Current location - Health Preservation Learning Network - Health preserving recipes - Development status of Fenghuang Island
Development status of Fenghuang Island
Among the seven major projects, the international cruise port was completed and put into operation on June 9, 2006. Phoenix Island International Cruise Port is the only international cruise port in Sanya and the gateway for international cruise tourists to enter Sanya. The cruise terminal is equipped with a modern passenger joint inspection building of nearly 10,000 square meters and eight border inspection channels, which can receive 3,000 international tourists at one time, with an annual reception capacity of more than 600,000. In addition, a 60,000-ton and 250,000-ton cruise terminal is under construction, which will be able to receive the largest cruise ship in the world. Phoenix Island International Cruise Port was completed and opened to traffic on June 9, 2006. By the end of 2007 10, the home port of Phoenix Island International Cruise had received 28 international cruise ships, and the number of international tourists entering Sanya through this port reached 14000. With the increasingly mature operation of cruise port, the number of international cruise flights scheduled to arrive in Hong Kong in 2008 has doubled compared with that in 2006, and will reach 54 flights.

Phoenix Island International Health Resort Center was completed and delivered in August 20 12. 1# Building Phoenix Island Resort Sanya was put into trial operation on 65438+5 February 2005.

In order to welcome the138,000-ton large-scale cruise ship that will berth in August 2000 15, the second phase of the cruise port project is under continuous construction, and it is planned to complete the construction of the first 150,000-ton berth (150,000-ton berth being applied for) by the end of July 200015.