By the end of 20 1 1, Xinfu District had completed the street reconstruction of Shengli Road, Jianshe South Road, Guangming East Street and Guangming West Street, and completed the renovation of small streets and lanes in the old city, adding 3180m of sewer pipes, rebuilding 7200m of sewer pipes, installing 25 1 seat street lamps and repaving 2660 sidewalks. 7500 square meters of Jiulonggang Cultural Square was newly built, the Chengmenlou Square was restored 15000 square meters, and garbage bins were replaced 100, with a green area of 96.95 hectares. The green coverage rate of the built-up area reached 18.56%. A total of 4 township bus stations, 95 bus shelters and 336 welcome signs have been built, and 46 rural passenger lines have been opened, with rural passenger buses 1 10.
By the end of 20 1 1, Xinfu District Government had invested RMB190,000 to build 96 cultural and sports plazas with an area of 1300 square meters, equipped with more than 0/000 sets of various fitness equipment (pieces * * * 2/kloc-). By the end of 20 1 1, Xinfu District had reconstructed 17 township hospitals, organized 288 cataract operations, conducted directional walking for 428 blind people, conducted rehabilitation training for 6 19 disabled people, and provided wheelchairs and other assistive devices for 750 disabled people free of charge.