Chengdu Metro 10 line starts from Taipingyuan Station, passes through Wuhou District, Shuangliu District and Xinjin District, and ends at Xinping Station, heading northeast-southwest The total length of the line is 38.00 kilometers, of which the underground section is about 2 1.352 kilometers, the elevated section and transition section are about 16.650 kilometers, and there are * * stations 16.
Extended data
The second phase of Chengdu Metro 10 line is connected with the tunnel.
The last "tunnel" between Rulin Road Station and Wujin Station of Metro 10 Line Phase II involves 34 hidden dangers, including underpassing the apron of Shuangliu International Airport, underpassing the taxiway from Shuangliu Airport T 1 to T2 Terminal, underpassing municipal tunnels for a long distance and underpassing numerous municipal bridges.
At the same time, it is difficult to face the influence of cross-construction projects such as loose pebble stratum on rail transit construction, and the overall construction difficulty, construction organization and construction period risk are extremely high.
Facing all kinds of challenges, Chengdu Metro Construction Company organizes all parties involved in the construction to plan ahead, strictly control and innovate in technology. After more than a year of construction, the difficulties were broken through one by one, setting a record for shield tunneling in Xinjin County for the first time since the airport and Chengdu subway were first built in China. The "tunnel connection" of the whole line has laid a solid foundation for the "rail connection" and created powerful conditions for the subsequent "electric connection" and "car connection".
Baidu Encyclopedia-Chengdu Metro 10 Line