The best scheme for home decoration
Seven steps of home decoration

General mobilization of home improvement: the decoration is laborious, and the decoration is slimming and molting. Decoration is a challenge to the physical limit, and decoration is a test of psychological endurance ... Let's first understand the home improvement process before decoration:

First, understand and compare the choice of decoration companies

Organize ideas: coordinate and unify the thoughts and opinions of family members, read more materials and cases, and initially determine the style.

Budget: according to the family's economic situation, initially determine the decoration budget and make it rich. Determine the upper limit of foreseeable basic projects such as decoration and main materials and strictly implement them.

Tip: It is normal for the final accounts to exceed the budget 10%, and it is not new to exceed 30%!

Choice: the contractor is the most tired and the contractor is the most uneasy, or the main materials are purchased by themselves, and the others are handed over to the decoration company!

Choose two ways of the company for reference: A entrust the supervision company to bid;

B go directly to the home improvement market to find a home improvement company;

Tip:

It is customary to go directly to the home improvement market to find a home improvement company, which can intuitively compare the capabilities of home improvement companies and designers; The bidding form of entrusted supervision company has not been generally recognized by the market, and the reputation of supervision company is one aspect. Secondly, the bidding companies are mostly public equipment companies involved in the home improvement market, and there is still a gap between their brand appeal and some home improvement companies. No matter which way you choose, Jia Yi suggested that you should never choose a street decoration team, otherwise problems will emerge one after another.

Second, negotiate and finalize the transformation plan.

Design scheme requirements, sketch drawing, comprehensive communication, on-site measurement, provision of construction and renderings, and preparation of decoration budget.

Tip:

1, most home improvement companies do not charge design fees separately, but the design will follow some rules and form routines.

2. Some companies pay designers. If you want to publicize your personality and have abundant funds, you can ask them to design independently, not only because these designers are generally senior designers, but also to supervise and guide your home improvement. Generally, it costs 2000-3000 yuan, which is still worth it.

Third, sign the renovation contract.

Sign a contract to determine the decoration scheme and materials, determine the project budget, determine the construction period, and sign a contract.

Tip:

1. At this time, the budget provided by the home improvement company is only the foreseeable project budget, while the structural demolition, piping and wiring, gypsum ceiling, lamps and lanterns installation, etc. It needs to be calculated according to the actual measurement after the completion of the stage project, remember!

2. Beware of over-reporting and false reporting of the budget of the home improvement company. It is suggested that the project budget should not be confirmed on site, but should be measured on site and re-examined.

3. Read the contract carefully. If the provisions are not clear, it shall be required to explain on the spot or sign a supplementary agreement.

4. The signed contract shall be unified and standardized by the relevant state departments, and shall be confirmed to be legal and effective after being signed by the local market appraisal or seal.

Four, please or personally supervise the construction.

prepare

1. Check the flatness of the living room-wall, floor and roof, and the water supply and drainage pipes.

2. Electricity and gas flow detection, and make records.

3. Material preparation.

4. Personnel scheduling. Determine the construction personnel and the person in charge of the site.

5. Workshop and site lofting. Show construction drawings and construction production requirements.

Construction process of decoration company

1. Demolition: If it is structural, the procedures should be completed. Disposal: Demolished garbage and waste. Cleaning: cleaning the construction site.

2. Hydropower and coal projects

A. Discharge of hot and cold water pipes and installation of water supply equipment.

B. Power supply, electrical appliances, communication and lighting shall be discharged, the card loading position shall be determined, and the switch socket in the box shall be positioned and installed.

C. installation of gas pipelines and gas appliances.

3. Masonry works A. Bricklaying, partition walls, doors and windows B. Painting C. Installing hangers.

4. Metalworking project A. Installation of aluminum alloy doors and windows and plastic steel doors and windows. B. install anti-theft doors and windows and canopy. C. install the clothes rack.

5. Woodworking project A. Wood products manufacturing: door and window covers, partitions, corner lines, ceiling partitions, kitchen utensils, porches, etc.

B production of soft sleeper furniture (wardrobe, bookcase, TV cabinet, shoe box, etc.). ).

C. Laying floors and skirting lines (boards). D. mosaic assembly of glass products.

6. Decorative engineering wall pasting, top paper (cloth) and soft decoration production.

7. Paint project A. Batch of embedded walls, top putty and paint. B. Wood products are embedded with putty in batches. Painting. C. Paint the floor and skirting line (board). D. flour for brushing latex paint on the top of the wall.

8. Installation works

A. install electrical switches, socket panels and lamps.

B. door locks and doorbells.

C. Sanitary ware three-piece set and hardware accessories (faucet, soap basin, towel rack, paper box, bathtub handrail, mirror glass)

D. range hood, water heater and exhaust fan.

Tip:

1, at different stages of the project, the key is to confirm the materials, on-site supervision of key parts and on-site inspection and acceptance.

2, strictly grasp the progress of the project, choose to buy the main and auxiliary materials in advance, to avoid delays in the construction period.

3, gas, plastic steel, floor and other projects that need to be built by manufacturers should coordinate with the decoration team in advance to determine the detailed plan to avoid problems.

Verb (abbreviation of verb) is accepted and decorated by someone or in person.

Overall acceptance and transformation of space

1. Clean up the site and clean up the decorated rooms one by one.

2. Conduct acceptance according to the acceptance criteria (re-check if rectification is needed).

3. Provide pipeline circuit diagrams and warranty cards for equipment and products.

4. According to the actual decoration engineering quantity summary calculation, invoice.

5. Issue the warranty card of decoration engineering reputation project.

Tip:

Don't just look at the big picture, the corner is the key, especially at the junction of various corners and different materials. If you find a problem at this time, you can solve it immediately, otherwise you will have to wait for after-sales service.

Settlement of intransitive verb expenses

Tip:

1. Carefully review all expenses calculated according to the actual measurement, and review all expenses according to the budget table to avoid double calculation. Pay the decoration company according to the contract.

2. Everyone should consider the warranty period. Most of the decoration money is paid in advance. It is best to settle all expenses after the warranty period.

7. Warranty and payment.

After the decoration service and warranty, settle all expenses with the decoration company.

7. Warranty and payment.

If the decoration company promises after-sales service, it must be noted that it is best to settle all expenses with the decoration company after the warranty.