a bank-securities business that has not been approved by the China Securities Regulatory Commission;

10, the business department is faced with a large number of job-transfer personnel, which is not conducive to the stability of employees.

Second, the rectification requirements

In view of the above problems, your company must urge the two sales departments in Jinan to make the following rectification:

1, further improve the internal control system, standardize the business operation process, and urge the business departments to strictly implement it;

2. Further strengthen the cleaning of account data;

3. Sign the deposit agreement of customer transaction settlement fund account with relevant banks as soon as possible;

4. Further sort out the authority configuration and use of business departments to plug risk loopholes; Immediately cancel the overdraft right of customers and strictly implement the examination and approval system of restricted right;

5. Supervise the business department to suspend the business of Yinzhengtong, and make plans to gradually clean up;

6. Properly handle the job-hopping problem of a large number of employees, avoid unstable factors, and make plans to deal with risks.

Your company must submit the rectification report to our bureau before April 15, 2005, and our bureau will review the rectification of the above two business departments at an appropriate time.

This inspection is a routine on-site inspection, and the above conclusions do not represent our substantive judgment on other situations of your two securities business departments in Jinan. If there are other violations of laws and regulations in the above two business departments, they shall not be exempted from their legal responsibilities on the grounds that they were not found in this inspection.

On March 29th, * * *.

7 xx merchant rectification notice

When we checked in XX, we found that your store was closed. Please rectify immediately after receiving this letter and open the store in strict accordance with the business hours of this pedestrian street. If it refuses to rectify, it will take further measures in accordance with the lease contract and the relevant provisions of the "Pedestrian Street Management Convention" of XX Pedestrian Street, and reserve the right to pursue relevant legal responsibilities.

Hereby inform!

Dongguan xx property service co., ltd

Property Management Center

Date: XX, XX, XX, XX

Notice of rectification: Building 8 xx, big package team:

The law enforcement inspection team organized by the Housing and Urban-Rural Development Bureau of xx conducted a comprehensive inspection on the safety and quality of our project department. Upon inspection, the ` 5# building project undertaken by your team has the following problems, so it must be rectified immediately before xx, xx, XX, or it will be shut down and financially punished according to relevant regulations.

The main problems are:

Template:

1, the formwork support system has no sweeping rod;

2. The stair tread template is not supported by three door leaves;

3. The formwork support system is integrated on an outer frame;

4, template flat-fell seam is not tight.

5, stair step ripping too early.

Steel bar:

1, the key parts of steel binding are not strictly controlled;

2. The thickness of protective layer is uneven, and there are too few protective layer pads.

Concrete:

1, elevation control is out of control;

2. The concrete surface of the cast-in-place slab and the stair tread are uneven;

3. Serious slurry leakage and great waste.

Issued by:

Signed by:

After inspection, the rectification notice 9 found the following safety hazards in the construction site:

Cause: On April 6th, 20xx, you and xxx factory were already setting up the second floor formwork support; The supporting height is 5.5m, which belongs to the high supporting system. Our inspection found that the erection of high formwork did not conform to the special construction plan, and the high formwork erected on site had great security risks. Our company has repeatedly urged the construction site management personnel of your company to intensify inspection and rectification according to the relevant technical requirements of the special plan for delayed commencement. Up to now, your company has not implemented the rectification measures required by our company, but continues to let workers carry out the erection process of high formwork.

Considering the importance of the problem, our company solemnly asks you: after receiving the notice, your company must organize personnel to rework and reinforce according to the relevant requirements, and then inform our company to organize personnel to conduct preliminary inspection. Only after passing the inspection can we enter the next construction process.

If your company insists on continuing the construction without rectification, we will not accept high formwork and notify the personnel of the district safety supervision station to intervene. Our company will not bear the relevant losses and responsibilities caused during this period.

Hee hee! After receiving the notice, the construction unit will carry out relevant rectification, and strengthen the construction site management, personnel management and technical level learning to improve the sense of responsibility of managers!

The rectification shall be completed before April 12, 20xx, and an application for rectification review shall be submitted to our unit.

Xxxx bureau

20xx year x month x day

Rectification Notice 10 Fujian Yongrun Construction Engineering Co., Ltd.:

Judging from this month's assessment and daily inspection records, the daily cleaning is generally good, but there are still many places where health loopholes often appear. The following rectification contents are put forward, please rectify them.

1, around the entrance building, parking lot, leisure fitness square, flower beds, kerbs and pavement soil along the main park of children's playground should be cleaned immediately.

2. In the temporary lounge next to the entrance building, the accumulated garbage should be removed in time to keep the ground clean.

3. Other non-garbage objects such as pebbles, bricks, wooden bamboo poles and other residues on the roadside and the green belt in the trusteeship area should be cleaned up in time.

4, leisure fitness square and children's playground on both sides of the main garden road to use tools to make mud sedimentation tank, and regularly clean the sedimentation tank, to prevent soil pollution when watering the greenway.

5. The tool room will be delivered soon. Please configure all kinds of tools, vehicles and articles according to the contract.

6. In order to improve the cleaning quality and efficiency, and establish the image of the cleaning team in the West Lake area of the park, the cleaning staff are required to be equipped with a cleaning car, and the corresponding tools are stored in the cleaning car in a unified way to avoid wasting manpower and time in fetching tools back and forth.

Please implement the above rectification immediately, and conduct a month-end assessment in combination with this rectification.

Hereby inform!

Zhangzhou chengtou property management co., ltd

20xx65438+1October 65438+July

Notice of rectification 1 1 Notice of rectification of potential safety hazards on the construction site:

Team Xx:

The General Project Department of Deep Installation conducted a safety inspection on the scaffolding set up by your team in Xx year, X month, X day, and pointed out that the steel pipe stud sleepers did not meet the safety specifications, and there were potential safety hazards, which must be rectified immediately.

Your team is now informed to make rectification before 15: 00 pm on the day of notification. After the rectification is completed, the construction party (xx) rechecks that it meets the specifications and can continue the construction.

Otherwise, the project department will punish according to the safety production regulations, and your team will bear the responsibility of reorganizing all forces for rectification.

Hereby inform you

Xx construction and installation engineering co., ltd. xx scaffold engineering management office

issuer

Rectification Notice 12 Shi Qi Town, Panyu District, Guangzhou: Your unit started construction without the approval of the competent department of urban planning administration, which violated the provisions of Article 40 of the Urban and Rural Planning Law of People's Republic of China (PRC). This construction project is illegal. According to the provisions of Article 65 of People's Republic of China (PRC) Urban and Rural Planning Law, your unit is limited to demolishing illegal buildings by itself within days after receiving this notice. If it is not removed within the time limit, our town government will organize forces to forcibly remove the illegal construction according to law, and all economic losses and legal responsibilities arising therefrom will be borne by you.

Hereby inform!

Shipper:

Payee: People's Government of Shi Qi Town, Panyu District, Guangzhou.

Notice of Demolition within a Time Limit 20 1 MM DD YY

Rectification notice 13 rectification notice

Family:

According to the State Council Economic Construction [20xx] No.258 Administrative Measures for Affordable Housing and other relevant laws and regulations, affordable housing shall not be sold, leased, left vacant, lent, altered, decorated or illegally built.

After investigation and verification by our property service center, your affordable housing in BuildingNo. exists illegal use. Jindong Ruiyuan Community. Please stop the violation immediately after receiving this notice, complete the rectification within 10 days, and bring your identity certificate, violation description and other materials to the residential property service center for review and registration. Otherwise, we will deal with it in accordance with relevant regulations and investigate its corresponding responsibilities. Hereby inform!

Tel:18113174702, XX.

Receive a rectification notice

Residents of building one. I have signed the rectification notice issued by the property service center on xx, xx, XX, and I know all the contents of the rectification notice.

Signed by:

Contact telephone number:

Xx, xx, 2000

This rectification notice is made in duplicate, one for the owner and one for the property service center.

Commitment letter for rectification

Jindong Ruiyuan Property Service Center:

I am the lessee of this residential building, and I have clearly known that it is illegal to □ lease, □ lend, □ leave vacant, □ change the use of the house without authorization, □ illegally decorate, □ illegally build and □ others. Now I solemnly promise to stop this illegal behavior immediately, complete the rectification within 10 days from the date of receiving the rectification notice, and accept the audit and registration of the property service center. If the rectification is not completed within the commitment period, I will voluntarily accept the corresponding treatment according to law and bear the corresponding responsibilities.

Commitment:

Contact telephone number:

Xx, xx, 2000

Rectification notice14 _ _ _ _ _ _ _ _ _ _:

According to the Fire Protection Law of People's Republic of China (PRC) and the Fire Protection Regulations of Inner Mongolia Autonomous Region, our property management company sent personnel to supervise and inspect the fire protection work of your unit on October, 20xx, and found the following major fire hazards:

Please correct it before, and inform our property management company of the rectification before the deadline expires. If it is not corrected within the time limit, it will assist the public security fire control unit to deal with it according to law.

During this period, your unit should take measures to ensure fire safety and prevent fire.

Person in charge of the inspected unit of the property company

(signature):

Year, month, sun, moon, sun.

This notice is in duplicate (one for the inspected unit and one for the property management company).

Rectification Notice 15 Andy No.

(saved by the inspected unit)

On, your company's security inspection found the following security risks:

Suggested rectification measures:

Inspection department: person in charge of inspection:

Person in charge of the inspected unit:

Receipt for rectification of safety hazards

Hi, Andy.

(submitted to the inspection department)

The unit was inspected for safety, and the rectification of potential safety hazards is now reported as follows:

Person in charge of rectification unit:

Xxxx,xxxx,xx,xx