Current location - Health Preservation Learning Network - Slimming men and women - Brief introduction of Longxianggu project in Guangxi
Brief introduction of Longxianggu project in Guangxi
The project is located in the south of Liangqing District, Nanning, including Tunliu Reservoir and Fengtinghe Reservoir (partially) and surrounding areas, about 60 kilometers away from Nanning, and is now under the jurisdiction of Datang Town and Xiaonan Town in Liangqing District. The total planned area of the project is about 100 square kilometers, and the total investment exceeds100 billion yuan. Initially positioned as an international leisure tourism resort, a low-carbon circular economy development demonstration zone and a pension industry demonstration zone. It is an international eco-cultural tourist city with a population of 300,000 to 500,000. The project is developed and constructed in two phases, with a development period of 20 to 30 years.

Among them, the first phase of the project is located in the east of Longxianggu Project, including Tunliu Reservoir and its surrounding area, which is connected with G325 National Highway and North-South Expressway in the east and Qinbei District of Qinzhou City in the south. The planned area of the first phase is about 40 square kilometers, mainly including the construction of eco-cultural park, water world, natural museum, elegant sports community, amorous feelings town, hotel, planetarium and aquarium. The first startup project-Water World Project will be held in 2008.

The total planned area of Water World Project is about 26 hectares (390 mu). This project is developed and constructed by one-time planning and phased construction. The first phase of the park is about 13 hectare (about 195 mu). The main planning and construction contents include recreation area, SPA and comprehensive service area, in which the recreation area planning includes three sub-functional areas, namely, children's recreation area with children's amusement facilities, surf-chasing recreation area with large-scale interactive performances, and competitive slide area with various novel and exciting slide facilities. The land area to be requisitioned for the project is 1 120.83 mu, and all the work is progressing smoothly. It is estimated that the land requisition for the first phase of the project will be completed before the end of 20 12.