Current location - Health Preservation Learning Network - Fitness coach - Liaoning issued a Class II orange warning for severe power shortage! What does the orange warning mean? Attached is the new regulation of Liaoning power rationing order 202 1!
Liaoning issued a Class II orange warning for severe power shortage! What does the orange warning mean? Attached is the new regulation of Liaoning power rationing order 202 1!
Recently, off-peak electricity consumption has occurred in three northeastern provinces, Zhejiang, Shanghai and other places in China, and the power shortage in the three northeastern provinces is the most serious. Now Liaoning has issued a Class II orange warning for serious power shortage.

What happened when Liaoning issued a Grade II orange warning for severe power shortage?

? What does the orange warning mean? Attached is the new regulation of Liaoning power rationing order 202 1!

1. What happened when Liaoning issued a Class II orange warning for severe power shortage?

On September 29th, 20021year, the Ministry of Industry and Information Technology issued the Notice on Implementing Orderly Electricity Use, which showed that Liaoning issued a Class II orange warning for severe power shortage. The Provincial Department of Industry and Information Technology decided to start the implementation of Class II measures for orderly power consumption from 5: 00 to 24: 00 on September 29th. These restrictions are as follows:

1. Power cuts in the whole province in each period: 5: 00-8: 00 2 million kilowatts, 8:00- 13:00 1.24 million kilowatts,13: 00-22: 00 5.38 million kilowatts.

2. According to the requirements of the Notice on Implementing Orderly Electricity Consumption in Electric Melting Magnesium Enterprises, from 202 12:00 on September 27th, the electric melting magnesium kiln of electric melting magnesium enterprises will fully implement orderly electricity consumption and stop producing electricity. The end time of orderly power consumption will be notified separately. Enterprises that start production of fused magnesium kilns without authorization, if the circumstances are serious, shall be ordered to make corrections and stop power supply.

3. On September 29th, the city implemented an orderly power rationing list:

05: 00-08: 0008: 00-13: 0013: 00-22: 0022: 00-24: 00, a total of 200 1245384 17 Shenyang. 8 16 Dandong 8420 13 Jinzhou 2523 13 Yingkou 80 135880 Fuxin 03 138 Liaoyang 1729 18 Panjin9628/kloc.

2. What does the orange warning mean?

The basis of the orange warning of power shortage level II is that the electricity or electricity gap accounts for 10-20% of the current maximum electricity demand. Because according to the orderly power consumption management measures issued by the State Grid, the power consumption early warning signal is divided into four grades, of which red is particularly serious; Orange is serious; Yellow is heavier; Blue is average.

Third, the latest news of the new regulations of Liaoning power rationing order 202 1!

On September 26th, 2002/KLOC-0, the Liaoning Provincial Department of Industry and Information Technology held a conference on electricity security in Shenyang, which indicated that the electricity consumption of the whole society in Liaoning Province reached a record high of1717.97 million kWh from June 5438 to August this year, which could no longer meet the electricity demand of enterprises. Therefore, it is decided that:

1.9 June10-September 22, Liaoning province * * * launched six rounds of class III and three rounds of class IV orderly electricity consumption measures, and the film will limit electricity for some industrial enterprises.

2. From September 23rd to September 25th, Liaoning Province started three rounds of Grade II orderly electricity consumption measures. In some periods, when the maximum error of implementing orderly power consumption measures is 4 1.692 million kilowatts, there is still a power supply gap in the power grid.

3. On September 29th, according to the report of the provincial electric power company at 8: 30, after striving for extra support of tie lines and other dispatching measures, when the orange warning is implemented today, there will be no power outage except for orderly power consumption measures.

Summary: On September 29th, from 5: 00 to 24: 00, the power was limited by stages, but except for orderly power utilization measures, the power was not limited.