China Construction Second Engineering Bureau General Contracting Company Project
Orthopedic Ward Building of the Third Hospital of Hebei Medical University 1

Project Description: The project is located in the northwest of the Third Hospital of Hebei Medical University, Qiangzi Road, Shijiazhuang City, and adjacent to the original 14 floor comprehensive ward building in the east. The total construction area is 32,962 square meters, and the main body of the project is frame-shear structure, with underground 1 floor and aboveground 14 floor, with a total height of 57.65 meters. The actual commencement date of this project is April 19, 2006, the contract duration is 9 13 days, and the contract cost is 55,566,500 yuan. The main materials of this project are supplied by Party A. By the end of 2008, the project has been completed and put into use.

2. Beijing Splendid Land Green and Safe Food Franchise Market

The project is located in Beijing, with a construction area of 140035 square meters and a contract amount of 2 1, 2 1.7 million yuan. It is a steel frame-seismic wall structure, which was started in 2004 and completed on April 20, 2006.

3. Run Stone Center

The project is located near the third diplomatic embassy area of Liangmahe River in Chaoyang District, Beijing, with Tianze Road in the west and only one road away from the American Embassy, Jialou South Road in Lin 'an City in the south, Beijing City Plaza in the east and the Status Quo Lake in Anjia Village in the north. The project was invested and constructed by Zhonglian Runshi (Beijing) Investment Co., Ltd., designed by Beijing Architectural Design and Research Institute, and undertaken by the general contracting company of the Second Bureau.

The total construction area of this project is 98,698 ㎡, including: 65,848 ㎡ above ground; Underground 32,850 ㎡, frame-shear wall structure, eaves height 77.05m m. Two main buildings and a podium above 0.000m are divided into three relatively independent structural units by seismic joints. The floors above ground are 14 ~ 17, and the first floors of the north and south buildings are all commercial buildings except the entrance lobby of each building. The second and third floors of the South Building are commercial buildings; The second and third floors of the north building are used as restaurants; The first floor of the podium is an exhibition hall, the columns on the second and third floors are hollowed out to form a shared space, and the top cover is a lighting glass roof; The standard floor is the office building. There are 4 floors underground, and the first floor is the service rooms such as supermarkets and staff restaurants, weak current center, high-voltage connection room, diesel generator room and air conditioning room. The second floor underground is a parking garage, a power distribution room and a garbage collection room, which also serves as a logistics and transportation floor, and goods and garbage are distributed in a centralized way; The third floor underground is a parking garage; The fourth floor underground is usually a parking garage, and it is a six-level material warehouse in wartime. Other functions include freezing room, freezing pump room, fire pool and pump room, reclaimed water pump room, domestic water pump room, heating station and ventilation room. The total project price is about 300 million yuan. The project started on September 4, 2009, and by the end of 2009, the earthwork of the foundation pit was completed to-16.8m; Shotcrete support and soil nailing support are all completed; The slope protection pile is completed; Waterproof curtain pile completed; Prestressed anchor rod completes the fourth lane.

4. Taiyuan wanda plaza

Taiyuan wanda plaza is located in the south of Taiyuan North Street, west of Jiefang Road, north of Hanximen Road and east of Longtan Park on Xinjian North Road. It is invested and constructed by Taiyuan wanda plaza Co., Ltd., designed by Taiyuan Architectural Design and Research Institute, and undertaken by the general contracting company of the Second Bureau.

The project consists of commercial housing and bar street, which is a comprehensive building integrating residence and commerce, with a total cost of about 3.94 billion yuan.

In which, B 1 regional contract duration: May 1, 2065438-September 1, 16, totaling 504 calendar days. Scope of contract: structure, interior decoration, electrical, water supply and drainage, HVAC engineering. Building area: 5 #:16481.71m2; 7#: 1648 1.7 1㎡; 6#; 16538.0 1㎡; 8#: 165 19.98㎡; Underground garage: 19447.9 m2 ... 32 floors above ground and 3 floors underground (including mezzanine). The total height of the building is108.80m. Structural form: the main building is shear wall structure.

Bar street is a multi-purpose commercial building with two to five floors, which is scattered along the road and surrounded by urban roads. Each building is relatively independent and organically combined to form a pedestrian street, including restaurants and entertainment facilities. The structural form is frame structure, with a total construction area of 57319m2, of which the aboveground construction area is 37134m2 and the underground construction area is 20185m2.

The project started on June 8, 2009, and by the end of 2009, Bar Street: 3 floors above ground and 4 floors locally; A-G area of roofing project is completed; Insulation works are completed in area A-F; Electromechanical pre-embedding; The external network is completed on three sides: north, south and west. Building A2 1 1#: the main structure of the first floor is constructed, and the foundation of Building 6 is constructed.

5. New Zhengzhou Library (Civic Cultural Center)

The project is located in the north of Kewen 1st Street, south of Kewen 2nd Street, north of Rongxing Road and west of Minsheng Road in Zhengdong New District of Zhengzhou City. The agent is Henan First Construction Engineering Group Co., Ltd.; The design unit is Beijing Architectural Design and Research Institute; The supervision unit is Intel Engineering Consultant (Shanghai) Co., Ltd.; It was undertaken by the general contracting company of China Construction Second Bureau.

The project cost is about 460 million yuan, with a total construction area of 72,095 square meters, including underground 19053 square meters, aboveground 53,042 square meters, and the total building height is 30.6 meters ... floors: the main building has five floors above ground and the podium has two floors; Underground level, with equipment interlayer locally. Structural form: reinforced concrete frame shear and frame; Local steel structure, the foundation adopts bored pile and waterproof board foundation. Project contracting scope: civil engineering, water supply and drainage engineering; Ventilation and air conditioning engineering; Electrical engineering.

The project started on July 2, 20091,and the main structure of the basement was completed by the end of 2009.

6. Ward building of the 254th Hospital of PLA

Project location: No.60, Huang Wei Road, Hebei District, Tianjin

Employer: Hospital Affairs Office of No.254 Hospital of PLA.

Design unit: Architectural Design and Research Institute of General Logistics Department of China People's Liberation Army.

Supervision Company: Tianjin International Engineering Construction Supervision Company

China People's Liberation Army Quality Supervision Station Tianjin Sub-station.

Construction unit: General Contracting Company of Second Bureau.

Scope of contract: civil engineering, decoration, water supply and drainage, lighting and other projects.

The contract period is from February 10, 2009 to February 14, 2009, totaling 730 calendar days.

Contract quality standard: qualified

Project quality objective: high-quality project in military region.

Building area: 786 16.5 1 m2.

The underground garage of this project consists of office, medical department, surgery department and ward. The above-ground building area is 62,659.34m, and the underground building area is15,957.17m, with 20 floors above ground and 2 floors underground. Building height: 5.5m for the first floor underground, 3.8m for the second floor underground, 4.8m for the ground 1-4 floor, 3.6m for the fifth floor, and 3.9m for the sixth floor and above. Building height The total height of the building is 83.75 meters.

The project started at 5438+0 1 in June, 2008. By the end of 2009, the main structure: section 7 to 1 1, section 6 to 9 and section 4 to1/.

7. Expressway Oran Garden Community

Aolan Garden Community of Expressway is a group residential community developed by Henan Expressway Real Estate Development Co., Ltd., covering an area of about 105746.8㎡, with a building area of about 466,000 ㎡, a length of about 455m from east to west and a width of about 25 1m from north to south. The whole community is divided into three construction sections, and our unit undertakes the construction of section III of Oran Garden Expressway, including 7 high-rise main buildings, 6#, 7#, 9#, 10#, 14#, 15#, 16# underground garages and. The building has three structural forms: shear wall structure, frame-shear wall structure and beam-slab prestressed structure. The seismic fortification intensity is 7 degrees, and the overall design of the house adopts the "decorative art" style.

The contract duration is 540 calendar days, and the total cost is about 230 million yuan.

Construction unit: Henan Expressway Real Estate Development Co., Ltd.

Supervision unit: Beijing Construction Engineering Jingjing Dafang Engineering Construction Supervision Company.

Designer: Shanghai Lianchuang Architectural Design Co., Ltd.

Construction unit: General Contracting Company of Second Bureau.

The project started in August 2008. By the end of 2009, the main structures of buildings 6#, 7#, 14~ 16#, 9# and 10# were completed, and the interior and exterior decoration construction was completed. Underground structure construction of 19# building. 6#, 7# garage main body, fire control, ventilation, lighting construction.

8. Tianjin Port International Cruise Terminal Passenger Terminal Building

Project Name: Tianjin International Cruise Terminal Project (Passenger Terminal Project)

Project location: south end of Tianjin Dongjiang Port Area

Owner: Tianjin Port (Group) Co., Ltd.

Designer: China Construction (Beijing) International Design Consultant Co., Ltd.

Supervision unit: Tianjin Port Engineering Supervision Consulting Co., Ltd.

Scope of contract: civil engineering, decoration and installation within the scope of drawings and list.

Floor space: about 59,000 square meters, building area: 2 1 388 square meters.

Total amount: 594.07 million yuan

Time limit for a project: the project started on March, 2009 15 and was completed on May, 3, 20001.

Contract quality objective: Qualified, striving for Luban Award.

Auxiliary quality goal: to ensure the acquisition of Tianjin "Structural Haihe Cup"; Ensure to win the "Haihe Cup Gold Award" in Tianjin.

Ensure to win the "China Construction Cup" of China Construction Corporation.

Civilized construction goal: to ensure the acquisition of "Tianjin civilized construction site"; Ensure to obtain the CI model site of China Construction Corporation.

Scientific and technological innovation goal: to ensure the title of "Science and Technology Promotion Demonstration Project" of China Construction Corporation; Ensure the release of provincial and ministerial level 1~2 QC results.

The project started on March 6, 2009. By the end of 2009, the decorative glass of the external wall has been installed, the grc board of the roof has been completed 80%, and the keel of the indoor second partition wall has been installed.

9, production plant and ancillary facilities engineering

Project Name: beijing jishuitan hospital Huilongguan Campus

Project address: Huilongguan Town, Changping District, Beijing

Owner: beijing jishuitan hospital.

Survey unit: Beijing Survey and Design Institute.

Agent: Project Management Department of Huilongguan Campus of Jishuitan Hospital of Beijing Tian Hong Group Company.

Design unit: Beijing Architectural Design and Research Institute

Supervisor: Beijing Cyrus International Engineering Consulting Co., Ltd.

Construction unit: General Contracting Company of Second Bureau.

Building area: the total building area is 68,520 ㎡, the underground building area is 2,2571㎡, and the aboveground building area is 45,949 ㎡.

The height of the main building is 46.99 meters, and the height of the podium building is 19.29 meters.

The main building has floors above ground 1 1F, 3F underground, podium 4 floors, and local 3F underground.

Contract duration: the planned commencement date of the construction team: August 9, 2007; Completion date: June 26, 2009; The planned construction period is 688 days.

The contract quality goal ensures the Beijing Great Wall Cup and strives for the Luban Award.

The project started on May 6, 2007. By the end of 2009, 85% of the wall plastering on the second floor underground was completed, and the glass curtain wall with axis 10- 15 was completed.

10, beijing jishuitan hospital huilongguan campus project

Project Name: beijing jishuitan hospital Huilongguan Campus

Project address: Huilongguan Town, Changping District, Beijing

Owner: beijing jishuitan hospital.

Survey unit: Beijing Survey and Design Institute.

Agent: Project Management Department of Huilongguan Campus of Jishuitan Hospital of Beijing Tian Hong Group Company.

Design unit: Beijing Architectural Design and Research Institute

Supervisor: Beijing Cyrus International Engineering Consulting Co., Ltd.

Construction unit: General Contracting Company of Second Bureau.

Building area: the total building area is 68,520 ㎡, the underground building area is 2,2571㎡, and the aboveground building area is 45,949 ㎡.

The height of the main building is 46.99 meters, and the height of the podium building is 19.29 meters.

The main building has floors above ground 1 1F, 3F underground, podium 4 floors, and local 3F underground.

Contract duration: the planned commencement date of the construction team: August 9, 2007; Completion date: June 26, 2009; The planned construction period is 688 days.

The contract quality goal ensures the Beijing Great Wall Cup and strives for the Luban Award.

The project started on May 6, 2007. By the end of 2009, 85% of the wall plastering on the second floor underground was completed, and the glass curtain wall with axis 10- 15 was completed.

Comprehensive dispatching building project of Henan electric power company 1 1

The comprehensive dispatching building of Henan Electric Power Company is located in Songshan South Road and Guangchang South Road, Zhengzhou City, with three floors underground and thirty-two floors above ground. The main floor height is 4.5m and 5m respectively, and the building area is 64810m2. The elevation of the basement raft is-13.800m, the elevation of the roof is 174.900m, the elevation of the top of the steel structure is 206.000m, and the elevation of the tower antenna is 235.300m m. In this project, the reinforced concrete tube-steel reinforced concrete frame structure is adopted below the fourth floor, and the reinforced concrete tube-steel reinforced concrete column, H-beam and profiled steel plate are adopted above the fifth floor. The overall shape of the building is unique and novel, and the decoration grade is high. When completed, it will become a landmark building in Zhengzhou.

The project started on June 5, 2008+February, and the main structure was constructed to the sixth floor at the end of 2009.

Zhengzhou Railway Station West Exit Project Ⅱ 12

Project name: Ⅱ Bid Section of Zhengzhou Railway Station West Exit Station Square and Underground Parking Lot Project

Owner: Construction Department of Zhengzhou "One Station, One Bridge, One Road" project.

Construction site: west of Zhengzhou New Railway Station West Station Building, east of Jingguang Road, south of Zhongyuan Road, north of Longhai Road and west of Taihe Road.

Design unit: Zhengzhou Municipal Engineering Design and Research Institute.

Zhengzhou architecture design institute

Survey unit: Zhengzhou Geological Engineering Survey Institute of Ministry of Chemical Industry.

Supervision unit: Henan Hongye Construction Engineering Management Co., Ltd.

Construction unit: General Contracting Company of Second Bureau.

The construction period of this project is 180 days, and the structural form is frame structure. The building floor is underground with a height of 5 meters. The use function is the distribution square in front of the station, and it is an underground garage for single building. The post-cast strip at 3800mm south of "26" axis is bid Ⅱ (including post-cast strip). The east-west width is about 128m, the local width is about 17 1m, and the north-south length is about 207m. The total construction area of the project is about 30,000 square meters, and the contract amount is 108 1800 yuan.

The foundation of this project adopts CFG pile composite foundation, and the seismic grade of frame-shear wall structure is Grade 4. The structural roof is cast-in-situ concrete hollow floor, and the beams of this project are all upturned concrete beams, which are poured at one time, and some long-span beams are prestressed beam-slab structures.

The project started on August 1 2008, and the stone pavement of Linshu Square was completed at the end of 2009. 90% of the square stone paving is completed; Indoor floor is completed; 1#, 2# Dongpo Road roofing completed; 95% of backfill soil and 80% of roads; 80% of the sinking square fence construction; The roof of the fire pool is finished.

Blocks B2 and B3 in the Core Area of National Software and Service Outsourcing Industrial Base in Tianjin High-tech Zone 13

Project Overview: The project is located in Haitaihua Science and Technology Road, Tianjin New Technology Industrial Park. The owner is Tianjin Haitai Technology Development Co., Ltd., designed by Tianjin Architectural Design Institute.

The contract amount of this project is 228.23 million yuan, which consists of B2 plot (1 No.2, No.3 building) and B3 plot (1 No.2 building), all of which are industrial workshops. Among them, plot B2 has a building area of 6 1, 010m2, with one underground floor and five floors above ground, and is of reinforced concrete frame structure with a total building height of 23m. Block B3 has a building area of 41.030m2, with one floor underground and five floors above ground, and a reinforced concrete frame structure.

The contract period of this project is from February 6, 2008 to September 20, 2008.

The quality goal of this project is to strive for the Haihe Cup in Tianjin and realize the safe and civilized construction site in Tianjin.

The project started on February 6, 2008 and was completed by the end of 2009.

14, B3 B2 Haitai Innovation Base Project B 1, Area C Project

Project Description: The project is located at Kaifawu Road, Haitai, Tianjin. The construction unit is Haitai Fangcheng Investment Co., Ltd., and the design unit is Tianjin Architectural Design Institute. It is supervised by Tianjin Jianhua Construction Engineering Supervision Company and contracted by this bureau.

The contract amount of this project is 83.46 million yuan, with a total construction area of 6 1.088㎡, which consists of office area and workshop area. B2. Building B3 B 1 is a Class C factory building, with structural type: the foundation is the pile cap foundation, and the main body is the reinforced concrete frame structure, in which: Building b 1 has five floors above the ground and a construction area of 5045.646. Building B2 has eight floors above ground and six floors locally, with a building area of 18900.04m2 and a total building height of 36.65m Building B3 has six floors above ground, with a building area of 4257.83m2 and a total building height of 28.5m. Area C is a scientific research office building, including three buildings A, B and C, with a total building area of 32,883.98m2.. The building has one floor underground, eight floors above ground in Area A, four floors above ground in Area B and twelve floors above ground in Area C. The total building height is 51.2m. Structure type: the foundation is the pile cap foundation, and the main body is the reinforced concrete frame structure.

The project started in June 2007 and was completed at the end of 2009.

15, sports medicine building and emergency medical technology building of the reconstruction and expansion project of Peking University Third Hospital

Project overview: The project is located in the Third Hospital of Peking University. The construction unit is Peking University Third Hospital, and the design unit is Zhongyuan International Engineering Design and Research Institute. The total construction area is 77078m, and the contract amount is 316.5 million yuan.

Quality objective: qualified; Gold Award for Structure and Architecture of Beijing Great Wall Cup

Civilized construction goal: Beijing "safe and civilized construction site"

The contracting scope of sports medicine building: building, decoration, strong electricity, weak electricity, fire alarm system, water supply and drainage, fire hydrant system, spraying system, heating system, ventilation and air conditioning.

Total building height: 64.30m; ; Number of floors (above ground/underground):15/2; Structure type: the foundation is beam-slab raft, and the main body is frame-shear wall structure.

Duration requirements: start on June 20, 2007 and complete on June 3, 2009, with a duration of 765,438+05 calendar days;

The contracting scope of outpatient and emergency medical technology building: all construction projects, decoration projects, electrical projects, water supply and drainage projects, fire fighting projects, ventilation and air conditioning projects and medical gas pipeline projects indicated in the bidding drawings.

Total building height: 37.40m; Number of floors (above ground/underground): 8/2; Structure type: the foundation is beam-slab raft, and the main body is frame-shear wall structure.

Duration requirements:. Construction started on June 20th, 2007, and was completed on June165438+1October 15, with a construction period of 5 15 days.

The project started on August 18, 2007, and by the end of June, 2008, the sports medicine building and the outpatient and emergency medical technology building were capped. Stop working during the Olympic Games. By the end of 2009, 30% of the external wall tiles, 70% of the indoor floor, 70% of the bathroom of the Sports Medicine Building will be leveled and 20% waterproof. After the external wall insulation of emergency medical building is completed, the stone curtain wall is 30%, the glass curtain wall and aluminum curtain wall are 90%, the indoor floor is 90%, and the hot and cold water is 90%.

16, Business Operation Center of Industrial and Commercial Bank of China Limited.

Project overview:

Project location: No.55 Fuxingmennei Street, Xicheng District, Beijing.

Employer: Business Operation Center of China Industrial and Commercial Bank Co., Ltd.

Design unit: Bayesian Architecture Office of Beijing Architectural Design and Research Institute.

Project scale: contract amount: 628,065,438+0,000 yuan, total building height: 45.00m, total building area: 6 1325m2, overground165,438+0 floors (including one mezzanine), and building area: 46,000. There are 3 floors underground, with a construction area of 15325m2.

Structural form: underground reinforced concrete frame shear wall system, and the ground steel support is transferred from underground shear wall to foundation. The first underground floor is a transfer floor, which adopts steel reinforced concrete columns. The above-ground structure is a steel frame structure with eccentric support or central support beam, and some horizontal members are small trusses. The aerial connecting bridge adopts a layer of high-rise steel truss.

The project started on July 6, 2007. By the end of June, 2008, the basement wall masonry and steel structure installation were all completed. Stop working during the Olympic Games. At the end of 2009, the bathroom wall and ground stone were completed; Dry-hanging stone materials on the wall surface of the core tube on the west 7-9 floors and the east 2-6 floors; The sound-absorbing board of the air-conditioning machine room is completed and the glass partition is installed; Cantilever wing glass curtain wall, interlayer and second-floor glass fence are installed on the south facade; Air conditioning, electric heating insulation, garage hot air curtain, distribution box, first floor threading and lighting socket cable laying.

17, Beijing New Children's Palace

Project Description: Beijing New Children's Palace is located at No.3 Baiguoyuan, longtan lake, Chongwen District, Beijing. The construction unit is Beijing Student Activity Management Center, and the design unit is Beijing Architectural Design and Research Institute. The contract period is from September 28th, 2007 to May 7th, 2009, totaling 588 calendar days. The total construction area is 40374.39m2, and the contract quality standard is qualified, ensuring the gold medal of "Structural Great Wall Cup" in Beijing. Project quality goal: to create "Building the Great Wall Cup" and Luban Prize in Beijing.

The main functions are art activity area, sports activity area, green science and technology center, student activity center, theater, underground garage and ancillary facilities.

Architectural features: the whole building is connected with the central hall by five units, and the two units in the east are art activity areas, including rehearsal halls (theaters) and various rehearsal halls; The three units in the west are sports, comprehensive activity area, green science and technology center and student activity area. The podium on the first floor is the central hall, which connects the five units. This centralized and decentralized layout is conducive to good direct lighting and natural ventilation in all parts of the classroom, so as to meet the requirements of health and comfort without or with little air conditioning equipment.

The staggered petal-shaped layout and dendritic curve modeling are adopted in the design, which makes the facade full of layering, movement and growth. The above-ground building area is 23600.82m, the underground building area is 16773.5m, and the civil air defense building area is 1555m. Building floors: 5 floors above ground (including podium 1) and 2 floors underground. The highest cornice height is 3 1. 7 meters.

Structural form: the foundation is raft foundation, the main body is special-shaped shear wall structure, and the roof is reinforced concrete and local steel structure.

The project started on February 28, 2007, and the main structure was completed in June 2009, and entered the decoration stage, but it began to stop due to the funding problem of Party A. ..