Current location - Health Preservation Learning Network - Fitness coach - How many villages are there in Jinke Village?
How many villages are there in Jinke Village?
Basic situation

Kebao Village has jurisdiction over 3 natural villages, with 625 farmers, 2,227 people and 488 laborers. The cultivated land is 10005 mu, including 5,000 mu of paddy fields. There are 267 mu of forest land and 32 fish ponds, covering an area of 4,000 mu. 20 1 1, the total output value of all industries in the village is 47 1.5 million yuan, including planting 1.47 million yuan, fishing 1.4 million yuan, animal husbandry 5.6 million yuan and tertiary industry 1.27 million yuan.

Tongtun Road in the village 15km, all hardened, central village roadway 14.8km, hardened 4.5km tap water into 420 households, with a household rate of 82%; The bricklaying rate of housing reaches 75%, and the per capita living area is 18 square meters.

Second, the overall goal

1, economic target. In 20 12, the total economic output value reached 50 million yuan, and the village economy grew steadily. By 20 15, the annual gross output value of the village will reach 90 million yuan, and the per capita net income will reach10.5 million yuan.

2. Infrastructure construction objectives. In two years, all the villagers lived in buildings with complete facilities and functions, and the original residential areas were built into green breeding areas and green planting areas; And with the major tourism companies in Harbin to jointly develop and build folk customs tourist areas.

3, social undertakings construction goals. Construction of kindergartens, village clinics, reading rooms and fully functional residents' fitness squares.

4, the village appearance construction goal. All the villages are afforested, beautified, purified and lighted.

By 20 13, the planting area of green rice will reach 5000 mu, and 70000 square meters of homestead will be used to build an organic vegetable production base to meet the market demand and provide folk tourism and catering.

Iii. Village Construction and Development Planning

1, new village construction planning. In 20 12 years, the planned residential construction land in the former Kebao village is16500m2, and the first phase investment is 25 million yuan. In the first phase, it is planned to build four new rural houses with a building area of 25,000 square meters, which can accommodate 300 villagers. It is planned to start construction on May 20th and deliver it on June 65438+ 10/day. At the same time, the second phase of the project will be started, and it is planned to invest 20 million yuan to build four new rural houses with a construction area of 200 million square meters, which can accommodate 250 villagers.

2. Production and construction planning. The third phase started in April of 20 13, with a planned investment of 40 million yuan, and the planned construction land area is 7 10 mu, including 500 mu of folk tourism villas; Green vegetable planting base 105 mu, including 50 greenhouse vegetables, planting green organic vegetables, providing 600,000 Jin of organic vegetables for folk tourism, catering and markets; Green breeding base 105 mu, build 80 pig houses, with an annual output of stupid pigs 10000 and 40 chicken houses, with an annual output of stupid chickens 100000. While satisfying folk catering, the rest can be put on the market.

3. Folk tourism planning. Develop folk tourism and build a 500-mu folk tourism village. There are 80 folk villas, 100 Manchu folk houses, Manchu cultural brands, Manchu catering culture and entertainment projects in the tourist village, which is a new entertainment and cultural village in Northeast China integrating fishing in summer, boating in winter, skating and skiing.

4. Infrastructure construction planning.

Invest 5 million yuan to build water supply and drainage, greening, lighting and ancillary facilities.

5. New energy construction planning.

Construction of straw solidification central heating and gas supply project, 20,000 square meters of solar livestock and poultry houses, solar energy-saving greenhouses 1 10,000 square meters, and 400 solar users, reaching 80%.

Fourth, the existing problems

1, planting. At present, farmers mainly operate independently, with scattered land, self-production and self-sale, no scale operation, low degree of specialization and organization and low efficiency.

2. aquaculture. Although it has developed to a certain extent, the scale of farming is small and there is no industrialization trend.

3. The tertiary industry. There are no large enterprises in the village, and the tertiary industry is dominated by local trafficking and labor export, with a low degree of labor transfer.

4. Infrastructure. Although there is a certain foundation, it is far from the requirements of the new rural construction standards, and the facilities are not matched and the functions are not perfect, especially the low bricklaying rate of housing, which needs to be solved urgently.

In 20 12, our village will vigorously build a "insurable folk tourism new village" by relying on its location advantages near the city, near the town, near the river and near Bali City, a site of the Jin Dynasty, as well as its own inherent resource advantages. Focus on promoting the integrated development of the three major industries (green planting, green aquaculture and folk tourism industry), and strive to build Baoan into the most civilized, affluent and suitable folk tourism village in the southwest of Zhaodong City in three years.

There are many tourist attractions near Kebao Village, such as Fossett in Zhaodong, Balicheng Site, Chinese Ancestor Memorial Hall, Lumeng Manor, Jingjue Temple and so on. There are also special products such as Zhaodong millet, hazelnut chicken, sesame radish cake, Zhaodong rice and Zhaodong scone.