First of all, the standard plastic runway size
Plastic track, also known as all-weather track and track track, consists of polyurethane prepolymer, mixed polyether, waste tire rubber, EPDM rubber particles or polyurethane particles, pigments, additives and fillers. Plastic track has the characteristics of good flatness, high compressive strength, suitable hardness and elasticity, and stable physical properties, which is beneficial to the development of athletes' speed and skills, effectively improving sports performance and reducing the fall rate. The plastic track is made of polyurethane rubber and other materials, which has certain elasticity and color, ultraviolet resistance and aging resistance. It is internationally recognized as the best all-weather outdoor sports ground material.
The standard plastic track generally refers to the 400 track and field plastic track, with a track radius of 36 meters and 8 lanes.
The length of the first lane is 408 meters.
The length of the third road is 415m.
The fourth lane is 423 meters long.
The fifth lane is 430 meters long.
The sixth lane is 438 meters long.
The seventh lane is 445 meters long.
The eighth ball is 452 meters long.
Second, how to maintain the management standard plastic runway?
1. After the plastic runway is laid, it will take 7- 10 days to use it.
2. The plastic runway is suitable for all-weather operation under certain drainage equipment conditions. Plastic track is used for sports practice, competition and students' static fitness, but not for other purposes;
3, to prevent the purification of harmful substances, often keep clean, to prevent severe mechanical impact and friction, vehicles are not allowed to run on the runway, stacked heavy objects and sharp objects, etc. (except standard running shoes). Special spiked shoes must be worn for sports, with the nail length not exceeding 7 mm and the jumping shoes not exceeding11mm. If spikes have long nails, they are not allowed to be used on plastic runways;
4. Prevent temporary load;
5. Prevent fireworks and isolate heat sources, and prevent contact with organic solvents, chemicals, cigarette butts and other kindling and purifying substances.
6, should often spray cleaning with water, after cleaning, a large number of residual water on the rubber surface can be removed with dry cloth. Oil stains can be scrubbed with 10% ammonia water or detergent and washing powder.
The above example is about the specification of standard plastic runway size and the skills and methods in the maintenance and management process. Therefore, in order to cooperate with some sports events, or to make the score more fair, we need to refer to the standard parameters given by the relevant departments to install and construct plastic runways in some places with high requirements, and at the same time, to ensure the later use instructions, we should also carry out regular maintenance. Please refer to the above for details. These are all valuable information.