Current location - Health Preservation Learning Network - Fitness coach - What are the precautions in the construction of Beilun plastic runway?
What are the precautions in the construction of Beilun plastic runway?
1. After the plastic runway is laid, it will take 7- 10 days to use.

2. The plastic runway is suitable for all-weather operation under certain drainage equipment conditions. Plastic track is used for training, competition, students' stillness and fitness, and is not suitable for other purposes;

3, to prevent the purification of harmful substances, often keep clean, to prevent severe mechanical impact and friction, vehicles are not allowed to run on the runway, stacked heavy objects and sharp objects, etc. (except standard running shoes). Special static shoes must be worn during transportation and startup. The nail length shall not exceed 7mm, and the dancing shoes shall not exceed11mm.. If static shoelaces have spikes, they are not allowed to be used on plastic runways;

4. Prevent temporary load;

5. Prevent fireworks and isolate heat sources, and prevent contact with organic solvents, chemicals, cigarette butts and other kindling and purifying substances.

6, should be washed with water, after cleaning, a large number of residual water on the rubber surface can be removed with dry cloth. Oil stains can be scrubbed with 10% ammonia water or detergent and washing powder.

7. The edge of the plastic runway should be covered, and it is not allowed to tilt at will. If the pavement is damaged or blistered, the construction unit shall be notified in time to repair it.