? Materials and labor costs are the most expensive in decoration, especially labor costs. There are many kinds. If it is not clear, it will inevitably be ignored by the decoration company or the decoration team. Therefore, it is necessary for owners to learn some relevant knowledge before renovation. Due to the geographical or time gap, the following quotations can only be used as reference prices, not as absolute prices. You can also participate in the free bidding of Tubatu decoration network, so as to get free room type measurement and free design, and enjoy all aspects of decoration guarantee and safety decoration. Click to enter the bidding.

I. Demolition works

Serial number, project name and unit reference price? Say? bright

1 aluminum alloy window unit demolition (? Min):? 8.00 yuan? (Aluminum alloy window closed on balcony is discussed separately)

2 Remove wooden doors and windows? Unit (mm):? 8 yuan

3 Remove steel doors and windows (single and double doors)? Unit (mm)? :? 14.00 Yuan, calculated in 20 yuan for floors above 6.

4. Cost of protective measures for removing steel doors and windows (single and double fans):? 10.00 yuan? Relates to the peripheral structure

5 Remove steel doors and windows (three or four)? Unit: 2 1.00 yuan? (? 30 yuan is above 6 floors).

6 Protective measures for removing steel doors and windows (Grade III and IV)? Unit: 15.00? Meta-correlation peripheral structure

7 Demolition of steel doors and windows (more than four floors) Unit (has grown two millimeters): 40 yuan? (More than 6 floors count as 50 yuan)

8. Protective measures for removing steel doors and windows (above four floors). Cost unit (? )? 20.00 yuan involves external structure.

9 Remove the brick wall? Unit (m? ):? 220 yuan

10 chisel out floor tiles and wall tiles? Unit (m? ):? 2 15.00 yuan

1 1 Eliminate flat roof and wall painting units (m? ): 24 yuan

12 eradication of flat roof and wall wallpaper (wall covering) unit (m? ): 23.50 yuan

13 demolition of wooden floor (including wooden joists) unit (m? ): 28 yuan

14 small wooden floor unit demolition (m? ): 23 yuan

15 remove the fixed wood products, ceiling and partition unit (m? ): 27 yuan

16 remove the tin water pipe (exposed pipe)? Unit (m? ): 2.00 Yuan Ming Pavilion

17 remove the desktop washbasin? Unit (only): 15.00 Yuan is no longer used.

18 remove the vertical washbasin? Unit (only): 5.00 yuan is no longer used.

19 Dismantle the bucket (water tray) Unit (only): 5.00 yuan will not be used.

20. Dismantle the toilet unit water tank (only): 8.00 yuan is not needed.

2 1 Demolition of bathtub unit (only): 35.00 yuan? Cast iron bathtub is another discussion.

22 remove the wooden skirting board unit (m? ): 1.50 yuan

23 Unit (set) for removing the window sill guardrail: 10.00 Yuan.

Second, build by laying bricks or stones powder engineering

24 for new brick walls 1? Unit (m? ):2 18.00? Yuan does not contain leveling gypsum.

25 new 1/2 brick wall? Unit (m? ): 2 12.00 yuan excluding leveling and plastering.

26 new 1/4 brick wall? Unit (m? ): 28.50 yuan? The wall height is not higher than 1400mm, excluding leveling and plastering.

27 new glass brick wall? Unit (meter): 228.00 yuan

28. Plastering and leveling unit for wall surface and top surface (m): 2 1 1.50 yuan, with thickness within 20mm.

29 th floor leveling layer (powder flat)? Unit (meter): 28.00 yuan, with the thickness within 20mm.

30 The ground is flat, increasing by 10? Hmm? Unit (mm): 22.00fqb?

3 1 floor tile? Unit (meter): 220.00? Unilateral length exceeding 600mm refers to marble.

32 glazed tiles? Unit (meter): 230.00 yuan? Unilateral length exceeding 600mm refers to marble.

Floor made of granite and marble? Unit (meter): 240.00 yuan? Spelling is another discussion.

Granite and marble skirting boards? Unit (meter): 5.00 yuan

There are 35 pebbles on the floor? Unit (m): 220.00 yuan, which shall be discussed separately.

36 wall tile (block material perimeter below 40cm)? Unit (meter): 235.00 yuan

37 wall tile (block circumference is greater than 40cm)? Unit (meter): 220.00 yuan

38 seamless wall tiles? Unit (meter): 232.00 yuan? Unilateral length exceeding 600mm refers to marble.

39. Is there a cultural stone on the wall? Unit (meter): 2 14.00 yuan.

40 interior wall plastering granite and marble m250.00 dry hanging is another discussion.

4 1 vermicelli tube? Unit (root): 50.00 yuan

42 powder repair doors and windows? Unit (meter): 3.00

Mosaic on the ground? Unit (meter): 225.00 yuan? Advanced and mosaic are discussed separately.

Mosaic on the wall? Unit (meter): 235.00 yuan. Advanced and mosaic are discussed separately.

45 moistureproof treatment? Unit (meter): 24.00 yuan

Install waterproof cover of marble shower room? 50.00

47 Install marble threshold? Unit (block): 30.00.

48 Newly-built bathtub base: one (only): 50.00 yuan.

49 Powder pipe trough: unit (meter): 2.00 yuan.

Third, the ceiling project.

50 wooden keel plasterboard hanging flat top (plane)? Unit (meter): 230.00 yuan? According to the projected area, calculate the engineering quantity.

5 1 wooden keel plasterboard hanging flat top (height)? Unit (meter): 235.00 yuan? Calculate the engineering quantity according to the developed area, and discuss the special shape separately.

52 plastic gusset plate hanging flat top? Unit (meter): 220.00 yuan including wood base.

53 metal strip, square plate hanging flat top? Unit (meter): 225.00 yuan, including grass-roots units.

54 wooden lattice glass hanging flat top? Unit (m): 240.00 yuan, including the installation of transparent materials such as glass and lamps.

55 new Chinese fir gusset ceiling? Unit (meter): 225.00 yuan

Four, partition wall, dado project

56 Newly made wooden keel gypsum board partition wall (double-sided)? Unit (meter): 225.00 yuan

57 Newly made light steel keel gypsum board partition wall (double-sided)? Unit (meter): 2 14.00 yuan.

58 panel (double splint) plane? Unit (meter): 225.00 yuan

59. Is the partition (double splint) concave and convex? Unit (meter): 235.00 yuan

60 mirror glass installed on the wall? Unit (meter): 235.00 yuan? Specifications exceeding 1m2/ block shall be calculated as 20% of the product price.

6 1 wall fabric? Unit (meter): 230.00 yuan

Verb (abbreviation of verb) floor engineering

New wooden keel platform? Unit (meter): 220.00 within 200mm of height.

Laying subbase floor? Unit (meter): 220.00? Wooden joist

Single-layer tongue-and-groove floor unit (m): 223.00? Does not include the bottom layer.

65 double tongue-and-groove plain floor? Unit (square meter): 235.00, excluding the ground floor.

66 single-layer paint-free floor? Unit (meter): 230.00

67 double-layer paint-free floor? Unit (meter): 242.00

68-story composite floor? Unit (meter): 27.00

69 double-layer composite floor? Unit (m): 227.00 wooden floor joist.

70 anticorrosive wood floor? Unit (meter): 230.00

7 1 Installation of finished stair step (with base) unit (step): 30.00 arc is discussed separately.

72. The installation of special shapes of finished wooden stair railings and handrails m40.00 will be discussed separately.

73 Installation and construction cost of steel stair platform 140.00

74 mechanical grinding floor m27.00

Six, doors and windows engineering

75 new doors and windows? Unit: 50.00.

76 newly made wooden window sash? Unit (fan): 88.00 including installation.

77 Newly made fully fixed doors (double plywood)? Unit (fan): 100.00 including installation.

78 Newly-built process door: unit (fan): 150.00 including installation.

79 Newly-built glass wooden door: unit (fan): 180.00 including installation.

Installation of finished wooden door: unit (fan): 60.00 including lock and door suction installation.

8 1 supporting construction fee for installing security doors? Unit (fan): 40.00

Install the finished wooden sliding door? Unit (fan): 50.00

Seven, decoration engineering

83 New bobbin board (with 2mm)? Unit (m): 10.00

84 New bobbin board (without needle)? Unit (m): 15.00

85 solid wood face-to-face installation (within 8cm)? Unit (meter): 2.00 finished product line

86 solid wood face-to-face installation (8cm away)? Unit (meter): 2.50 finished product line

87. How to make and install a splint on the face? Unit (m): 6.00 machine-made wood-based panels, plywood and lines.

88 window cover (joinery board base)? Unit (meter): 20.00

89 packages of bay window covers (joinery board base)? Unit (meter): 25.00

90 days ceiling corner line? Wooden line? Unit (m): 1.00

9 1 ceiling corner line? Plaster line (corner line)? Unit (meter): 2.00

92 ceiling top corner line? Plaster line (flat line)? Unit (m): 1.00

93 new waist line? Unit (m): 6.00 machine-made wood-based panels, surface plywood and lines.

94 wooden windowsill board (joinery board sandwich)? Unit (meter): 20.00? Within 300mm, including installation of solid wood convergent line.

95 wooden windowsill board (joinery board interlayer) Unit (m): 25.00? Within 600mm, including the installation of solid wood convergent line.

96 marble windowsill? Unit (meter): within 300mm of width 15.00.

97 marble windowsill? Unit (meter): the width beyond 300mm is 235.00.

98 curtain box unit (m): 12.00

99 skirting board installation? Unit (meter): 2.00? Solid wood products

100 manufacturing and installation of skirting splint? Unit (m): 6.00 machine-made wood-based panels, surface plywood and lines.

10 1 window rail installation (single)? Unit (set): 10.00

102 installing window rails (double)? Unit (set): 12.00

Seven, cabinet engineering

103 kitchen cabinet? Including door panels? Unit (meter): 85.00? The cabinet is 350 mm deep and 600 mm high.

104 kitchen cabinet? Excluding door panels? Unit (meter): 60.00? The cabinet is 350 mm deep and 600 mm high.

105 low kitchen cabinet? Including door panels? Unit (meter): 95.00? The cabinet is 550 mm deep and 800 mm high.

106 low kitchen cabinet? Excluding door panels? Unit (m): 70.00 cabinets with a depth of 550mm and a height less than 800 mm

107 making and installing drawers? Unit (only): 30.00

108 install the finished cabinet door? Unit (fan): 10.00

109 manufacturing and installing plywood doors? Unit (fan): 40.00

1 10 room wardrobe? (wooden reinforcement base)? Unit (m): 2 130.00 excluding doors.

1 1 1 room wardrobe? (plate structure)? Unit (meter): 290.00 excluding doors.

Eight, paint engineering

1 12 hair wall embedded? Unit (meter): 26.00? The second batch of embedded putty

1 13 latex paint for walls and ceilings Unit (m): 2 10.00? Including the second batch of embedding, machine spraying fee plus 5 yuan.

1 14 wood surface coloring? Unit (meter): 25.00

1 15 wallpaper (no mosaic)? Unit (m): 2 15.00

1 16 wallpaper (mosaic)? Unit (m): 2 17.00

1 17 ceiling wallpaper (without mosaic)? Unit (m): 2 16.00

1 18 ceiling wallpaper (mosaic)? Unit (m): 2 19.00

1 19 wood surface coated with wood paint? Unit (meter): 225.00 3 degrees, plus 5 yuan machine spray.

120 wood surface painted with wood paint? Unit (meter): 230.00 3 degrees, plus 5 yuan machine spray.

12 1 wood surface shall be painted with nitrocellulose lacquer (wood wax gram) m235.00 six degrees, and the machine spraying fee shall be added with 5 yuan.

122 every degree of wood paint? Unit (meter): 25.00

123 add nitrolacquer every time? Unit (meter): 25.00

124 markup fee for painting treatment? Unit (meter): 25.00

125 floor painting? Unit (meter): 2 15.00 degrees.

126 anti-corrosion treatment of wooden joists? Unit (meter): 24.00

127 floor waxing? Unit (meter): 225.00

Nine, hydropower engineering

128 brick wall gouging? Unit (m): 5.00 excluding cosmetic powder.

129 concrete wall gouging? Unit (m): 14.00 excluding powder repair.

130 laying metal electric pipes? Unit (meter): 5.00

13 1 laying plastic electric pipes? Unit (meter): 3.00

132 install switch socket? Unit (only): only 4.00

133 wooden floor installation unit socket (only): 14.00

134 threading? Unit (meter): 0.50? According to the consumption of a single wire

135 install ceiling lamp? Unit (only): 8.00

136 install fluorescent lamps? Unit (only): 8.00

137 installing a wall lamp? Unit (only): 8.00

138 install downlight (spotlight, electroluminescence)? Unit (only): 4.00

139 the installation of luxury lamps is only advanced, calculated at 7% of the product price.

140 add and replace the plug-in box? Unit (only): 10.00? Air switch, leakage protection, etc.

14 1 Install the embedded distribution box? Unit (only): only 80.00

142 drain pipe? Unit (m): 15.00, including washing machine, floor drain, shower room and sewage pool, with a pipe diameter less than 50 mm

143 installing metal marble countertop bracket (set)

144 laying PPR water pipes? Unit (meter): 5.00

145 laying aluminum-plastic water pipes? Unit (meter): 2.00

146 install the gate valve? Unit (only): 5.00

147 install triangle valve? Unit (only): 5.00

148 installing a bathtub? Unit (only): 120.00 cast iron, 7% of the product price in advance.

149 install a sitting toilet? Unit (only): 50.00 advanced is calculated at 7% of the product price.

150 install the rear drain toilet? Unit (only): 90.00 advanced is calculated at 7% of the product price.

15 1 Install hanging urinals? Unit (only):? 25.00 The insurance premium is charged at 7% of the product price.

152 install the bidet? Unit (only): 50.00 advanced is calculated at 7% of the product price.

153 installation of basin and water tray? Unit (only): 50.00 advanced is calculated at 7% of the product price.

154 install vertical basin? Unit (only): 20.00 advanced is calculated at 7% of the product price.

155 install the bathtub faucet? Unit (only): 15.00 advanced is calculated at 7% of the product price.

156 install the basin faucet? Unit (only): 10.00 Advanced is calculated at 7% of the product price.

157 install water pan head (single cooling)? Unit (only): 5.00 advanced is calculated at 7% of the product price.

158 install bathroom hardware set 50.00 towel rack, clothes rack, makeup rack, etc.

159 installed Yuba? Unit (only): 30.00 excluding wall penetration.

160 installing exhaust fan? Unit (only): 20.00 excluding wall penetration.

16 1 Install a range hood? Unit (only): 30.00 excluding wall penetration.

162 installing water heater (electric heating type)? Unit (only): 60.00 excluding wall penetration.

163 solar water heater installation supporting fee? Unit (only): 35.00

164 installation matching fee for positive displacement water heater? Unit (only): 35.00

X. special attachments

165 superelevation fee/storey height over 3.6m? Unit (m): 230.00 Calculated according to the projected area of the superelevation part.

166 The floor heating construction fee is calculated at 3.5% of the product price.

167 the project cost of central air conditioning system is calculated at 3.5% of the product price.

Note: This reference price is only applicable to ordinary decoration works. For projects with special construction technology or high-grade decoration materials required by the owner, the labor cost can be agreed by the owner and the decoration enterprise separately. If the owner has any questions, he can click to call the decoration company for consultation.