Damage classification:
Non-integral failure: the failure form of uplift piles when the number of piles under the bearing platform is small and the spacing between piles is large.
Overall failure: when a single pile is pulled out, when the pile spacing is small, the pile and soil are often pulled out and destroyed as a whole.