Party A:
Party B:
Party A's building under construction has several floors, one floor is about square meters, and the second floor is about square meters, which is contracted by Party B. Based on the principles of equality, mutual benefit, honesty and credibility, both parties agree to sign this agreement through consultation to ensure the safety, high quality, high efficiency and low consumption of the project for mutual compliance:
First, the contracting method.
Take the way of contracting without contracted materials.
Party A shall provide materials needed for the building, including: red bricks, river sand, stones, lime, cement, steel, water pipes, sewer pipes, nails, wires, water and electricity, etc.
Party B shall provide labor services, construction technology, construction tools and all production and living appliances.
Second, the construction project
Party B shall carry out the construction according to the design drawings or the requirements put forward by Party A. The buildings of Party A's main building project include walls, beams, columns, stairs, floors, formwork installation, formwork removal, steel bars, cast-in-place concrete and concrete cushion for the ground and front steps; Paint the interior decoration, paste the front exterior wall tiles, brush cement mortar along the rear exterior wall, paste the bathroom floor and wall tiles, and install porcelain pots, sewer pipes and downspouts; The top layer shall be polished with cement slurry, and at the same time, it shall be well treated for seepage prevention and impermeability.
Third, the contract price
RMB in words per square meter: RMB (), and the construction area is calculated according to each external wall. The construction scope includes all the walls that need cement mortar plastering.
Four. mode of payment
After the contract is signed, the tools and personnel are in place, 30% in advance, 50% when the first floor is bricked and compacted, 8000 yuan when the second floor and roof are completed, and 90% when the project is completed. 65,438+00% shall be reserved as quality deposit. If there is no quality problem within one year after completion, the final payment shall be paid.
Verb (abbreviation for verb) The responsibility of both parties.
Party A is responsible for water and electricity supply in place and raw materials entering the site in time.
Party B must ensure the quality and progress of the project, carry out the construction according to the design drawings and Party A's requirements, save materials, take good care of them and not lose them.
Six, quality requirements
Party B shall organize the construction in accordance with the national housing quality standards and requirements. If it is unqualified, Party B shall be responsible for rework, and the rework fee shall be borne by Party B or deducted from Party B's project payment by Party A..
Seven, pay attention to safety
Labor protection measures, construction protection measures in place, safe construction. If Party B's construction personnel suffer work-related injuries due to their own reasons or Party B's inadequate safety protection measures, or others are injured due to construction, Party B shall be responsible for everything, and Party A shall not bear any responsibilities and expenses. Civilized construction, pay attention to professional ethics, pay attention to cleanliness.
Eight, the time limit for a project requirements
The construction period of the main project is (calendar days). From the second day after the contract is signed, Party B must complete the main project before, and it will be postponed due to the weather. Party B shall not delay the completion time of Party A's building for various reasons. If Party B needs materials, Party B shall submit the plan to Party A in advance for timely preparation.
Nine, the later maintenance
The maintenance expenses arising from Party B's quality problems shall be borne by Party B, and the relevant compensation and responsibilities arising therefrom shall be borne by Party B..
X. others
Other matters not covered shall be settled by both parties through consultation, and shall be implemented in strict accordance with national and local standards.
This contract is made in duplicate, one for each party, and shall come into effect as of the date of signature.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
How to write the construction contract of rural self-built houses? Engineering outsourcing contract
Party A: Party B:
Party A entrusts Party B to build this project, and the agreement is as follows: 1. Project name: 2. Project address: 3. Project construction content:. 4. Duration: working day Commencement date: MM DD YY Completion date: MM DD YY. Project cost: 1), contract method: 2), total project cost of this contract: RMB only). 6. Payment method: Party A shall pay% of the total project amount in advance from the date when Party B enters the site for construction; After the project is completed and accepted (if it is not accepted within one week after completion, it will be deemed as qualified), Party B shall be paid the remaining project funds within one week. 7. Obligations of Party B: 1) Party B must carry out the construction according to the drawings, and Party A shall be responsible for the technical supervision. 2) Party B shall guarantee the construction period, and all economic losses arising therefrom shall be borne by Party B. 3) Party B must abide by the terms of the agreement, otherwise all economic losses shall be borne by Party B.. 4) Party B shall actively cooperate with Party A's on-site management and coordination, and Party B shall be responsible for the economic losses caused by Party B's passive management and construction. 5) Party B has the right to request the replacement of the unqualified products provided by Party A, and Party B is not responsible for the unqualified products. 8. Obligations of Party A: 1) Party A guarantees the construction conditions of Party B. 2) Party A must implement the terms of the agreement, otherwise Party A will bear all economic losses. 3) Party A shall actively cooperate with Party B to manage and coordinate the construction site, and Party A shall be responsible for the economic losses caused by Party A's negative management and wrong guidance. 4) The materials and equipment provided by Party A must meet the requirements of the owner and specifications. 1 1. Liability for breach of contract: 1) If Party B fails to complete the project on time,% of the total contract price shall be deducted for each day of late delivery until% of the total contract price is deducted. If the construction period exceeds days, the outsourcing contract will be automatically terminated. Party A has the right to subcontract the project to another party, and will investigate the losses caused by Party B to Party A ... except for the projects delayed due to Party A's extra work ... 2) If Party A fails to pay the project payment as agreed, it will pay% of the total contract price as liquidated damages for each day overdue. 12. Dispute settlement: Any dispute arising from the execution of this contract shall be settled by both parties through consultation; If negotiation fails, it shall be settled through litigation. 13. Other outstanding matters shall be settled by both parties through consultation. 14. This agreement is made in duplicate, with each party holding one copy. 15. This agreement shall come into force after being signed and sealed.
Party A: Party B:
Date: Date:
How to write a self-built foreign contract agreement and a construction contract?
Party A:
Party B:
Please discuss some details with local people who have built houses. ...
Party A's house under construction has two floors, one floor is about square meters, and the other floor is about square meters, which is contracted by Party B. Based on the principles of equality, mutual benefit, honesty and credibility, both parties agree to sign this agreement through consultation, so as to abide by it jointly:
First, the contracting method.
Take the way of contracting without contracted materials.
Party A shall provide materials needed for the building, including: red bricks, river sand, stones, lime, cement, steel, water pipes, sewer pipes, nails, wires, water and electricity, etc.
Party B shall provide labor services, construction technology, construction tools and all production and living appliances.
Second, the construction project
Party B shall carry out the construction according to the design drawings or the requirements put forward by Party A. The buildings of Party A's main building project include walls, beams, columns, stairs, floors, formwork installation, formwork removal, steel bars, cast-in-place concrete and concrete cushion for the ground and front steps; Paint the interior decoration, paste the front exterior wall tiles, brush cement mortar along the rear exterior wall, paste the bathroom floor and wall tiles, and install porcelain pots, sewer pipes and downspouts; The top layer shall be polished with cement slurry, and at the same time, it shall be well treated for seepage prevention and impermeability.
Third, the contract price
RMB in words per square meter: RMB (), and the construction area is calculated according to each external wall. The construction scope includes all the walls that need cement mortar plastering.
Four. mode of payment
After the contract is signed, the tools and personnel are in place, 30% in advance, 50% when the first floor is bricked and compacted, 8000 yuan when the second floor and roof are completed, and 90% when the project is completed. 65,438+00% shall be reserved as quality deposit. If there is no quality problem within one year after completion, the final payment shall be paid.
Verb (abbreviation for verb) The responsibility of both parties.
Party A is responsible for the timely supply of water and electricity, the timely entry of raw materials and the daily lunch.
Party B must ensure the quality and progress of the project, carry out the construction according to the design drawings and Party A's requirements, save materials, take good care of them and not lose them.
Six, quality requirements
Party B shall organize the construction in accordance with the national housing quality standards and requirements. If it is unqualified, Party B shall be responsible for rework, and the rework fee shall be borne by Party B or deducted from Party B's project payment by Party A..
Seven, pay attention to safety
Labor protection measures, construction protection measures in place, safe construction. If Party B's construction personnel suffer work-related injuries due to their own reasons or Party B's inadequate safety protection measures, or others are injured due to construction, Party B shall be responsible for everything, and Party A shall not bear any responsibilities and expenses. Civilized construction, pay attention to professional ethics, pay attention to cleanliness.
Eight, the time limit for a project requirements
The main project duration is 75 (calendar days). From the day after the contract is signed, Party B must complete the main project before. In case of weather, it will be postponed, and Party B cannot delay the completion time of Party A's building for various reasons. If Party B needs materials, Party B shall submit the plan to Party A in advance for timely preparation.
Nine, the later maintenance
The maintenance expenses arising from Party B's quality problems shall be borne by Party B, and the relevant compensation and responsibilities arising therefrom shall be borne by Party B..
X. others
Other matters not covered shall be settled by both parties through consultation, and shall be implemented in strict accordance with national and local standards.
This contract is made in duplicate, one for each party, and shall come into effect as of the date of signature.
Signature (seal) of Party A:
Signature (seal) of Party B:
For reference, the specific terms shall be negotiated by both parties.
How to write the rural mountain forest contract? You might as well write an agreement with a local lawyer.
How to write a kitchen contract about the kitchen contract scheme of shower bar
1 Solicit the bar kitchen contract from the public and advertise in the media.
2 to meet the conditions, bidding, negotiation and selection.
3. Sign the contract agreement, collect the contract payment, and implement the contract responsibility.
Model agreement
Party A: * * Bar lessor
Party B: * (ID number:) or * * unit contractor.
Party A and Party B have reached the following agreement on bar contracting through consultation:
Hotel kitchen contract
Party A:
Party B: New Cuisine Catering Planning Co., Ltd.
Through friendly negotiation, both parties reached the following agreement on kitchen contracting:
I. Rights and obligations of Party A
1. Party A contracts the kitchen to Party B for management and operation, and employs Party B's staff as the kitchen chef for a period of years, that is, years.
The probation period is three months, that is, from year to year.
If it is necessary to continue employment after the expiration, a separate agreement must be signed.
2. Party A shall ensure the supply of kitchen raw materials according to business needs.
3. Party A provides Party B with working meals and dormitories free of charge.
4. The total monthly salary of Party B is RMB, and the last month's salary is paid on the day of each month, and Party B provides the salary to establish a People's Bank account.
In the future, if it is necessary to increase or decrease personnel according to the business situation, then consider increasing or decreasing the total salary. After the probation period, Party A and Party B shall formulate reasonable business indicators according to business conditions. After completing the business indicators, Party B will enjoy the existing salary and get the excess reward. If it is not completed, the salary will be lowered appropriately.
5. Party A shall give Party B's employees rest days every month, and Party B shall make reasonable arrangements without affecting normal business. When the work is busy, Party B shall not take a vacation.
6. Party A has the right to conduct daily management of Party B according to Party A's management system. If Party B's personnel violate Party A's management system, Party A has the right to punish them.
Two. Rights and obligations of Party B
1. Party B shall ensure that at least one person works in Party A's kitchen (including cooking, chopping board, cold dishes, cakes and lotus flowers). Party B's personnel should have excellent skills to ensure product quality. Chef, head pot and anvil are required to reach the level of national first-class chef, and other chefs should also reach the level of national second-class chef.
2. Party B shall control the cost of the kitchen, meet the requirements of Party A, and ensure the realization of gross profit margin. If the gross profit margin does not reach or exceed the specified gross profit margin, the difference of 65,438+00% (compared with the total food business) will be deducted.
3. Party B sends the chef to organize a food seminar once a week, and invites the management of Party A to participate. While ensuring the quality of the dishes, we will constantly introduce new dishes and signature dishes of the hotel, so as to be new, strange, special and fresh (at least two new dishes are introduced every week).
4. Party B shall provide seasonal dishes and holiday dishes in time in combination with holidays and special circumstances of the hotel, and hold food festivals and other activities from time to time.
5. If the quality problems of kitchen products produced by Party B lead to customer complaints or returns, Party B shall bear the losses. ..
6. Party B shall do a good job in food hygiene. If the guest suffers from food poisoning or is punished by the epidemic prevention department due to Party B's management problems, this loss shall be borne by Party B; If the kitchen fire of Party A is caused by Party B's management problems, Party B shall bear the responsibilities and losses; Party B must strictly abide by the safety operation rules to ensure safety in production. If any injury is caused by illegal operation, Party B will not reimburse any expenses, but will also be held accountable. 7. Party B's personnel shall abide by Party A's management system. If Party B's personnel seriously neglect their duties and engage in malpractices for selfish ends, causing great damage to the interests of the hotel or serious violation of labor discipline, Party A has the right to demand compensation from Party B and pursue legal responsibilities according to law.
7. After Party B's personnel are employed by Party A, * * * is not allowed.
8. Party B's personnel shall abide by the hotel schedule, take good care of Party A's property and keep Party A's business secrets.
9. Party A shall make work clothes and work permits for Party B, and the expenses shall be borne by Party A.. After the expiration of the contract, Party A shall not deduct the expenses such as tooling.
10. If both parties terminate this agreement, Party B must find a chef before leaving, otherwise all consequences will be borne by itself.
1 1. Party B shall arrange personnel to be in place before the date of the month; Party B shall cooperate with purchasing personnel to buy raw materials in the market every day.
Three. Matters not covered in this agreement shall be settled by both parties through friendly negotiation. In case of labor dispute, both parties shall settle it through consultation. Unwilling to negotiate or failing to do so, they may apply to the Labor Dispute Arbitration Committee for arbitration.
Four. When this agreement is signed, Party A shall pay the company management fee to Party B..
Yuan.
Verb (abbreviation of verb) This agreement shall come into effect as of the date of signing, and any changes shall be invalid. This agreement is made in duplicate, each party holds one copy, which has the same legal effect.
Party A: Party B:
How to write the gym contract? In fact, it is best not to use a template casually, but to draw up according to the actual situation of the transaction. Moreover, lawyer services are all charged, and simple online consultation is also possible, but it is unrealistic to ask others to help draft the contract. Even if someone copies one for you, it's copied and pasted from the Internet, so you can't avoid your risk. It is recommended to find a local lawyer to draft it, and it won't cost much. Let's leave the professional things to the professional people. If you have any questions, you can ask them. If you are satisfied, please adopt them!
Party A: (Employer) Party B (Contractor) has reached the following agreement on the hydropower project of Party A based on the principle of mutual trust. Article 1 Project Overview 1. Decoration construction site: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. Materials provided by Party A Party B must submit a list of materials to be purchased in the next process to Party A at least three days in advance, and indicate the quantity of materials required. Party A shall provide the materials required by Party B on time. Party A is responsible for purchasing and supplying qualified products that meet the design requirements, and supplying them to the site on time, and both parties shall handle the handover procedures. If Party B finds any quality problems or specification differences in the materials provided by Party A, it shall promptly raise them with Party A, and Party A shall be responsible for the engineering losses caused by Party A's use. After the materials supplied by Party A arrive at the site on time, Party B shall be responsible for keeping them, and Party B shall be responsible for compensating the losses caused by improper keeping. 2. Decorative materials purchased and supplied by Party A shall be used for residential decoration specified in this contract, and Party B shall not use them for other purposes without Party A's consent ... If Party B violates this regulation, it shall compensate Party A at double the price of misappropriated materials. 3. The materials provided by Party B and the water and electricity materials provided by Party B shall be accepted on site. Do not meet the design and construction requirements or specifications are inconsistent, shall not be used. If it has been used, Party B shall be responsible for the losses caused to the project. Party B shall carry necessary tools (awls, cutting pieces, etc.). ) for construction. In order to ensure safety and good service performance, Party B shall bear the maintenance and loss expenses of the tools. Article 3 The agreement on project quality and acceptance is 1. This project strictly implements the national Code for Construction of Residential Decoration and Decoration Engineering (GB502 10-200 1) and Code for Quality Acceptance of Building Decoration and Decoration Engineering (GB50327-200 1), and refers to DB-35 such as Guangdong Family Decoration and Decoration Engineering Quality Standard. T98 "and" Shenzhen home decoration engineering quality acceptance standard "2. The cost of rework caused by Party B's poor construction technology and weak sense of responsibility shall be borne by Party B, and the construction period shall remain unchanged. 3. Project completion: Party B shall notify Party A of the acceptance two days in advance, and Party A shall organize the acceptance within two days after receiving the notice and go through the acceptance procedures. Article 4 Agreement on Safety Production and Fire Control Site Management: 1. Strictly abide by the stipulated decoration construction time, reduce construction noise and reduce environmental pollution. Deal with the problem of disturbing people by construction and the relationship with surrounding units and residents. 2. Without the consent of Party A and the approval of relevant departments, the original building structure and various equipment and pipelines shall not be dismantled and changed at will during construction. 3. Before the project is completed and handed over to Party A, be responsible for protecting all facilities and finished products on site. 4. Ensure the cleanliness of the decoration site, and do a good job of cleaning and handling before completion. 5. Responsible for handling the garbage generated by decoration, and cleaning it at least once a day. 6. If Party B needs to live on the site for construction reasons, he must pay attention to the safety of daily water and electricity consumption, and Party B shall be responsible for any work-related injuries that occur on the site. 7. Party B shall properly keep the construction materials and prohibit other personnel from entering the site. 8. Without Party A's permission, Party B shall not take any decoration materials provided by Party A out of the house. If it is found stolen, Party B shall pay double indemnity according to the material price. Article 5 Agreement on project price, contract content, construction technology and settlement: 1. Payment method of project funds: 50% of the salary will be paid after the pipeline laying is qualified, and 30% will be paid after the water and electricity are completed. Pay 20% after the overall completion acceptance. 2. Contents of Party B's signing: 1). Water and electricity slotting, wiring, threading and burying. 2). All garbage removal during hydropower construction (daily site classification and bagging). 3). Water and electricity construction wall, drilling, cutting. 5). Install the switch panel. 6) Install hardware, toilet and lamps in the later stage. Square meter (interior area) Article 6 Liability for breach of contract: 1. If Party A fails to make payment within the time stipulated in the contract, Party A shall pay Party B a penalty of 50 yuan for each day overdue. 2. If the completion is overdue due to Party B's reasons, Party B shall pay Party A a penalty of RMB 50 yuan for each day overdue. Article 7 Dispute Resolution: In case of any dispute over the quality of the project, both parties shall settle it through consultation; If the parties are unwilling to settle the dispute through negotiation or mediation, or if negotiation or mediation fails, they may bring a lawsuit to the people's court in accordance with this contract. Article 8 Modification and dissolution of the contract: 1. After this contract is signed by both parties, both parties must strictly abide by it. If either party needs to change the contents of the contract, it shall sign a supplementary agreement after consultation. After the contract is signed and before the construction, one party shall terminate the contract in written form, and pay liquidated damages at 10% of the total contract price, and go through the termination procedures. 2. In the process of construction, if either party proposes to terminate the contract, it shall submit it to the other party in writing, and both parties agree to go through liquidation procedures, conclude a termination agreement and terminate the contract. Article 9. Other protocols: 1. Both parties agree that the third party supervision company (decoration supervision company) will negotiate. Without the confirmation of the third-party supervision (decoration supervision company), Party A has the right not to pay the relevant expenses to Party B.. 2. After being confirmed by a third-party supervision company (decoration supervision company), Party A must pay relevant expenses to Party B as agreed. 3. If the construction period is delayed due to force majeure or unforeseeable factors such as climate and power failure, it can be postponed after confirmation by both parties. 4. Before entering the site, Party A may require Party B to go to the site for 5 times to cooperate with other types of work for cross-construction. For the part exceeding 5 times, Party A shall pay Party B the labor cost of 50 yuan/day. 5. During the warranty period, the quality problems caused by Party B's construction and products shall be repaired by Party B free of charge, and must arrive at the site within 48 hours after receiving Party A's notice ... For problems caused by Party A's improper use, force majeure or unforeseen reasons, Party A shall pay the maintenance fee to Party B according to the actual cost. Article 10 Supplementary Clauses (1) This contract shall come into effect after both parties sign (seal). (2) After signing this contract, the project shall not be subcontracted. (3) This contract is made in duplicate, with each party holding one copy. (4) This contract is valid until _ _ _ _ _ _ _ _ _ _. (5) The hydropower project is guaranteed for five years. After the warranty period, Party B shall pay Party A the corresponding maintenance expenses .. Signature of Party A: Signature (Seal) of Party B: MM DD YY (this contract is a hydropower project contract).
How to write the civil engineering electrical contract? This contract is mainly based on civil engineering. The electrical part can be signed as a component project, that is, it can be written into the construction scope of the contract. Construction organization design should also include electrical construction, budget and construction schedule.
How to write the housing contract of rural homestead in Guangdong can be found in Baidu Library, a consulting lawyer. It is suggested that the contract be awarded to a company or individual with a business license to avoid legal risks such as work-related injuries.
Rural housing contract _ Baidu Library
:wenku . Baidu ./view/b7ac 95 c 08 BD 63 186 bcebbc6a。
I contracted a static pile driver, and the boss asked me to write the contract: (hereinafter referred to as Party A)
Contractor: (hereinafter referred to as Party B)
In accordance with the Contract Law, the Regulations on Construction and Installation Engineering Contracts and the existing relevant regulations, and in order to clarify the rights, obligations and economic responsibilities of both parties in the construction process, the following clauses are specially formulated through negotiation:
I. Contents of the contract:
Party A agrees to enter into _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Specific projects include the erection, dismantling and maintenance of steel pipe scaffolding for external walls, transportation expenses back and forth, and labor expenses for erection of external frames. Materials include steel pipes, fasteners, vertical safety nets, bamboo sticks, etc. The above materials shall be owned by Party B, and shall be transported away by Party B after the demolition is completed.
Second, the quality requirements:
Outside the steel pipe scaffold stud spacing 1600 mm- 1800mm, internal and external stud spacing is 900mm, stud and wall spacing is 250 mm-300 mm, the facade must be built with scissors, and a safety net must be hung after each facade erection. All scaffolding shall be built according to the standards of Huizhou Public Security Bureau.
Three. Item and calculation method: (The following amount does not include tax)
(1) Calculation of the area of the external wall comprehensive scaffold: multiply the height by one meter at each corner of the concave-convex perimeter of the building (calculated to the top of the parapet, and add1.2m at the dripping point of the eaves with sloping roofs). The external wall scaffold at the exit of the discharging platform will not be deducted, and the external wall comprehensive scaffold is RMB _ _ _ _ _ yuan per square meter.
(2) Unloading platform: (width of unloading platform is 2m: area is calculated by 2m times height; 2m or more: the area is calculated by multiplying the long side by the height), and the unit price per square meter is calculated by the external wall frame.
(3) Safe passage, safety baffle, operation protective shed, etc. Should be calculated according to the actual construction area, the external stairs should be calculated by multiplying the perimeter by the height, and the unit price per square meter should be calculated according to the external wall frame.
(4) Single-row steel pipe fence for indoor stairs is RMB _ _ _ _ _ _ _ _ yuan for each floor of each staircase.
(5) The length of the building corridor (overpass) on both sides of the side is multiplied by the height, and the unit price per square is calculated according to the external wall frame.
(6) The perimeter and width in the elevator shaft are multiplied by the height, and the unit price per square meter is calculated according to the external wall frame.
(7) _ _ _ _ _ Yuan for each floor of material lifting platform, entrance and exit of people and goods elevator and retaining wall of tower crane.
(8) The whole house frame is _ _ _ _ _ _ yuan per cubic meter.
Party A shall be responsible for all sheet engineering materials and labor wages for the above projects.
Fourth, the time limit for a project calculation:
The above items and unit prices are calculated according to the construction period within _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Verb (abbreviation for verb) Terms of payment:
Party A shall pay Party B according to the installation progress. When the main body of the external scaffold is 50% completed, Party A shall pay _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
The responsibilities of both sides of intransitive verbs:
(1) Party A provides Party B with a place for stacking materials, domestic water, electricity and vertical transportation of equipment and materials.
(2) If Party A fails to pay the project payment to Party B on time, Party B has the right to stop work and recover the owed project payment.
(3) Party A shall cooperate with Party B to impose a fine on each player for stealing steel pipe fasteners. (If the steel pipe is found stolen, it will be punished by 20 times of the original price of the steel pipe. If the fasteners are stolen, each fastener will be punished by 200 yuan).
(4) Party A shall pay attention to the management of finished products outside the frame, and shall not dismantle the safety net and wall-pulling pole at will, and Party A shall be responsible for all rework caused thereby.
(5) Party B must obey the arrangement of Party A's management personnel and strictly control to ensure safety, quality and construction progress.
(6) The expenses for the items added outside this agreement or the modification and rework of Party A shall be supplemented by Party A to Party B, and the visa formalities shall be handled and paid monthly.
(7) Party B must ensure that the materials are sufficient and will not affect the construction progress of Party A, otherwise 500 yuan will be fined every time.
(8) Party B shall be responsible for the safety accidents during the erection of an outer frame.
(9) The embedded parts of Party B during installation shall be handled by Party A. ..
(10) Party B's personnel shall carry out civilized construction, and shall not fight or gamble on the construction site, otherwise they shall be punished according to Party A's management system.
Seven. Liability for breach of contract:
Party A and Party B shall perform the contents stipulated in this agreement, and if either party breaches the contract, it shall compensate the other party for its economic losses. During the construction, if the project is stopped for more than 30 days due to Party A's factors, Party A will pay 90% of the completed works to Party B, and Party B has the right to dismantle the completed works or calculate the rent according to Item 4 of this Agreement. Matters not covered in this contract shall be settled by both parties through negotiation or a supplementary agreement shall be signed separately.
This contract is made in duplicate, one for each party, with the same legal effect. This contract shall come into effect as of the date of signature or seal by both parties, and shall naturally become invalid after the project is completed and settled.
Party A: Party B: Huizhou Tengda Scaffolding Engineering Co., Ltd.
Representative: representative:
Tel: Tel:
Date of signing: Date of signing: