The laying of plastic floor should conform to China or industry standards. The basic requirement for laying plastic floor is that the plastic floor laying personnel should lay it evenly and firmly on the plastic floor according to the measured and cut dimensions.
The concrete steps of plastic floor construction are as follows:
1, conductive primer: plastic floor pavers are required to use special tools to lay conductive primer on the ground and dry it before paving.
2. Laying self-leveling: The plastic floor paver is required to lay self-leveling on the bottom oil according to the self-leveling laying procedure, and polish it with a grinder after it is completely dried.
3. According to the measured size, draw the outline of the plastic floor with ink lines and woodworking tools.
4. Apply adhesive evenly on the ground according to the construction specification of gluing.
5. After seeing the indoor temperature, cut the plastic floor flat after 5-20 minutes.
6. Fully compact the plastic floor and the ground with a roller.
7. Cut off the excess parts and leave a gap of 0.3- 1MM between the plastic floors.