Renovation process of blank house
The decoration process of rough house is for friends who are ready to decorate.

1. Demolition and reconstruction of the wall (2~3 days)

Determine the design scheme, the load-bearing wall must not move, and the sound insulation cotton flue with non-return valves installed in the smoke pipe and sewer pipe must be built with red bricks, otherwise it will easily lead to brick falling in the later stage.

Hydropower positioning ~(0.5 days)

Household appliances such as sockets, toilets and air conditioners. There should be water and electricity positioning, pictures and numbers, and marked on the wall.

Hydroelectric slotting (1~2 days)

The wall surface is slotted, and the load-bearing wall is less than 50 cm, which is used for subsequent installation of water pipes and wires.

Laying of water and electricity pipelines (1~2 days)

Installation of water pipes and wires, shielding treatment at the intersection of strong and weak electricity, circuit layout and point-to-point laying are the best.

Backfill (1 day)

Trench and toilet backfill, be careful not to backfill with construction waste. The construction waste in the bathroom is too heavy, which will cause the floor to crack, so it should be backfilled with ceramsite.

Waterproof (1 day)

Toilet, kitchen and balcony are waterproof. The best waterproof height of the bathroom is 1.8m, and the waterproof paint is brushed twice.

Water and electricity acceptance (1~2 days)

Do the suppression test and water storage test, notify the property and the neighbors downstairs in advance, and do the closed water test. After 24 hours, check whether there is water leakage downstairs.

Tile laying (5~7 days)

Before tiling, do a good job at the grass-roots level and level. When tiling, install the windowsill stone together. After tiling, the cabinet manufacturer will re-measure.

Bricklayer's acceptance (0.5 days)

Check whether the tiles are empty, the angle of yin and yang, the horizontal joints are staggered up and down, left and right, and the drainage in the bathroom is smooth.

Ceiling works (2~3 days)

Make wooden ornaments such as ceiling, mouth and background wall, and install curtains. After the ceiling is completed, customize the furniture scale.

Wall treatment (3~4 days)

Remove the dust and dirt on the surface and lines of wood products, scrape and polish with oily putty, and polish after filling putty. The putty should be scraped 2-3 times, not too thick.

Brush latex dyeing (2~3 days)

Painting process: the primer is polished once: the top coat is painted twice, and the color is tested in a small area first, and the wall is painted at least twice, and then painted again after each drying.

Paint acceptance (0.5 days)

Check whether the wall surface is smooth, with or without brush marks and color difference.

Cabinet installation (1~2 days)

Kitchen appliances such as range hoods and cookers can be installed together. Check whether the cabinets are scratched and damaged, and whether the plates and hardware are in conformity with the contract.

Switch installation (1 day)

The kitchen should choose a socket with a switch. After installation, pull the panel to see if it is firm.

Bedroom door installation (1 day)

If the bedroom is to be paved, the floor should be paved first and then the door should be installed, which can ensure that the gap between the door and the ground is appropriate.

Sanitary ware installation (1~2 days)

Install toilet: shower, basin hardware, etc.

Custom furniture installation (1~2 days)

Check before installation, and be careful not to touch the wall during installation.

Wall repair (1~2 days)

The installed latex paint is damaged, so let the foreman send someone to repair it. At this time, you can return the extra tiles.

At the same time, contact the manufacturer to repair the main materials such as wooden doors.

Furniture store entrance (1~2 days)

After the whole house is cleared, furniture and home appliances can be arranged for installation.

Ventilation in addition to formaldehyde (3~6 months)

Let the room dry for at least one month, especially after the smell of wood products such as cabinets and furniture has dispersed. If there are children at home, it is best to dry them for a long time, such as a summer!